Loading...
HomeMy WebLinkAboutSETTLER'S CREEK FIRST REPLAT - PDP - 13-08 - CORRESPONDENCE - (3)_Ted Shepard - FW: Fort Collins Site Page 1 From: "Bryan Aston" <baston@mlpllc.com> To: <tshepard@fcgov.com> Date: 03/06/2007 7:04:59 AM Subject: FW: Fort Collins Site Ted - See calculations below. Stan and I land in Denver today at 11:50am. We will immediately drive up to Ft. Collins for our 1:15pm meeting. If I'm running late, I will call you. From: Jim Parker [mailto:jparker@parkertulsa.com] Sent: Monday, March 05, 2007 10:08 PM To: Bryan Aston Subject: Fort Collins Site Bryan: Per our conversation I did the coverage calculations for the original site plan and our option with the additional building. The areas are as follows: Original Siteplan: Building Coverage: 140,548SF Parking Coverage: 123,537SF Total Coverage Bldgs & Parking: 264,121SF New Site Design: Building Coverage: 117,563SF Parking Coverage: 134,241SF Total Coverage Bldgs & Parking: 251,804SF Therefore, although our parking coverage is greater the smaller building footprints cause the total coverage to be 12,317SF less with the new design. Sidewalks should be about the same with both. Therefore the storm water calculations should be better than with the original design. Jim E. Parker , 2217 East 23rd Street -�t Tulsa, OK 74114 _ jparker@parkertulsa.com J �~ Tx—e - -2-�