Ted - See calculations below. Stan and I land in Denver today at
11:50am. We will immediately drive up to Ft. Collins for our 1:15pm
meeting. If I'm running late, I will call you.
From: Jim Parker [mailto:jparker@parkertulsa.com]
Sent: Monday, March 05, 2007 10:08 PM
To: Bryan Aston
Subject: Fort Collins Site
Bryan:
Per our conversation I did the coverage calculations for the original
site plan and our option with the additional building. The
areas are as follows:
Original Siteplan: Building Coverage: 140,548SF Parking
Coverage: 123,537SF Total Coverage Bldgs & Parking: 264,121SF
New Site Design: Building Coverage: 117,563SF Parking
Coverage: 134,241SF Total Coverage Bldgs & Parking: 251,804SF
Therefore, although our parking coverage is greater the smaller building
footprints cause the total coverage to be 12,317SF less with
the new design. Sidewalks should be about the same with both. Therefore
the storm water calculations should be better than with the original
design.