Loading...
HomeMy WebLinkAboutPROVINCETOWNE FILING 5 - FDP - FDP130025 - CORRESPONDENCE - (3){ Comment Number: 5 Comment Originated: 07/02/2013 07/02/2013: Please make all landscape text the same size & lineweight. See redlines. Topic: Plat Comment Number: 6 Comment Originated: 07/02/2013 07/02/2013: Please change the Notice Of Easement Vacation statement to read "Unless otherwise shown hereon, all drainage easements and utility easements shown on lots 4-9, block 7...". See redlines. Comment Number: 7 Comment Originated: 07/02/2013 07/02/2013: Please remove the distances marked, and add distances where marked on sheet 2. See redlines. Comment Number: 8 Comment Originated: 07/02/2013 07102/2013: Please move the 3' DE (TYP) note, so that it is not covering the easement lines on sheet 2. See redlines. Topic: Site Plan Comment Number: 9 Comment Originated: 07/02/2013 07/02/2013: There are line over text issues on sheet 1. See redlines. Comment Number: 10 Comment Originated: 07/02/2013 07/02/2013: Please remove all lot information (bearings & distances) that are outside of the project boundary. See redlines. Department: Zoning Contact: Gary Lopez, 970-416-2338, glopez(a)fcgov.com Topic: General Comment Number: 1 O6/10/2013: No comments. Comment Originated: 06/10/2013 Page 3 of 3 It Comment Number: 1 Comment Originated: 06/10/2013 06/10/2013: The electric utility facilities to serve this development will be installed between the curb and sidewalk. Where the sidewalk and/or landscaping has already been installed, it was out of the normal installation sequence. The developer will be required to either provide the electric trench, or pay the additional costs for directional boring. Light & Power will not be responsible for damage to the sidewalk or landscaping. Comment Number: 2 Comment Originated: 06/10/2013 06/10/2013: There will be 2 streetlights added on this project. One between lots 9 & 10 in block 1, and one between lots 2 & 3 in block 2. The landscape plan will need to be adjusted to provide a minimum of 40 feet clearance between these lights and street trees (15 feet if the tree is an ornamental type). Department: PFA Contact: Jim Lynxwiler, 970416-2869, jlynxwiler(a)poudre-fire.orq Topic: General Comment Number: 1 Comment Originated: 07/03/2013 07/03/2013: All prior PFA concerns have been resolved. No further comment. Department: Stormwater Engineering Contact: Jesse Schlam, 970-218-2932, jschlam a()fcgov.com Topic: Erosion Control Comment Number: 1 07/02/2013: No erosion control comments. Contact: Wes Lamarque, 970-416-2418, wlamargue(a.fcgov.com Topic: General Comment Number: 2 07/02/2013: No comments. Department: Technical Services Contact: Jeff County, 970-221-6588, jcountyAfcgov.com Topic: Construction Drawings Comment Originated: 07/02/2013 Comment Originated: 07/02/2013 Comment Number: 1 Comment Originated: 07/02/2013 O7/02/2013: There are line over text issues on sheets 44, 75 & 76. See redlines. Topic: Landscape Plans Comment Number: 2 Comment Originated: 07/02/2013 07/02/2013: There are line over text issues on sheet 1. See redlines. Comment Number: 3 Comment Originated: 07/02/2013 07/02/2013: There are text over text issues on sheet 1. See redlines. Comment Number: 4 Comment Originated: 07/02/2013 07/02/2013: Please remove all lot information (bearings & distances) that are outside of the project boundary. See redlines. Page 2 of 3 F6rt Collins July 03, 2013 Michael Brake JR Engineering 2900 S. College Ave. Suite 3D Fort Collins, CO 80525 RE: Provincetowne Filing 5, FDP130025, Round Number 1 Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov.com/deve/opmentreview Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Courtney Levingston, at 970-416-2283 or clevingston@fcgov.com. Comment Summary: Department: Engineering Development Review Contact: Sheri Langenberger, 970-221-6573, slangenberger(a)fcgov.com Topic: General Comment Number: 1 Comment Originated: 06/27/2013 06/27/2013: There is a note on page 2 of the plat that needs to be removed. The note that was added on the cover sheet vacates the easements as dedicated on the prior plat and this note is just confusing. Comment Number: 2 Comment Originated: 06/27/2013 06/2712013: Site and Landscape plans Why are these labeled as minor amendment to the site plan? This is a new PDP there is not a new approved site plan to amend yet. The legal discription on the site plan needs to be updated to be correct - the legal for the project will be: Provincetowne Filing Five, being a replat of.... Department: Environmental Planning Contact: Lindsay Ex, 970-224-6143, lex(afcgov.com Topic: General Comment Number: 1 06/27/2013: No comments. Department: Light And Power Contact: Doug Martine, 970-224-6152, dmartine(d)fcgov.com Topic: General Comment Originated: 06/27/2013 Page 1 of 3