HomeMy WebLinkAbout4800 INNOVATION DR. - ADDITION OF PERMITTED USE - 18-08 - REPORTS - CORRESPONDENCE-HEARING (3)9. Conditions of Approval
Will any conditions of approval be necessary to address impacts generated
by the proposed use to in order to ensure compliance with all applicable
regulations?
None that we are aware of.
rd
5. Describe how the placing the proposed use on the subject parcel will
result in compliance with the Building and Project Compatibility
standards found in Section 3.5.1 of the Land Use Code.
The proposed use will be utilizing an existing building that was developed
and constructed in accordance with the architectural controls of the Oakridge
Business Park. The primary traffic to the Subiect Property for the proposed
use would result from employees, delivery, and circulation at the rear of the
Property, This circulation area is screened from the public street by an
approximately 6' masonry wall and steel qate. There is also mature
landscaping at the front of the property that allows for additional screening of
the delivery area. Any outside storage, mechanical equipment, or trash
collection shall be located behind the screen wall and in excess of 20' from
the public street. All parking for the facility will be handled by the existing off-
street parking lot.
6. Compliance with a Governing Overall Development Plan or Sub -area
Plan
Is the site governed by an adopted Overall Development Plan, Sub -area
Plan, Corridor Plan or Neighborhood Plan? If so, please describe how the
proposed use and the present site improvements comply with these adopted
plans, or how the site will be brought up to a level of compliance.
To our knowledge there is no sub -area plan, corridor plan, or
neighborhood plan.
7. Compliance with Article Three of the Land Use Code
Describe how the site presently complies or does not comply with the General
Development Standards of the Land Use Code. Where the site
improvements are deficient, what measures will be taken to bring the site up
to a level of code compliance?
The site presently complies with the General Development Standards
Prescribed by Article 3 as described in #5 above.
8. Compliance with Article Four of the Land Use Code
Are there any applicable standards of the zone district in which the parcel is
located? If so, how the does the site presently comply, or how will the site be
brought up to a level of compliance?
This property does not abut residential property. This property provides a
primary entrance facing the public street and does provide direct linkage from
the building entrance to the street sidewalk without crossing a parking or
driving area for pedestrians.
3. Context
The submittal must include a thorough description of the surrounding area.
Please describe the nature and extent of both abutting and adjacent land
uses.
The Subiect Property is located in the Oakridge Business Park on
Innovation Drive. The immediate neighboring users include Drahota
Construction and Verigy to the north. The building immediately to the south
was occupied by DAKO Cytomation, now Beckman Coulter but is currently
vacant and on the market for lease or sale. It is an approximately 10,800
square foot building currently built out for office/lab/flex warehouse uses. The
building immediately to the east is a multi -tenant, rail -served warehouse/
distribution facility with retail in the front occupied by a number of different
uses including Florida Tile, BC Granite & Tile, Coldstone Creamery, Taco Del
Mar, Norwalk Furniture Warehousing, Empire Staple and more.
Neighboring users within the Oakridge Business Park include Wolf
Robotics, BHA Desig engler Architects, Hercules Industries, Office
Scapes, Honeywell, Baker Instruments and IBMC. These occupants include
a mix of office, retail, wholesale, warehouse, distribution and manufacturing
uses.
4. Is the Proposed Use Compatible with the Neighborhood Context and
with Section 3.5.1 of the Land Use Code?
Describe how the proposed use is compatible with the surrounding
neighborhood. Please refer to the definition of Compatibility in the Land Use
Code found in Section 5.1.2.
The Subiect Property is a single -story masonry office/warehouse building
with a combination of dock -high and around level overhead doors, very
similar to all of the surrounding buildings. The scale, mass and bulk of the
structure is comparable to the maiority of the structures in the Oakridge
Business Park, and is in some cases less than neighboring properties, the
Wolf Robotics building as one example. The proposed use will not generate
any pedestrian traffic, and the vehicular traffic is anticipated to be comparable
to, or less than the previous use and those uses surrounding the Subiect
Property. Access to the Subiect Property will still come from Innovation Drive,
and all site circulation relating to this use will be handled on the 2.6 acre site,
rather than utilizing the public streets. Onsite parking has been sufficient for
Simpson over the past 15 years, and is anticipated to meet parkinq demands
for warehouse/distribution users. There are no additional lighting
requirements creating no change of impact to the surrounding area, and noise
is anticipated to be reduced by way of reduced traffic to the site. In general,
the proposed use is anticipated to be an overall decrease of intensity as
compared with the previous use as it would likely result in fewer employee
trips to the site.
Submittal For Addition of a Permitted Use
Submitted by Jason Ells
Realtec Commercial Real Estate Services
On Behalf Of
4800 Innovation Dr.
Oakridge Business Park
Fort Collins, CO 80525
1. Zone District
In what zone is the property located? Is there a zoning history on the
property? For example, was the property ever zoned in such a way that the
proposed use would have been permitted under a former zone district?
The subject property is currently located in the Oakridge Business Park,
which is currently zoned HC — Harmony Corridor. Uses currently allowed
within HC include light industrial, assembly and food processing, but not
warehouse/distribution. When the building was developed and constructed in
1993 it was under the LDGS guidelines. Covenants for the Oakridge
Business Park prescribe a number of allowed uses, one of which being
warehouse/distribution which would have allowed for the proposed use.
2. Description of the Proposed Use and Previous Use
The submittal must include a detailed description of the proposed land use (or
land uses if the proposal includes a mixed -use project) and the previous use,
if one existed, including the number of employees, hours of operation,
anticipated customer traffic any other attributes or characteristics of the
operation.
The current use of the Subiect Property is for manufacturing, warehousing
and distribution of sheet metal products, specifically HVAC ducting and
related components. The previous occupant, Simpson Sheet Metal, had
approximately 40 employees onsite. They had approximately 35 trucks of
varyinq sizes delivering and shipping materials to and from the site daily.
The proposed permitted use for the Subiect Property is warehouse/
distribution. This would allow the Subiect Property to be used as it was
intended, and has been used for the past 15 years. The addition of this use
would allow the property to be leased or sold to a user who could utilize the
22,000 square feet of dock -high warehouse for storage and distribution of
wholesale goods.