Loading...
HomeMy WebLinkAboutFORT COLLINS BREWERY - PDP - 32-08 - SUBMITTAL DOCUMENTS - ROUND 1 - APPLICATION (3)SITE E LINCOLN AVE Z 7L) N Lincoln and Lemay Mixed Use AConceptual Review - 6/16/2008 1 inch equals 300 feet ZONING DISTRICTS n t rm �G w • Yt, H x 4, 444 y • I f i 4 Vii I 4h MINE �-- .NMYIMRPO 1MI/YKKOfW -- ----_--__--- - -__ mom 1/SP1.0 site plan - conceot m rMY Ytr 11grMY nY+m1 eraOYfr PO 11Rw�Y. arm wtwn�n set nian.'aw Oa •Y�OI rnremww iiawr Y. sr11Q1 rrwar�io�m a3':;`rMK zO... (0/r10/o8 Conceptual Review Application. General Information All proposed development projects begin with Conceptual Review. Anyone with a development idea can schedule a Conceptual Review meeting to get feedback on prospective development Ideas. At this stage, the development Idea does not need to be finalized or professionally presented. However, a sketch plan and this application must be submitted to City staff prior to the Conceptual Review meeting. The more information you are able to provide, the better feedback you are likely to get from the meeting. Conceptual Reviews are scheduled on three Mondays per month. One half-hour meeting is allotted per applicant. Please call Current Planning at 416-2283 or 221-6750 to schedule a Conceptual Review meeting. Conceptual Review is a free service. Applications and sketch plans must be submitted to City staff no later than Spm on the Tt—sday prior to the Monday Conceptual Review meeting. Application materials can be dropped off in person to 281 N. College, emailed to RMlchels(alfcgov.com (or ftcolanning(a)msn.com) or faxed (970) 224-6134. At Conceptual Review, you will meet with staff from a number of City departments, including Current Planning, Light and Power, Natural Resources, Stormwater, Water/Wastewater, Zoning, Transportation, Engineering and Poudre Fire Authority. Comments are offered by staff to assist you in preparing the detailed components of the project application. There is no approval or denial of development proposals associated with Conceptual Review. After the meeting, a City planner will follow-up with the applicant in writing, summarizing staffs comments. Contact Name(s) and Role(s): Business Name (if applicable): Phone Number:_ cy _�-0 44 Z- 14 9 Cl Fax Number: .Y 41 ► S 't 0 Mailing Address: O L /v /t- F%-C Email AddC T::-o A-i'CO t_Li A1S ��2 r�if12 Go w` Site Address or Location Description: N LA) CO v1 Nr12 L-I /V C0 A) Ll L , AJ� Lo T-S 2- 6 11 N o p-Tl-r L.EYu� %06. Description of Proposal:(attach addibbna/sheets ifnecessary) MpRO.tl..tt-�nTS o1= 1��Q1Zdr(, 3o oey�i}3�AG C O uvt Un I O f'Fr c.E 09 e=Ts The project includes two building. the larger building is a single story structure approx. 26' tall which includes 3000 s.f. of restaurant and 27,750 s.f. of lt. industrial. The second building is a three story mixed use building of approx. 8,000 s.f. of retail, 4,000 s.f. of general office and approx. 12,000 s.f. of multi -family residential.