Loading...
HomeMy WebLinkAboutHARMONY TECH PARK 5TH FILING (INFRASTRUCTURE) - PDP - 22-08 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYLIST OF FIGURES Figure Page 1. Site Location ........................................ 3 2. Recent Peak Hour Traffic ............................. 4 3. Site Plan 8 4. Trip Distribution .................................... 9 I5. Short Range (2013) Background'Peak Hour Traffic ...... 10 6. Site Generated Peak Hour Traffic ..................... 12 7. Short Range (2013) Total Peak Hour Traffic ........... 13 S. Short Range (2013) Geometry .......................... 17 9. Site Plan ............................................... 19 10. Full Development Site Generated Peak Hour Traffic .... 21 11. Long Range (2030) Total Peak Hour Traffic ............ 22 12. Long Range (2030) Geometry ........................... 26 APPENDIX A Base Assumptions Form/Traffic Counts B Current Peak Hour Operation/Level of Service ,Descriptions/ Fort Collins LOS Standard C Peak Hour Signal Warrants D Short Range Background Peak Hour Operation E Short Range Total Peak Hour Operation F Pedestrian/Bicycle/Transit Level of Service Worksheets G Interior Intersections H Long Range Total Peak Hour Operation TABLE OF CONTENTS J Page 1 I. Introduction ......................................... 1 II. Existing Conditions ::::::............................ 2 Land Use 2 Roads _........... Existing Traffic ..................................... 2 I Existing Operation ................................... 2 Pedestrian Facilities ................................ 5 Bicycle Facilities .................................... 5 Transit Facilities ................................... 5 III. Proposed Development ......:........................... 7 Trip Generation 7 Trip Distribution ............. ............................. 7 Background Traffic Projections 7 Trip Assignment ...................................... 11 Signal Warrants ...... ***.... ._: Operation Analysis ................................... 11 Geometry.............................................. 14 Pedestrian Level of Service 14 Bicycle Level of Service ............................. 14 Transit Level.of Service 14 IV. Long Range Development ............................... 18 TripGeneration ...................................... 18 TripAssignment ...................................... 18 Total Traffic ........................................ 18 Operation Analysis ................................... 18 Geometry............................................. 25 V. Conclusions...........................................27 LIST OF TABLES Table Page 1. Current Peak Hour Operation .......................... 6 1 2. Trip Generation ...................................... 7 3. Short Range (2013) Background Peak Hour Operation .... 15 4. Short Range (2013) Total Peak Hour Operation 16 5. Full Development Trip Generation ..................... 20 6. Long Range (2030) Total Peak Hour Operation 23 THE HARMONY TECH PARK 51h FILING (PANATTONI BUILDINGS) INTERMEDIATE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JULY 2008 Prepared for: MAV Development Co. Market Place Building 303 Detroit Street, Suite 301 Ann Arbor, MI 48104 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive Loveland, CO 80538 Phone: 970-669-2061 FAX: 970-669-5034