Loading...
HomeMy WebLinkAboutFORT COLLINS BREWERY - PDP - 32-08 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDY'N Wllloz Ln Lp 2ET j = i A 44. Lll+:nty $t Yen.:�uk 5i L"e� k aK^ 1 e 2!i E Al . n_. Linder me i, urrenbr. a, -..Lake Park F.. 57ka tit .. Cn-Oc, Z, g5 Y33yy$.: Q V;n 51 , L9e Mat1M E Vmo Dro PAAc C Site C s) ti. Okl Fort Co'Em /u',dery Ilo�..I ¢ Palk - Bac4nBr a^i St z INashinebn n T •ice 8ucknghmn Park 'c %y Palk E Uncoh Ave W Aeow twin Ave. Buckingham - ,Link-N-Gnxaw � = GWFCourae R Lib"ary Park "rg. Ficpre I; Vicinitt4 Map Transportation impact Studi. .? i!gust 2008 FrE Er,-7"Oering.LL: `! Ta? for Lane Forl Collins, CO 8028 1.0 Introduction This transportation impact study addresses the Fort Collins Brewery Relocation Project. The project is a development on the northwest comer of Lincoln Avenue and Lemay Avenue in the northern portion of Fort Collins. The site is currently vacant. The project will relocate and construct a new brewery operation and also add several residential units and a small portion of specialty. The brewery will also house a small restaurant. The project is scheduled to be constructed in one phase. The principal issue with the project is the Adequate Public Facilities requirements at the intersection of Vine/Lemay. Figure 1 on the following page is a vicinity map displaying the location of the project. 2.0 Agency Discussions Initial discussions with City staff indicated that an intermediate study traffic study as described in Chapter 4 of the Larimer County Urban Area Streets Standards (LCUASS) would be appropriate for this particular development. 1 Approved projects in the area that would affect the intersection capacity of Vine/Lemay 1 is the Eastwood development. This transportation impact study also included the 1 Capstone Student Housing project, Vine Drive Revitalization Project, and the Colorado Iron and Metal project. Traffic projections used in previous intersection capacity 1 reservation requests are used in this study. Appendix A contains the form (Attachment 1 A), which outlines the agreed to scope of the study. 1 10 1 Fort CollDts Bmi en Relocation Project ELB Engineering. LLC Transportation LnPaet Study L401 Tailor Lane 10 .au,rrrst '00,ti Fort Collins. CO 8052E a t1 List of Figures Figures Page 1. Vicinity Map 2 2. Existing Peak Hour Traffic 5 3. Site Plan 8 4. Trip Distribution 9 5. Site Distributed Traffic 11 6. Year 2010 Background Traffic 14 7. Year 2010 Total Traffic 12 8. Multimodal Evaluation Area 16 APPENDIX A. Base Assumptions/Scoping Form B. Traffic Counts C. HCM Capacity Analysis — Base Condition D. HCM Capacity Analysis — Background E. HCM Capacity Analysis — 2010 Total Traffic F. Pedestrian LOS Worksheet TABLE OF CONTENTS Page 1 Introduction 1 2. Agency Discussions 1 3. Existing Conditions 3 4. Project Description 6 5. Traffic Projections 10 6. Traffic Analysis 13 7. Improvements 15 8. Multimodal Analysis 16 9. Conclusions 19 List of Tables Table Page 1. LOS Definitions 4 2. Existing Operation 4 3. Trip Generation 6 4. 2010 Background Capacity Analysis 13 5. 2010 Total Traffic Capacity Analysis 14 6. Transit Travel Time Comparisons/Analysis 18 Fort Collins Brewery Relocation Project Transportation Impact Study Fort Collins, Colorado August 14, 2008 Prepared for: Mr. Tom Peters Outwest Properties, LTD 1900 East Lincoln Avenue Fort Collins, CO 80524 Prepared by: Eric L. Bracke, P.E., P.T.O.E. 5401 Taylor Lane Fort Collins, CO 80528 Office:970-988-7551 Faa:970-225-8942 ELBEnaineerinanjubroadba nd. net LL✓J fj7,jlil eenLr6. 1 C �� TlBdSJX7l'fd tlOd �Id22ILl�SOIll fl0779 Transportation Impact Study Fort Collins Brewery Relocation Fort Collins, Colorado August 2008