Loading...
HomeMy WebLinkAbout637 COWAN STREET - PDP/FDP - FDP130030 - SUBMITTAL DOCUMENTS - ROUND 1 - UTILITY PLANSKiana Carter From: Barry Schram < barry@ lama rval leycraftsman.com > Sent: Saturday, July 20, 2013 12:57 PM To: Kiana Carter Subject: FW: 637 Cowan Street - raze existing house, plat the property, construct 2 new houses Follow Up Flag: Follow up Flag Status: Flagged See below .......... From: Glen Schlueter Imailto:GSCHLUETER@)fmov.com1 Sent: Thursday, January 26, 2012 1:05 PM To; Steve Olt; 'barry@lamarvalleycraftsman.com' Cc: Marc Virata; Gary Lopez; Peter Barnes; Jay Barber; Wes Lamarque; Roger Buffington Subject: RE: 637 Cowan Street - raze existing house, plat the property, construct 2 new houses Barry, An approved grading plan is also required before a building permit can be issued. It if is completed with the platting process, the grading can be included on the Utility Plan for the water and sewer services and it will save you time and effort in the building permit process. If done separately, please submit the grading plan directly to Stormwater at 700 Wood St. when you submit your building permit application at the building department. If you have any questions, please let me know. Glen 224-6065 From: Steve Olt Sent: Wednesday, January 25, 2012 11:15 AM To: 'barry@lamarvalleycraftsman.oDm' CC: Marc Virata; Gary Lopez; Peter Barnes; Glen Schlueter; Josh Weinberg; Sandy Lindell; Joe Olson; Ward Stanford Subject: 637 Cowan Street - raze existing house, plat the property, construct 2 new houses Barry, Thank you for your inquiry (below) regarding the proposed 2 new single family dwellings to be built at 637 Cowan Street. To create 2 separate platted lots for each new house it is necessary for you to go through the Project Development Plan with Subdivision Plat proces in the City of Fort Collins. Because the property is in the NCM — Neighborhood Conservation, Medium Density District the request is subject to an Administrative (Type 1) review, with a public hearing being held following development review. The decision maker will be a Hearing Officer. Attached are: New Project Routine Sheet showing the number of Subdivision Plats (14 copies) and Utility Plans (14 copies) to submit. Development Review Application showing fee to the Planning Department.