Loading...
HomeMy WebLinkAboutFORT COLLINS BREWERY - PDP - 32-08 - SUBMITTAL DOCUMENTS - ROUND 1 - PLANNING OBJECTIVESL_J 6. Name of project as well as any previous name the project may have had during Conceptual Review. a. Fort Collins Brewery 7. Response Letter (27 copies) addressing each of the applicable issues raised in the conceptual review letter. a. See attached Concept Review letter and Responses. 8. No street names proposed for this development plan. 9. Legal Description of the site. a. Lot 2 and 3, Replat of North Lemay Subdivision, Second Filing 10. The name and address of each owner of property within the boundaries of the development plan area. a. Out West Properties, LLC 1208 North CR 5, Ft. Collins, CO 80524 11. Out West Properties, LLC. Jan Peters -Member Tom Peters -Member 12. Development Schedule a. Close on Property -Fall 2008 b. Construction Start -Site and Building#1-Spring 2009 c. Constructions start-Building#2-Summer 2009 d. Construction Completion-Building#1-fall/winter 2009 e. Construction Completion-Building#2-spring 2010 Preview Architect ure+Planning 204 Wahiut Street Suitc A. 111:970-491 339l Fax_970-193-3398 i. Vehicular site circulation consists of one thru drive aisle. Access to the site is from North Lemay Avenue and East Lincoln Avenue. Access from North Lemay Avenue is right in, right out. Access from East Lincoln Avenue is proposed for % access. A variance application has been submitted to address site access . Site drive aisles are 30' wide at access to Lemay and 24' wide at access to Lincoln. The drive aisle at Lemay Avenue has been proposed at 30' wide to facilitate delivery vehicles at the loading/service area. ii. Pedestrian circulation is by 6' wide (minimum) onsite sidewalks. Sidewalks have been provided along parking areas adjacent to buildings. A pedestrian crosswalk area has been proposed between the two commercial building fronts. Building#2 proposes a 12' walkway adjacent to its commercial face. This pedestrian zone is to include site lighting and landscaping to contribute to a vibrant commercial frontage. On site pedestrian sidewalks are connected to public sidewalks at East Lincoln Avenue and North Lemay Avenue. iii. On site bike parking is provided for 30 bicycles (required biked parking is 5% of vehicular parking spaces =5 bike spaces). f. Transition areas i. Commercial street frontages include pedestrian walkways, covered and uncovered terraces, interior and perimeter landscaping and lighting to support the intended commercial uses. ii. Service areas are screened with landscaping. Several service entries are screened with wood screen walls consistent with the adjacent building design. The truck loading area has been recessed as much as possible to eliminate its sound and visual impact on onsite and neighboring uses. 3. Statement of proposed ownership and maintenance of public and private open spaces: applicant's intentions with regard to future ownership of all or portions of the project development plan. a. Proposed ownership and maintenance of public and private open spaces is by Out West Properties, LLC. Portions of Building#2 will be available for sale, maintenance of associated public and private open space will be by an HOA established prior to sale of any portions of Building#2. 4. Estimate of number of employees for business, commercial and industrial uses. a. Business : 16-20 employees b. Commercial -convenience retail: 6-9 employees c. Commercial -restaurant standard: 6-12 employees d. Industrial: 6 employees S. Written narrative addressing each concern/issues raised at the neighborhood meeting(s). a. A neighborhood meeting was held and no concerns or issues were raised. Preview Architecture+Planning 204 Walnut Streit. Suite A. Ph:970-4931-3 91 Fax_Q70-49 -339b J 4b c. The City will encourage new businesses and the retention and expansion of existing businesses that have made a positive commitment to the environment and community as evidenced by their corporate policies and practices. This project proposes a facility for the relocation and expansion of the current Fort Collins Brewery, increasing production capabilities and employment opportunities. The mixed use component of the project proposes a unique environment for office and commercial opportunities hoping to attract and anchor a number of tenants in a competitive northern Colorado market. This project is a significant private investment with -in the City of Fort Collins. Housing PRINCIPLE HSG-1: A variety of housing types and densities will be available throughout the urban area for all income levels. Policy HSG-1.1 Land Use Patterns. The City will encourage a variety of housing types and densities, including mixed -used developments that are well -served by public transportation and close to employment centers, services, and amenities. In particular, the City will promote the siting of higher density housing near public transportation, shopping, and in designated neighborhoods and districts. This project proposes 12 residential units ranging in size from 600 s.f. to 2400 s.f. units in order to provide housing for a greater range of tenants. The residential component supports the adjacent public transportation node as well the adjacent recreational amenities. The sites close proximity to Old Town reinforces the suitability of a residential component. 2. Description of proposed open space, wetlands, natural habitats and features, landscaping, circulation, transition areas, and associated buffering on site and in the general vicinity. a. Description of proposed open spaces include pedestrian walkways, covered and uncovered terraces adjacent to commercial uses, landscaped perimeters of buildings and a landscaped detention area. b. This project does not propose any wetland areas. c. This project does not propose any natural habitats. d. Landscaping is proposed to meet the standards of the City of Fort Collins Land Use code. Landscaping includes required street plantings, perimeter plantings along building footprints, and landscaping within the off street parking areas. The project also proposes landscaping within and adjacent to the detention area in order to transform the detention area into a site landscape amenity. e. Site circulation Preview ArchiteetureA-Planning204 Walnut Street Suite A. 111070-49 3 3'91 Fax:970-49:3-3398 • character of the area by designing to the high standards set by the precedent projects. Without copying or mimicking the previous projects this project proposes building masses, colors, details and relationships similar to the precedent projects. PRINCIPLE CAD-4: Security and crime prevention' will continue to be important factors in urban design. Policy CAD-4.1 Crime Prevention and Security. A natural approach to crime prevention will continue to be important in the design and layout of new development. Natural crime prevention means the natural community surveillance that results from visibility and observation by citizens who feel a sense of ownership of the community. These qualities will continue to be fostered by the urban design of development. Anonymous environments, hidden areas, difficult access, etc. will be addressed and avoided. This project proposes mixed uses in a location which is predominantly commercial and is somewhat isolated from an active full time community. By including residential and office component in the project the site and adjacent properties will benefit from the observation by citizens who feel a sense of ownership of the community. Policy CAD-4.2 Lighting and Landscaping. Security lighting should generally be at low, even levels to create comfortable area -wide visibility and not highly contrasting bright spots and shadows. Lighting should be selected to reduce glare and preserve "dark sky" views of night skies. Landscaping should be designed to avoid hidden areas, particularly where such areas may be used at night, such as near building approaches and entrances. This project includes a photometric study which supports the aim of providing security at low, even levels. Full cut-off fixtures have been specified which support the City's "dark sky' goals. Economic Sustainability and Development PRINCIPLE ECON-1: The City will pursue a balanced and sustainable economic development program. Policy ECON-1.1 Balance of Employment Opportunities. The City will support the enhancement of its economic base and job creation by supporting the location of new businesses and the retention of existing businesses in the following ways: a. The City will encourage the establishment of new businesses and the retention and expansion of existing businesses that provide higher wage jobs (above the County average) for base employment opportunities. b. The City will assist in retaining, expanding and attracting businesses that diversify our economic base. Preview Architccture4 Planning 204 Walnut Street. Suite A. Ph:970-493-3391 Fax:970-493-3398 0 • this project proposes to maximize the appeal of its outdoor space by landscaping and designing its detention area to transform it from utilitarian detention to functional, landscaped amenity adjacent to the intersection. Policy CAD-1.7 Street Art. The City will encourage the incorporation of artistic elements such as sculpture, into the streetscape design. Recognizing the City's interest in enhancing Streetscapes and recognizing project budgets this project seeks to identify opportunities to meet multiple goals. In an attempt to reduce the scale of building materials and specifically the industrial metal cladding of the industrial portion of the building this project identified an opportunity to cost effectively deal with the issue by including an art wall. In place of a monument sign, or typical commercial signage this project proposes an area to include a wall of art. This portion of the building will blend art and landscaping to bring interest to the Streetscape. PRINCIPLE CAD-3: Commercial developments create a powerful impression of the City, both individually and taken together as a whole. While corporate franchises and chain stores will remain vital and recognizable, commercial developments will be designed to contribute to Fort Collins' distinct visual quality and uniqueness. Policy CAD-3.1 Modification of Standardized Commercial Architecture. Commercial buildings will demonstrate a reflection of local values with site -specific design. Standardized architectural prototypes will be modified, if necessary, so that the City's appearance remains unique. Development will not consist solely of repetitive design that may be found in other communities. This project supports the Cities view of standardization, and while many standardized building and design models would have suited the intended use of this project, the project proposes to subscribe to a higher design goal. The design standards set for this project aim to establish the significance and permanence of this project within the City of Fort Collins, and as such contribute to the impression of the City itself. Policy CAD-3.2 Compatibility with Surrounding Development. Proposed commercial buildings must contribute to the positive character of the area. Building materials, architectural details, color range, building massing, and relationships to streets and sidewalks will contribute to a distinctive local district, corridor, or neighborhood. This project finds itself in close physical proximity to the other major Fort Collins Breweries. In recognizing the significant of these breweries within the local culture this project proposes to contribute to that positive llrevievv Architecture+Pianning'204 Walnut Street Suite A. 111:970-493-3) i91 Fa.x:970-493-3198 L- supports the existing public transportation system. It reinforces the significant intersection of Lincoln and Lemay with a significant project, catalyzes positive growth along Lincoln and Lemay Avenues and complements existing land uses. The project reduces the potential for further dispersed growth along Lincoln Avenue. The project reinforces pedestrian and transit use. This project contributes to character of place by dismissing the common typology of what light industrial buildings should be, proposing a typology that not only blends with the urban fabric but attempts to further define it. Transportation PRINCIPLE T-1: The physical organization of the city will be supported by a framework of transportation alternatives that balances access, mobility, safety, and emergency response throughout the city, while working toward reducing vehicle miles traveled and dependence upon the private automobile. This project does not propose any new public streets. This project has proposed a design for ultimate Lincoln and Lemay Avenues per their current street classifications. This project proposes City sidewalks per city standards along Lincoln and Lemay Avenues and ties on site pedestrian walkways to these public sidewalks. This project does support Fort Collins bike community by providing bike parking at a 1:3 ratio to vehicular parking greatly exceeding the city standards. This project proposes a public transportation bus stop to current standards, in place of the current existing bus stop. Community Appearance and Design Policy CAD-1.4 Street Tree Design. Street trees should be used in a formal architectural fashion to reinforce, define and connect the spaces and corridors created by buildings and other features along a street. Canopy shade trees will constitute the majority of tree plantings, and a mixture of tree types will be included, arranged to establish partial urban tree canopy cover. Existing trees will be preserved to the maximum extent feasible. This project proposes canopy shade trees as much as possible along Lincoln and Lemay Avenues. The site is affected by a sizable overhead power line easement. Where the power line easement prohibited the use of canopy trees, ornamental trees have been substituted. PRINCIPLE CAD-2: Public spaces, such as plazas, civic buildings, outdoor spaces, parks, and gateway landscapes should be designed to be functional, accessible, attractive, safe and comfortable. In recognizing the significance of the intersection of Lincoln and Lemay Avenues and needing to meet a requirement for storm water detention Preview Architecture+Planning 204 Walnut Street Suite A. Ph:970-493-..ri91 Fax:970-493-3198 0 dwelling units. The building architecture reflects the Fort Collins Brewery building's modern design vocabulary but with a strong urban typology. Project concerns include site access from North Lemay Avenue and East Lincoln Avenue. An existing median along North Lemay Avenue does not allow site access to north bound traffic. If East Lincoln Avenue is built to current standards a median would need to be included resulting in no site access to east bound traffic along East Lincoln Avenue. With no access to east bound traffic along Lincoln and no site access to north bound traffic along Lemay the site would be inaccessible. The project is submitting for a variance in order to include a left in along East Lincoln Avenue. Since the property is zoned Industria is ric an supports industrial uses i is essentia to provide effective truck access to this site. We understand that a property owner on East Lincoln Avenue is working with the City of Fort Collin's in an effort to re-classify East Lincoln Avenue as a two lane arterial. This project supports that effort as it would help resolve the sites accessibility concerns. The Fort Collins Brewery owners, Preview Arch itecture+planning and Apex Engineering look forward to working closely with City Staff in an effort to receive project approval as swiftly as possible. 1. Statement of appropriate City Plan Principles and Policies achieved by the proposed plan. a. Community Wide Land Use PRINCIPLE LU-1: Growth within the City will promote a compact development pattern within a well-defined boundary. PRINCIPLE LU-2: The City will maintain and enhance its character and sense of place as defined by its neighborhoods, districts, corridors, and edges. The proposed site is zoned Industrial District, and is located at a significant traffic intersection of Lincoln and Lemay Avenues. It has at its south property an existing bus stop for public transportation. Further south of the property is a popular recreation area (golf course). Just south of the golf course is an extensive recreation trail system. This project could have proposed a simple industrial warehouse which would have met the client's needs but would not have reinforced the potential vibrancy of this site. Such a project would not have reinforced the significance of the intersection of Lincoln and Lemay Avenues, it would not have reinforced the existing adjacent property uses in a positive manner, it would not have catalyzed any future positive growth along Lincoln or Lemay Avenues, the project would have simply taken advantage of a location. The project however proposes a number of buildings with mixed uses, significantly different from a simple warehouse. This leads to increased density and diversity of users, and contributes to the vibrancy of place. It takes advantage of and Preview Architecture--111anning 204 Walnut Sircet Suite A. Ph:970-19 -3 91 Far:9710-493-3398 A. 0 a F11 1pE CT Fort Collins Brewery — Statement of Planning Objectives Sept 12, 2008 Project - Fort Collins Brewery Preview Architecture+Planning Project number — 2008-106 Statement of planning objectives �_,A N N I N G Project Description: The Fort Collins Brewery project is proposed for a site located at the intersection of North Lemay Avenue and East Lincoln Avenue. The site is at the north-west corner of this intersection. Neighboring properties include the Bank of Colorado at the north east corner of the intersection, a commercial property at the south west corner and a multi -family development at the south east corner. A single story commercial project of multiple tenants is located to the north of the proposed property. A single story self storage project is located to the west of the proposed site and a golf course is located to the south of the proposed site. The site is zoned Industrial District, the permitted uses of this zoning supports the proposed uses of this project. The proposed site allows the current Fort Collins Brewery to relocate and expand its facility closer to the Old Town center, and much closer to Fort Collin's two other major Breweries solidifying the breweries 'position' in the Fort Collins community. The Fort Collins Brewery project includes two buildings. The first is the proposed Fort Collins Brewery, a new facility for the rapidly growing Fort Collins Brewery. This building is approximately 30,000 s.f. and includes the brewing facility, support office spaces, a community meeting room, and restaurant. The building architecture reflects local agrarian vernacular in a progressive modern manner rather than supporting the simple warehouse function that the program demands. As such the proposed project supports and further enhances the Fort Collins urban and community fabric. The building is anchored to its site with a pedestrian walkway which connects to the city sidewalks, enhanced with a landscape plan which responds to the building, site and city standards. The project responds its proximity to Old Town Fort Collins and to the other major breweries by providing ample bike racks. The second building is a mixed use project of approximately 31,500 square feet. This 4 story building includes retail space for local convenience services/offices and 12 residential Preview Architeeture+Planning 204 Walnut Street. Suite A. 111070-491-3 91 Fax:971!0A91-3,398