HomeMy WebLinkAboutOTTER BOX DISTRIBUTION/WAREHOUSE EXPANSION - FDP - 17-10/A - SUBMITTAL DOCUMENTS - ROUND 1 -0 •
OtterBox Distribution Center Expansion
PDP Final Plan Comment Responses
August 27, 2010
Page 9 of 9
Be sure and return all of your redlined plans when you re -submit.
Redlines were included with resubmittal.
Thinking outside of the box for over two decades.
401 W. Mountain Ave., Suite 200 ■ Fort Collins, CO 80521 ■ tel. 970.224.5828 ■ fax 970.224.1662 ■
www.vfrdesigninc.com
OtterBox Distribution Center Expansion
PDP Final Plan Comment Responses
August 27, 2010
Page 8 of 9
See Civil drawings & responses
Number: 21 Created: 7/27/2010
[7/27/10] The Stormwater is OK with the outlet pipe for the off -site water quality pond. Regular
maintenance is required to ensure the 4-inch pipe does not become plugged and to ensure the
pond function properly. Verbiage will be added to the development agreement stating if the pipe
does not allow the water quality pond to function properly some time in the future, a solution will
need to be designed and constructed at the owners expense.
See Civil drawings & responses
Number: 22 Created: 7/27/2010
[7/27/101 Please provide a talc showing the 4-inch pipe is large enough for the water quality
release rate.
See Civil drawings & responses
Number: 23 Created: 7/27/2010
[7/27/10] Please revise basin areas on the drainage plan.
See Civil drawings & responses
Department: Zoning Issue Contact: Jenny Nuckols
Topic: ZONING
Number: 12 Created: 7/27/2010
[7/27/10] Please remove topo lines from final site plan.
T000 lines were removed
Number: 13 Created: 7/27/2010
[7/27/10] Site plan - Show building envelope, footprint, note building dimensions.
Building envelope footprint and dimensions were added to the site plan
Number: 14 Created: 7/27/2010
[7/27/10] Light fixtures need to be down directional.
Note added to site plan (#10. sheet S-1).
Number: 15 Created: 7/27/2010
[7/27/10] What are the proposed colors of the building?
Colors included on architectural elevations.
Number: 16 Created: 7/27/2010
[7/27/10] Mechanical screening needs to match the color of the building
Noted. Note included on site plan (#9 sheet S-1)
Current Planning:
Thinking outside of the box for over two decades.
401 W. Mountain Ave., Suite 200 ■ Fort Collins, CO 80521 ■ tel. 970.224.5828 ■ fax 970.224.1662 ■
www.vfrdesigninc.com
• a
OtterBox Distribution Center Expansion
PDP Final Plan Comment Responses
August 27. 2010
Page 7 of 9
Department: Technical Services Issue Contact: Jeff County
Topic: Landscape Plan
Number: 4 Created: 7/23/2010
[7/23/10] Landscape Plan L-2 has line over text issues.
Text over line issues were corrected.
Number: 5 Created: 7/23/2010
[7/23/101 The scale on Landscape Plan L-3 is difficult to read. Could the aerial photo be
blocked out under it?
The aerial was removed and maopino provided from Natural Resources Department
Topic: Plat
Number: 1 Created: 7/23/2010
[7/23/10) The Plat boundary closes.
Number: 2 Created: 7/23/2010
[7/23/10] Please correct the misspelled word 'original' on the Subdivision Plat.
See Civil drawings & responses
Topic: Site Plan
Number: 3 Created: 7/23/2010
[7/23/10] Site Plan S-2 has illegible text & line over text issues.
Text over line issues were corrected.
Topic: Utility Plan
Number: 6 Created: 7/23/2010
[7/23/101 Utility Plan C300 has minor line over text issues.
See Civil drawings & responses
Department: Stormwater-Water-Wastewater Issue Contact: Wes Lamarque
Topic: Floodplain
Number: 41 Created: 7/30/2010
[7/30/101 Please see the Floodplain Review Checklist for all floodplain comments. One
comment in particular is regarding foundations. Please discuss in the text of the report type of
foundation construction. Will the foundation extend into the floodplain?
See Civil drawings & responses
Topic: Stormwater
Number: 19 Created: 7/27/2010
[7/27/10] Stormwater is ready for hearing.
Number: 20 Created: 7/27/2010
[7/27/10] Please provide a drainage easement for the southwest water quality pond.
i hinkirig outside of the box for over 1c,o decades
-
401 W. Mountain Ave., Suite 200 ■ Fort Collins, CO 80521 ■ tel. 970.224.5828 ■ fax 970.224.1662
www.vfrdesigninc.com
OtterBox Distribution Center Expansion
PDP Final Plan Comment Responses
August 27, 2010
Page 6 of 9
Number: 36 Created: 7/28/2010
KEY BOXES REQUIRED
Poudre Fire Authority requires a key box ("Knox Box") to be mounted in approved location(s) on
every new building equipped with a required fire -sprinkler system or fire -alarm system.
PLEASE NOTE: If only one Knox Box is currently in place, an additional Knox Box must be
installed. Knox Boxes are available at cost from the PFA Fire Prevention Bureau.
2006 International Fire Code 506.1; PFA BUREAU POLICY 88-20
A second knox box was added south of the entrance door (see site plan sheet S-1).
Number: 37 Created: 7/28/2010
PUBLIC -SAFETY RADIO AMPLIFICATION SYSTEM
Where adequate radio coverage cannot be established within a building, public -safety radio
amplification systems shall be installed in the following locations:
1. New buildings greater than 50,000 SF in size or addition(s) to an existing building that
cause the building to be greater than 50,000 SF. For the purpose of this section, fire walls shall
not be used to define separate buildings.
3. Existing buildings meeting the criteria of Items 1 and 2 of this section undergoing
alterations exceeding 50 percent of the aggregate area of the building.
Public -safety radio amplification systems shall be designed and installed in accordance with
criteria established by Poudre Fire Authority.
PFA Fire Prevention Bureau Administrative Policy 07-01
Amplification system will be provided and designed by specialty contractor design build system
per PFA requirements.
Number: 38 Created: 7/28/2010
ADDRESS NUMERALS
Address numerals shall be visible from the street fronting the property, and posted with a
minimum six-inch high numerals on a contrasting background. (Bronze numerals on brown brick
are not acceptable). 2006 International Fire Code 505.1
See Civil drawings & responses
Number: 39 Created: 7/28/2010
TURNING RADII
The required turning radii of a fire apparatus access road shall be a minimum of 25 feet inside
and 50 feet outside 2006 International Fire Code 503.2.4 and Appendix D103.3
See Civil drawings & responses
Number: 40 Created: 7/28/2010
FAST TRACK THURSDAY: PFA offers an accelerated review process in which the applicant
meets with Fire Prevention Bureau personnel with site, building and systems plans, and the
project receives approval (or tentative approval, pending necessary changes) in two hours.
There is no additional fee for this review. Fasts Track can be scheduled whenever your building
and/or fire protection system plans are completed and ready to be reviewed. Please contact me
if you're interested so we can schedule.
Thinking outside of the box for over two decades.
401 W. Mountain Ave., Suite 200 ■ Fort Collins, CO 80521 ■ tel. 970.224.5828 ■ fax 970.224.1662 .
www.vfrdesigninc.com
OtterBox Distribution Center Expansion
PDP Final Plan Comment Responses
August 27, 2010
Page 5 of 9
SPRINKLER REQUIREMENTS
This proposed building shall be fire sprinklered.
PLEASE NOTE: The building addition sprinkler system must be tied into the existing system, so
that there is only a single sprinkler system to monitor.
2006 International Fire Code Section 903
Storage in both the existing building and the addition will be high -pile storage. Commodities are
primarily Class A plastics in cardboard packaging on wood pallets. Per Table 2306.2 of the Fire
Code for type I -IV commodities high piled storage, area 20.0001-500,000 s.f.. automatic
sprinklers are required, and either smoke/heat vents or an ESFR sprinkler system is required
(footnote i gives the option for the ESFR system).
In the existing building. we will plan for the existing (conventional) sprinkler system to be
retained and possibly modified as required to meet the requirements for high -rack storage per
NFPA & Fire Code requirements. We will also add smoke/heat vents in the roof of the existing
building per Fire Code table 910.3. The exact modifications (if any) that will be required to the
sprinkler system will be determined by the Design -Build Sprinkler Subcontractor as part of their
design/engineering based on code requirements.
In the new addition. we will not use smoke/heat vents but we will install an ESFR type sprinkler
system.
We will modify the existing Fire Alarm system as necessary to monitor both sprinkler systems as
one.
Both new and existing sprinkler designs (entire building) will be submitted to PFA for review by
the Design -Build Sprinkler Subcontractor as a deferred submittal (it will not be submitted at the
time of the initial permit submittal).
Number: 33 Created: 7/28/2010
HIGH -PILED STORAGE: Any high -piled storage (12 feet or higher) shall meet applicable
requirements, including but not limited to, automatic fire sprinklers, rack spacing and alignment,
and combination of commodities, as set forth in Chapter 23 of the 2006 International Fire Code.
See Above.
Number: 34 Created: 7/28/2010
FIRE -PROTECTION SYSTEM CONTRACTOR: A sprinkler contractor will be able to determine
if a fire pump will be required to operate the fire sprinkler system and whether the existing 6-inch
fire line (for sprinklers) is of sufficient size to accommodate the needed flow.
See Above
Number: 35 Created: 7/28/2010
NO PARKING SIGNS: Thank you for showing the "NO PARKING" signs. Please change them
to NO PARKING FIRE LANE; I'd be happy to provide you with a sign template.
See Civil drawings & responses.
Thinking outside of the box for ovei iy o d�czues.
401 W. Mountain Ave., Suite 200 ■ Fort Collins, CO 80521 ■ tel. 970.224.5828 ■ fax 970.224.1662
www.vfrdesigninc.com
OtterBox Distribution Center Expansion
PDP Final Plan Comment Responses
August 27, 2010
Page 4 of 9
unobstructed at all times. A fire lane plan shall be submitted for approval prior to installation. In
addition to the design criteria already contained in relevant standards and policies, any new fire
lane must meet the following general requirements:
Be designed as a flat, hard, all-weather driving surface (asphalt or concrete) capable of
supporting fire apparatus weights. Compacted road base shall be used only for temporary fire
lanes or at construction sites.
Have appropriate maintenance agreements that are legally binding and enforceable.
Be designated on the plat as an Emergency Access Easement.
Maintain the required minimum width of 20 feet throughout the length of the fire lane (30
feet on at least one long side of the building when the structure is three or more stories in
height).
If the building is equipped throughout with an approved automatic fire -sprinkler system, the fire
code official is authorized to increase the dimension of 150 feet.
2006 International Fire Code 503.1.1, 503.2.3, 503.3, 503.4 and Appendix D
The fire lane, easement and maintenance agreement are provided as requested.
Number: 29 Created: 7/28/2010
WATER SUPPLY
Fire hydrants must be the type approved by the water district having jurisdiction and the Fire
Department. Hydrant spacing and water flow must meet minimum requirements based on type
of occupancy. Minimum flow and spacing requirements include:
• Commercial and multi -family dwellings 1,500 gpm at 20 psi residual pressure, spaced not
further than 300 feet to the building, on 600-foot centers thereafter
These requirements may be modified if buildings are equipped with automatic fire sprinkler
systems.
PLEASE NOTE: Please ensure the existing hydrants shown are in their actual, physical
location.
2006 International Fire Code 508.1 and Appendix B
We believe the existinq fire service line is 8" (not 6" ). Northern's civil drawinas for the oriainal
bldg dated 02/27/02 show an 8" fire line. I have viewed the existing sprinkler installation and the
pipe penetrating the floor is 8". Interestingly, there is an 8x6 reducing elbow that is bolted
directly to the flange of the 8" service entry pipe lust above the slab. The pipe entering the
existing sprinkler valve is 6" and the existing fire riser is 6". Just to be absolutely certain, we will
note on the civil drawinas that the contractor shall pothole the existina fire line to confirm that it
We will have a flow test done shortly to confirm the actual water pressure.
We plan to feed both the new and existing sprinkler systems off the existing 8" fire line if
possible.
Based on an 8" line and the pressure at the time the original bldg. was built. it appears that a fire
Pump will not be necessary. but that will be confirmed by the Design -Build Sprinkler
Subcontractor after we have the flow test data.
Number: 32 Created: 7/28/2010
Thinking outside of the box for over two decades
401 W. Mountain Ave., Suite 200 ■ Fort Collins, CO 80521 ■ tel. 970.224.5828 ■ fax 970.224.1662 ■
www.vfrdesigninc.com
OtterBox Distribution Center Expansion
PDP Final Plan Comment Responses
August 27, 2010
Page 3 of 9
Department: Natural Resources Issue Contact: Erica Saunders
Topic: General
Number: 24 Created: 7/27/2010
[7/27/10] Identify the "Natural Habitats and Features Buffer Zone" as the edge of the concrete
along the back lot line on the plat, site plan, and all sheets of the landscape plan. See redlines.
The Natural Habitats and Features Buffer was added to the plat. site plan and landscape plan
sheets as requested.
Number: 25 Created: 7/27/2010
[7/27/10] On Landscape plan sheets L-1 and L-3, and the site plan, show the location of
Boxelder Creek and provide straight-line distances to the Natural Habitats and Features Buffer
line. See redlines.
The Boxelder Creek alignment was added to the plans along with straightline distances to the
natural Habitats features Buffer line.
Number: 26 Created: 7/27/2010
[7/27/10] Include the note: "See Section 3.4.1(E) of the Fort Collins Land Use Code for
allowable uses within a natural habitats and features buffer zone." This note should be added
to the plat, site plan, and landscape plan.
The above note was added to the plat. site plan (#8. sheet S-1) and landscape plan (#15. sheet
1-2).
Topic: Landscape Plan
Number: 27 Created: 7/27/2010
[7/27/10] Add more plantings along the back lot line in the buffer zone, as well as off -site in the
stormwater detention pond (new and existing). Use all natives in this area, selecting species
from the City of Fort Collins Landscape Design Standards and Guidelines for Stormwater and
Detention Facilities. Include more shrubs to provide more structural diversity (e.g.,
serviceberry).
Native plantings (with the exception of Austrian Pines. per neighborhood meeting and later staff
approval) were selected from the City of Fort Collins Landscape Design Standards and
Guidelines plant list and added to the buffer area.
Department: PFA Issue Contact: Carie Dann
Topic: Fire
Number: 28 Created: 7/28/2010
EMERGENCY VEHICLE ACCESS
Thank you for showing the Emergency Access Easement. Please make the east boundary
(dotted line) easier to differentiate as the EAE on the plat. Also, please correct EASEMET on
page S-2 of the site plan.
This spelling correction was made.
REQUIRED ACCESS
Fire access roads (fire lanes) shall be provided for every facility, building or portion of a building
hereafter constructed or moved into or within the PFA's jurisdiction when any portion of the
facility or any portion of an exterior wall of the first story of the building is located more than 150
feet from fire apparatus access as measured by an approved route around the exterior of the
building or facility. This fire lane shall be visible by painting and signage, and maintained
Thinking outside of the box for over two decades.
401 W. Mountain Ave., Suite 200 ■ Fort Collins, CO 80521 a tel. 970.224.5828 ■ fax 970.224.1662
www.vfrdesigninc.com
OtterBox Distribution Center Expansion
PDP Final Plan Comment Responses
August 27, 2010
Page 2 of 9
detached walks on this site. There should be ample existing ROW to accommodate detached
walks. However, looking at the existing conditions, it may be difficult to detach the walk in
certain locations due to utility conflicts. If the walk must be attached it should be at least 5' in
width. If detached, 4.5' is the minimum width needed to meet ADA standards.
See Civil drawings & responses
Number: 11 Created: 7/26/2010
[7/26/10] Please provide spot elevations for all lot corners on the grading sheet. See redlines.
See Civil drawings & responses
Number: 18 Created: 7/27/2010
[7/27/10] Engineering is ready for hearing.
Department: Forestry Issue Contact: Tim Buchanan
Topic: Floodplain
Number: 42 Created: 7/30/2010
[7/30/10] Ten upsized mitigation trees need to be provided for significant trees to be removed.
Only four are shown in the plant list.
The 6 Kentuckv Coffee trees noted as mitigation trees on the first submittal were changed to 6
Lanceleaf Cottonwood. The total mitigation trees for this site include: 4 Plains Cottonwood and
6 Lanceleaf Cottonwood. Footnotes (easily missed) are indicated on the tree scientific name
and noted on the bottom of the plant list. These mitigation trees are 3 inch caliper.
Add this landscape note to the plan.
• The soil in all landscape areas, including parkways and medians, shall be thoroughly
loosened to a depth of not less than eight (8) inches and soil amendment shall be thoroughly
incorporated into the soil of all landscape areas to a depth of at least six (6) inches by tilling,
disking or other suitable method, at a rate of at least three (3) cubic yards of soil amendment
per one thousand (1,000) square feet of landscape area.
The above note was added to the landscape notes (note #16, sheet L-2).
Department: Light & Power Issue Contact: Alan Rutz
Topic: Light and Power
Number: 30 Created: 7/28/2010
[7/28/10] Subject to Electric Development Charges for the new lot.
Noted.
Number: 31 Created: 7/28/2010
[7/28/10] Please submit a C-1 form for building load information.
C-1 form was submitted with building permit.
Thinking outside of the box for over two decades.
401 W. Mountain Ave., Suite 200 ■ Fort Collins, CO 80521 ■ tel. 970.224.5828 ■ fax 970.224.1662 ■
www.vfrdesigninc.com
• a
land planning landscape architecture urban design = entitlement
August 27, 2010
Ted Shepard
City of Fort Collins, Current Planning
P.O. Box 580
Fort Collins, CO 80522
(970)221-6750
Provided below (underlined) are comment responses to staff 8/2/10 PDP comments:
ISSUES:
Department: Engineering Issue Contact: Andrew Carney
Topic: Plat
Number: 8 Created: 7/26/2010
[7/26/101 Is the existing lot line being vacated? If so, please note the line as being vacated on
the plat.
See Civil drawings & responses
Number: 9 Created: 7/26/2010
[7/26/10] The proposed emergency access easement on the plat needs to have at least 25'
radii curves. Curves number C7 & C11 are less than 25'.
See Civil drawings & responseE
Number: 10 Created: 7/26/2010
[7/26/10] Please correct the spelling of "original" on the Plat.
See Civil drawings & responses
Number: 17 Created: 7/27/2010
[7/27/10] The proposed off -site drainage easement will need to be dedicated by separate
document prior to final plan approval. A letter of intent has been submitted for this easement.
See Civil drawings & responses
Topic: Utility Plan
Number: 7 Created: 7/26/2010
[7/26/10] On the Air Care Colorado project across the Frontage road from this project, 4.5'
detached walks were required with a 7' parkway strip. Engineering would also like to see