Loading...
HomeMy WebLinkAboutFLATS @ THE OVAL - FDP - 26-08/A - CORRESPONDENCE - (10)Number: 102 Created: 3/12/2009 [3/12/09] Note the building height on the Elevations. At staff review on April 1" it was determined that another round of Final Plan review is necessary. Be sure and return all red -lined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970)221-6341. Yours Truly, Steve Olt City's Project Planner cc: Susan Joy Jon Sweet, Jim Sell Design Aller-Lingle Architects Current Planning file #26-08A Page 4 k. . approved if it's located INTERNALLY on the site (access via the alley). ALSO, please contact me for specific requirements for remote FDCs (height, color, angles, etc.). Number: 64 Created: 9/5/2008 [4/l/09] PFA will approve the new proposed name of The Flats at the Oval. [9/5/08] OVAL VS. OVAL FLATS: While DMS has the project listed as Oval Flats, the plan sheets showed The Oval. Please avoid referring to the project as simply The Oval. From an emergency response standpoint, calling this building The Oval could be very confusing. If we're dispatched to a call at The Oval, we could respond to the incorrect geometrical location, delaying when we access the patient. Department: Stormwater-Water-Wastewater Issue Contact: Wes Lamarque Topic: Stormwater Number: 111 Created: 3/31/2009 [3/31/09] Please provide better separation between the inlet and the nearest tree. Number: 112 Created: 3/31 /2009 [3/31/09] Please add text in the report that the site meets the water quality mitigation requirement from the regional UDALL water quality facility. Number: 113 Created: 3/31 /2009 [3/31/09] Please add pipe bedding detail for the A2000 storm pipe and a detail for the concrete channel. Number: 114 Created: 3/31 /2009 [3/31/09] Please see other minor comments on the red -lines. Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington Topic: Water/Wastewater Number: 28 Created: 9/2/2008 [3/31/09] Calculations not received. I will check to see if they were routed incorrectly. [12/16/08] The water service sizing calculations are needed soon to determine the size of the water service for the residential portion of the building. If a 3-inch service is needed, the meter vault is approximately 8 feet by 10 feet which will affect site layout. [9/2/08] Provide water service sizing calculations for review. Number:115 Created:3/31/2009 ' [3/31/09] On Sheet 4, revise Utility Notes 1 and 6 as noted on the red -lined plans. Department: Zoning Topic: Zoning Number: 4 [3/13/09] [ 12/ 11 /08] [8/21/08] Site Plan: to property lines. Issue Contact: Jenny Nuckols Created: 8/21 /2008 Please show building envelope, footprint, building dimensions, setbacks Page 3 Number: 110 Created: 3/31/2009 [3/31/09] Please see Karen McWilliams in Historic Preservation regarding the existing flagstone sidewalk. If the flagstone will not be used on -site, it must be carefully removed and taken to a City holding area for future re -use. Please label the Site, Landscape and Utility Plans that the existing flagstone must be carefully removed and returned to the City. Number: 116 [4/7/09] From Technical Services: Created: 4/7/2009 1. Boundary closes. 2. Minor scanning issues on Landscape, Lighting and Utility Plans. 3. Plat is "good to go". Department: Engineering Issue Contact: Randy Maizland Topic: Utility Plans Number: 79 Created: 12/ 17/2008 [3/18/09] Repeat: Please change the date to the Month and Year and remove "imp." from Sheet 8 in the index or spell out. Needs to match the title on Sheet 8 as well, so please change one or the other to match. [12/17/08] Please make some minor changes to the title at the top of the cover sheet. See red -lines for clarification. Number: 81 Created: 12/17/2008 [3/18/09] Repeat. Please enlarge the signature block to 4x6". [12/17/08] The City signature blocks are a little small. Please enlarge them slightly and use a consistent size on each sheet. Department: Light & Power Issue Contact: Alan Rutz Topic: Utility Plans Number: 108 Created: 3/26/2009 [3/26/09] No Comments Department: PFA Issue Contact: Carie Dann Topic: Fire Number: 60 Created: 9/5/2008 [4/1/09] Because there is not sufficient room in the public sidewalk area to construct a remote FDC, PFA will allow the fire sprinkler/standpipe connection to be building mounted. [9/5/08] FIRE DEPARTMENT CONNECTION: Fire department connections shall be installed remote from the buildings, and located on the street or fire lane side of buildings, fully visible and recognizable from the street or nearest point of fire department vehicle access or as otherwise approved by the fire code official. If possible, a fire hydrant shall be located within 100 feet of the FDC. PFA Bureau Policy. PLEASE NOTE: It is unlikely PFA will approve an on -building FDC. However, can you be more specific where your proposed on -building FDC would be located? Are you referring to the southwest corner of the building, adjacent to Laurel Street? Neither an on -building nor remote FDC would be Page 2 STAFF PROJECT REVIEW City of Fort Coffins BP Laurel LLC Date: 4/7/2009 c/o Kevin Brinkman 3003 East Harmony Road, Suite #300 Fort Collins CO 80528 Staff has reviewed your submittal for OVAL FLATS, FINAL PLANS, and we offer the following comments: ISSUES: Department: Engineering Issue Contact: Susan Joy Topic: Utility Plans Number: 103 Created: 3/24/2009 [3/24/09] Sheet 5 - Please label the two blown up areas so that it is clear which area you are detailing. Also, the second detail on the right is not quite clear to me .... which area is this representing? Number: 104 Created: 3/24/2009 [3/24/09] Sheet 8 - Please provide a drainage pan down the middle of the alley and show in plan, profile and typical section views. Number: 105 Created: 3/24/2009 [3/24/09] Sheet 9 - Please show what the end of the alley is tying into... show the existing walk, intersection. Number: 106 Created: 3/24/2009 [3/24/09] Sheet 10 - Where are you using detail 703? If not using, please remove. Please provide details 803, 1601, 1606a. Number: 107 Created: 3/24/2009 [3/24/09] Sheet 11 - Please remove detail 709 and replace it with D10 or DI from Stormwater, whichever is applicable. Number: 109 [3/31/09] From Inspection: Created: 3/31 /2009 1. Please detail the joint pattern for the concrete alley, show and dimension the alley pan, page 8. 2. The stormline should be 15" RCP going into Howes Street, not PVC. Page 1