HomeMy WebLinkAboutHARMONY TECH PARK 5TH FILING (INFRASTRUCTURE) - PDP - 22-08 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYLIST OF FIGURES
Figure
Page
1.
Site
Location ........................................
3
2.
Recent Peak Hour Traffic .............................
4
3.
Site
Plan
8
4.
Trip
Distribution ....................................
9
I5.
Short Range (2013) Background'Peak Hour Traffic ......
10
6.
Site
Generated Peak Hour Traffic .....................
12
7.
Short Range (2013) Total Peak Hour Traffic ...........
13
S.
Short Range (2013) Geometry ..........................
17
9.
Site
Plan ...............................................
19
10.
Full
Development Site Generated Peak Hour Traffic ....
21
11.
Long
Range (2030) Total Peak Hour Traffic ............
22
12.
Long
Range (2030) Geometry ...........................
26
APPENDIX
A Base Assumptions Form/Traffic Counts
B Current Peak Hour Operation/Level of Service ,Descriptions/ Fort
Collins LOS Standard
C Peak Hour Signal Warrants
D Short Range Background Peak Hour Operation
E Short Range Total Peak Hour Operation
F Pedestrian/Bicycle/Transit Level of Service Worksheets
G Interior Intersections
H Long Range Total Peak Hour Operation
TABLE OF CONTENTS
J
Page
1 I. Introduction ......................................... 1
II. Existing Conditions ::::::............................ 2
Land Use 2
Roads _...........
Existing Traffic ..................................... 2
I Existing Operation ................................... 2
Pedestrian Facilities ................................ 5
Bicycle Facilities .................................... 5
Transit Facilities ................................... 5
III. Proposed Development ......:........................... 7
Trip Generation 7
Trip Distribution ............. ............................. 7
Background Traffic Projections 7
Trip Assignment ...................................... 11
Signal Warrants ......
***....
._:
Operation Analysis ................................... 11
Geometry.............................................. 14
Pedestrian Level of Service 14
Bicycle Level of Service ............................. 14
Transit Level.of Service 14
IV. Long Range Development ............................... 18
TripGeneration ...................................... 18
TripAssignment ...................................... 18
Total Traffic ........................................ 18
Operation Analysis ................................... 18
Geometry............................................. 25
V. Conclusions...........................................27
LIST OF TABLES
Table
Page
1. Current Peak Hour Operation .......................... 6
1 2. Trip Generation ...................................... 7
3. Short Range (2013) Background Peak Hour Operation .... 15
4. Short Range (2013) Total Peak Hour Operation 16
5. Full Development Trip Generation ..................... 20
6. Long Range (2030) Total Peak Hour Operation 23
THE HARMONY TECH PARK 51h FILING (PANATTONI BUILDINGS)
INTERMEDIATE TRANSPORTATION IMPACT STUDY
FORT COLLINS, COLORADO
JULY 2008
Prepared for:
MAV Development Co.
Market Place Building
303 Detroit Street, Suite 301
Ann Arbor, MI 48104
Prepared by:
DELICH ASSOCIATES
2272 Glen Haven Drive
Loveland, CO 80538
Phone: 970-669-2061
FAX: 970-669-5034