HomeMy WebLinkAboutSETTLER'S CREEK FIRST REPLAT - PDP - 13-08 - DECISION - MINUTES/NOTESSettler's Creek Ist Replat •
Administrative Hearing
Findings, Conclusions, and Decision
July 23, 2008
Page 5 of 5
DECISION
The Settlers Creek First Replat, #13-08 is hereby approved by the
Hearing Officer without condition.
Dated this 24th day of July, per authority granted by Sections
1.4.9(E) and 2.1 of the Land Use Code.
' `l
o.
Cameron Gloss
Current Planning Director
Settler's Creek 151 Replat • •
Administrative Hearing
Findings, Conclusions, and Decision
July 23, 2008
Page 4 of 5
The Staff Report summarizes the PDP's compliance with these standards and no
specific evidence was presented to contradict or otherwise refute the compliance
with Article 4 or the HC District Standards. In particular, multi -family residential is
an allowable use within a Regional Shopping Center in the Harmony Corridor.
Similarly, the 4,000 square feet of non-residential (office, retail or personal
service shops) is also allowed within such a center. The clubhouse, pool and
bed and breakfast guest rooms are considered accessory and also permitted.
There are no zone district standards that pertain to the platting or replatting of
property.
3. Compliance with Article 3 of the Land Use Code — General Development
Standards
The Project Development Plan complies with all applicable requirements of
Article 3, including the plat standards of Section 3.3.1, and no evidence was
presented to contradict the statements and conclusion of the staff report
concerning compliance or to other refute the compliance with Article 3.
The plat creates no new lots or new dwelling units. As with the previous plat, the
replat continues to direct vehicular access from a street and the new lot lines are
substantially at a right angle or radial to the street. The plat continues to provide
drainage and utility easements, and grants additional easements as needed to
serve the lots.
SUMMARY OF CONCLUSIONS
A. The Settlers Creek First Replat is subject to administrative review and the
requirements of the Land Use Code (LUC).
B. The Settlers Creek First Replat complies with the Harmony Corridor Plan.
C. The Settlers Creek First Replat complies with all applicable district standards of
Section 4.26 of the Land Use Code, (HC) Harmony Corridor zone district.
D. The Settlers Creek First Replat complies with all applicable General
Development Standards contained in Article 3 of the Land Use Code.
Settler's Creek 1s` Replat •
Administrative Hearing
Findings, Conclusions, and Decision
July 23, 2008
Page 3 of 5
FACTS AND FINDINGS
1. Site Context/Background Information
The surrounding zoning and land uses are as follows:
N: H-ClExisting Multi -family (Somerset and Park Place - Reflections)
S: H-C; Existing Retail (Home Depot)
E: M-M-N; Landings Neighborhood Park
W: H-C; Existing Retail (Goodwill Industries)
The site was once a part of the Super Block Plan that master planned the
general area bounded by College Avenue, Harmony Road and Boardwalk Drive
back in the late 1970's. This Plan was done in conjunction with the formation of
the Heart Special Improvement District that financed and constructed the public
streets and other facilities in the Super Block area. This S.I.D. has since been
closed out.
The parcel was designated by the Harmony Corridor Plan as being part of the
Harmony Center Mixed -Use Activity Center — Regional Shopping Center.
Harmony Centre Regional Shopping Center was approved in May of 1997 for
339,634 square feet on 36.83 acres on the site of the former Pioneer Mobile
Home Park.
Settlers Creek P.D.P. was approved for 231 dwelling units in November of 2004,
including a Modification of Standard to Section 3.5.2(C)(1)(2) which allowed
Buildings C,D,E,F and G to be located further than 200 feet from the sidewalk
along J.F.K. Parkway or 350 feet if connected by a major walkway spine.
Settlers Creek Final Plan was approved for 229 dwelling units in February of
2007 under different ownership.
Since the approval of the Final Plan, Pavilion Lane has been extended east to
form a tee intersection with J.F.K. Parkway as part of the Goodwill Industries
development.
2. Compliance with Article 4 and the HC — Harmony Corridor Zoning District
Standards:
The Project Development Plan complies with all applicable requirements of
Article 4 and the HC zone district.
Settler's Creek 1 st Replat • •
Administrative Hearing
Findings, Conclusions, and Decision
July 23, 2008
Page 2 of 5
SUMMARY OF HEARING OFFICER DECISION: Approval
ZONING DISTRICT: H — C Harmony Corridor
STAFF RECOMMENDATION: Approval
NOTICE OF PUBLIC HEARING: Evidence presented to the Hearing Officer established
no controversy or facts to refute that the hearing was
properly posted, legal notices mailed and notice
published.
PUBLIC HEARING
The Hearing Officer, presiding pursuant to the Fort Collins Land Use Code, opened the
hearing at approximately 5:07 p.m. on July 23, 2008 in Conference Rooms C & D, 281
N. College Avenue, Fort Collins, Colorado.
HEARING TESTIMONY, WRITTEN COMMENTS AND OTHER EVIDENCE:
The Hearing Officer accepted during the hearing the following evidence: (1) Planning
Department Staff Report; (2) application, plans, maps and other supporting documents
submitted by the applicant and the applicant's representatives to the City of Fort Collins;
and (3) a tape recording of the public hearing. The LUC, the City's Comprehensive
Plan (City Plan), and the formally promulgated policies of the City are all considered
part of the evidence considered by the Hearing Officer.
The following is a list of those who attended the meeting:
From the City:
Ted Shepard, Chief Planner
From the Applicant:
John Myers, JR Engineering
From the Public:
John and Mary Detweiler, 4255 Westshore Way B3
Written Comments:
None.
ent and -AnSDortati
Current Planning
Citvof Fort Collins
CITY OF FORT COLLINS
ADMINISTRATIVE HEARING OFFICER
TYPE I ADMINISTRATIVE HEARING
FINDINGS, CONCLUSIONS AND DECISION
ADMINISTRATIVE HEARING DATE
PROJECT NAME:
CASE NUMBER:
APPLICANT:
.7'► , z
HEARING OFFICER:
PROJECT DESCRIPTION:
July 23, 2008
Settlers Creek First Replat
#13-08
Mr. Bryan Aston
c/o JR Engineering
2600 East Prospect Road
Fort Collins, CO 80524
MSP Properties
607 Lindbergh Boulevard
Frontenac, MO 63131
Cameron Gloss
Current Planning Director
The Applicant has submitted a request to replat Settlers Creek in order to accommodate
one additional van -accessible handicap parking space located within Building Envelope
8. By adding this one handicap parking space, Building Envelope 8 must be enlarged
and all five garages along the south edge of the property are impacted. The
enlargement of one garage and the shifting of four garages cause an encroachment into
dedicated utility easements. In order to adjust the building envelopes and easements,
the plat must be revised. The proposed replat makes these adjustments.
The site is bounded by J.F.K. Parkway on the west, Home Depot on the south,
Landings Park on the east and Park Place (Reflections Apartments) at the Landings on
the north. There would be no increase in the number of dwelling units (229).
281 North College Avenue • PO Box 580 0 Fort Collins, CO 80522-0580 • (970) 2216750 • FAX (970) 416-2020