Loading...
HomeMy WebLinkAboutHARMONY TECH PARK 5TH FILING (INFRASTRUCTURE) - PDP - 22-08 - CORRESPONDENCE - PLANNING OBJECTIVESQuestions/Discussion Items: l . Based on our discussions with the City, this process would require a PDP and subdivision plat. Since no buildings are proposed, would this be a Type I or Type II review process for the PDP? 2. A roundabout is proposed for the intersection of Technology Parkway and Timberwood Drive. What special design/review requirements would be needed for this feature? 3. Timing of right-of-way dedication vs. vacation. Should the plat be approved with the new right-of-way dedication before the vacation can occur? 4. Will Public Access agreements and or easements be required for properties using the private section of road from Old Timberwood to New Timberwood? Harmony Technology Park Fifth Filing — Infrastructure PDP MAVDevelopment 29 April 2008 Design Team: Developer — MAVDevelopment, Mark Melchi Architect — n/a Landscape Architect — BHA Design, Angela Milewski Civil Engineer — Stantec, Anthony Willkomm Proiect Description The proposal includes the development and approval of the remaining road, utility and storm drainage infrastructure design of the eastern half of the MAVD Harmony Technology Park site. There is no specific building project proposed at this time. We would like to complete the design and approval of these basic infrastructure improvements so that the framework is in place to guide the design of future individual sites within the Harmony Technology Park development. An approved development plan and plat currently exists for this site with vesting still in place. This previous plan developed by Hewlett-Packard accommodated a campus of very large footprint office buildings. The market for the larger -sized office buildings contemplated at the time of the design has shifted, so a revised conceptual master plan has been developed incorporating a mix of smaller office, mixed use and industrial uses. A pedestrian trail system is planned through the development and would generally follow the alignment of the open space / storm drainage and detention areas. The most significant change from the existing approved plans and plat is the realignment of Timberwood Drive between Lady Moon Drive and Technology Parkway. This alignment creates a more direct route for Timberwood Drive through the property avoiding the offset street configuration that was needed for the larger footprint building campus previously considered. This new road alignment was indicated on the revised ODP that was recently approved by the City. We intend to plat the right-of-way for this new alignment and simultaneously vacate the old Timberwood Drive right-of-way with this application. Recently two other projects have been reviewed by the City of Fort Collins within the Harmony Technology Park development. The Third Filing platted the southeast portion of the property and included development plans for Lot 2, Custom Blending. The Fourth Filing included plans for a four-story office building near the intersection of Harmony Road and Technology Parkway. This infrastructure PDP conforms with both of these development projects and bridges the gap creating a complete infrastructure design for roads, utilities and drainage from Harmony Road to Rock Creek Drive between Technology Parkway and Lady Moon Drive.