HomeMy WebLinkAboutTHE OVAL FLATS - PDP - 26-08 - CORRESPONDENCE - (7)THE OVAL PDP
December 2, 2008
Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington
Topic: WaterAVastewater
Number: 25 Created: 9/2/2008
[9/2/08] As stated at conceptual review, separate water and sewer services are required for
the commercial and residential portions of the building.
PLEASE SEE UTILITY PLAN FOR CURRENT ANTICIPATED WATER SERVICES. DALE
YOUNG HAS MET WITH ROGER BUFFINGTON TO DISCUSS A SINGLE SEWER
SERVICE LINE.
Number: 26 Created: 9/2/2008
[9/2/08] From the utility plans and site plan, it appears that there are two buildings. If this is
correct, separate water and sewer services are required for each building.
THERE IS ONLY ONE BUILDING. PLEASE SEE ELEVATIONS.
Number: 27 Created: 9/2/2008
[9/2/08] Show curb stop(s) & meter pits(s) on plans.
SEE UTILITY PLANS.
Number: 28 Created: 9/2/2008
[9/2/08] Provide water service sizing calculations for review.
WATER SERVICE CALCULATIONS WILL BE PROVIDED WITH BUILDING PERMIT
SUBMITTAL DOCUMENTS.
Number: 29 Created: 9/2/2008
[9/2/08] See redlined plans for other comments.
ACKNOWLEDGED
Department: Zoning Issue Contact: Jenny Nuckols
Topic: Zoning
Number: 3 Created: 8/21 /2008
[8/21/08] Please provide a shadow analysis for the buildings.
A SHADOW ANALYSIS HAS BEEN INCLUDED WITH THE SUBMITTAL.
Number: 4 Created: 8/21/2008
[8/21/08] Site Plan: Please show building envelope, footprint, Building dimensions, setbacks
to property lines.
ADDED
JIM SELL DESIGN
Page 13
THE OVAL PDP
December 2, 2008
THE UTILITY EASEMENT IS LOCATED IN THE ISLAND, SOUTH OF THE ORIGINALLY
REQUESTED LOCATION
Department: PFA Issue Contact: Carie Dann
Topic: fire
Number: 59 Created: 9/5/2008
[9/5/08] KNOX BOX REQUIRED: Poudre Fire Authority requires a "Knox Box" to be
mounted on the front of every new building equipped with a required fire sprinkler system or
fire alarm system. PLEASE NOTE: We likely will require TWO Knox Boxes for this project:
One for commercial, one for residential. 97UFC 902.4; PFA BUREAU POLICY 88-20
KNOX BOX HAS BEEN ADDED.
Number: 60 Created: 9/5/2008
[9/5/08] FIRE DEPARTMENT CONNECTION: Fire department connections shall be
installed remote from the buildings, and located on the street or fire lane side of buildings,
fully visible and recognizable from the street or nearest point of fire department vehicle
access or as otherwise approved by the fire code official. If possible, a fire hydrant shall be
located within 100 feet of the FDC. PFA Bureau Policy. PLEASE NOTE: It is unlikely PFA will
approve an on -building FDC. However, can you be more specific where your proposed on -
building FDC would be located? Are you referring to the southwest corner of the building,
adjacent to Laurel Street? Neither an on -building nor remote FDC would be approved if it's
located INTERNALLY on the site (access via the alley). ALSO, please contact me for specific
requirements for remote FDCs (height, color, angles, etc.).
CLIENT DESIRES TO HAVE THE CONNECTION ON THE BUILDING AND WILL
CONTINUE DISCUSSIONS WITH PFA.
Number: 61 Created: 9/5/2008
[9/5/08] FIRE PUMP: The fire pump, if required, must be located in a room that is separate
from the fire riser room, due to the noise the fire pump will produce when operating.
WE HAVE CONTACTED PFA REGARDING THE SEPARATE ROOM FOR A FIRE
PUMP COMMENT AND IT IS OUR UNDERSTANDING THAT THIS WILL NOT BE
REQUIRED.
Number: 62 Created: 9/5/2008
[9/5/08] ADDRESS NUMERALS: Address numerals shall be visible from the street fronting
the property, and posted with a minimum of 6 inch numerals on a contrasting background.
(Bronze numerals on brown brick are not acceptable). PLEASE NOTE: While 6-inch
numerals is the minimum requirement, my recommendation is to use numerals that are
proportionate to the size of the structure, i.e., larger numerals. 97UFC901.4.4
COMMENT ADDRESSED
"I
w�
JIM SELL DESIGN
Page 11
THE OVAL PDP
December 2, 2008
westerly edge of the site to contain any flows that may overtop the pan in a 100yr storm
event. Please show a dedicated easement adequate in width to contain any overflow of the
pan. See redlines for clarification.
THE DRAINAGE HAS BEEN MODIFIED SUCH THAT AN EASEMENT IS NOT
NECESSARY. PLEASE SEE ALLEY PLAN AND PROFILE.
Number: 13 Created: 8/29/2008
[8/29/08) Demolition Plan — Shouldn't the alley removal & reconstruction be shown or
labeled on this sheet ? Please label the existing alley driveway approach to be protected
during demolition & reconstruction of the alley and site improvements.
MODIFIED
Number: 14 Created: 8/29/2008
[8/29/08] Utility Plan Sheet — Please show any existing off -site buildings within 10 feet of the
Northerly property line. Label the existing H.C. ramps at the intersection. Remove any
encroachments shown into the ROW (see previous comment). Show how the proposed
sidewalk ties into existing walk to the north on Howes St.
NOW SHOWN ON UTILITY PLANS.
Number: 15 Created: 8/29/2008
[8/29/08] Stormwater may want a separate plan and profile sheet for the proposed storm
drain connection? Please clearly indicate on the plan what portion is proposed to be
privately maintained and what is expected to be maintained by the City.
PLAN AND PROFILE WILL BE PROVIDED WITH FDP. IT IS ANTICIPATED THAT ONLY
THE SECTION IN THE ROW WILL BE MAINTAINED BY THE CITY. ALL OTHER STORM
DRAIN FACILITIES WILL BE MAINTAINED BY THE OWNER.
Number: 16 Created: 8/29/2008
[8/29/08] Please clearly indicate on the plan where the roof drains will outlet. They are not
permitted to drain over the sidewalk.
ALL ROOF DRAINSPOUT ARE LOCATED ON THE NORTH AND WEST SIDE OF THE
BUILDING AND ARE ROUTED UNDERGROUND AND TIE IN TO THE STORMWATER
SYSTEM.
Number: 17 Created: 8/29/2008
[8/29/08] Alley Design — Per my previous comments, the alley standard calls for rollover curb
& gutter. The City would support a variance to use a pan considering the head in parking is
proposed here however, you need to list the variance in the general notes, provide a pan
detail in the detail sheets and provide for a drainage easement on the property in the event
the pan is overtopped in a 100yr rain event.
JIM SE'SIGN
Page 9
THE OVAL PDP
December 2, 2008
Number: 49 Created: 9/4/2008
[9/4/08] Contiue to work with Gary Schroeder on the design of the building.
COMMENT ACKNOWLEDGED
Topic: Geo-tech report
Number: 44 Created: 9/4/2008
[9/4/08] Under the Demolition and Site Development section of the report, there is no
discussion on tree protection methods in relation to the removal of all tree root systems.
NOTED
Number: 45 Created: 9/4/2008
[9/4/08] Under section Drainage, there is no discussion of using landscape planters to
capture roof runoff. This needs to be addressed.
LANDSCAPE PLANTERS WILL NOT BE USED TO CAPTURE ROOF RUNOFF. THE
ROOF RUNOFF WILL BE PIPED DIRECTLY TO THE AREA INLET/OUTLET STRUCTURE
IN THE PARKING LOT.
Number: 46 Created: 9/4/2008
[9/4/08] There is no discussion on the use of porous pavements for parking areas. If porous
pavements are being considered, then the report should discuss this option.
POROUS PAVEMENTS WILL NOT BE USED IN THE PARKING AREAS.
Number: 41 Created: 9/4/2008
[9/4/08] Grass pavers are not allowed at bike rack locations due to the need to irrigate the
grass which can cause an unsuitable surface. An all weather surface is required for all bike
rack locations.
CONCRETE WILL BE USED AT THE PROPOSED BIKE RACK LOCATIONS.
Number: 48 Created: 9/4/2008
[9/4/08] The location and materials proposed for the trash enclosure needs to be
reconsidered. Metal doors are durable, but do not fit in with the building materials or
compatible next to a patio area.
THE TRASH ENCLOSURE HAS BEEN RELOCATED TO THE NORTHWEST CORNER OF
THE SITE AND INCLUDES MATERIALS USED ON THE BUILDING.
Department: Engineering
Topic: Engineering
Number: 7
Issue Contact: Randy Maizland
Created: 8/29/2008
Page 7
THE OVAL PDP
December 2, 2008
THE PROJECT DESIGN HAS BEEN REVISED AND THE DESIGN TEAM HAS
CORRESONDED AND MET WITH ANNE ASPEN IN ORDER TO RESPOND TO THE
COMPATIBILITY COMMENTS. SEE ATTACHED DESIGN NARRATIVE AND COLORED
BUILIDNG RENDERINGS AND ELEVATIONS.
Number: 51 Created: 9/4/2008
[9/4/08] 1 understand that this site is quite constrained and I am pretty sure you've probably
gone around and around on how to best lay it out. That said, there are a few instances in the
elevations where I think things aren't as good as they can be. The stair volume on the
Howes side currently only has a door opening to the parking lot so it feels like it is turning its
back on the street, especially with the blank wall. For both aesthetic and functional reasons,
I think it would be better to add doors on the Howes side too. The volume just to the left
(south) of that also seems kind of out of place with its recessed patio area, as if it is a
suburban condo. Can you tweak that to be more appropriate to this context? Finally, the
west end of the south elevation is lacking a sense of grounding and pedestrian interest. Per
Section 3.5.2 (D)(2)(a)(1), facades must have at least two methods of creating pedestrian
scale. This volume would benefit from some sort of base.
THE PROJECT DESIGN HAS BEEN REVISED AND THE DESIGN TEAM HAS
CORRESONDED AND MET WITH ANNE ASPEN IN ORDER TO RESPOND TO THE SITE
PLAN AND PEDESTRIAN EXPERIENCE COMMENTS. SEE ATTACHED DESIGN
NARRATIVE AND COLORED BUILIDNG RENDERINGS AND ELEVATIONS.
Number: 52 Created: 9/4/2008
[9/4/08] Per Section 3.5.1(G), since the building is proposed to be over 40 feet, the project
will be subject to the special height review. Additional submittal items will need to come in
with the revision submittal according to the code. Typically, one sheet in the plan set will
have the shadow analysis depictions and another sheet shows photo simulations. A short
text document (2-3 paragraphs) accompanies the submittal.
THE SHADOW ANALYSIS HAS BEEN ADDED.
Number: 54 Created: 9/4/2008
[9/4/08] You will need to submit either a color rendering of the project (preferred) or material
sample boards prior to going to hearing.
COLORED RENDERINGS HAVE BEEN ADDED.
Number: 55 Created: 9/4/2008
[9/4/08] Please add either a perspective view of the corner at Laurel and Howes (where the
seating plaza is) or an elevation of the southeast fagade. The elevations do not show
enough information to evaluate.
COLORED RENDERINGS HAVE BEEN ADDED.
JIM SELL DESIGN
Page 5
;{ THE OVAL PDP
December 2, 2008
Number: 24 Created: 8/29/2008
[8/29/08] Please add standard signature blocks. This will be a Type I project so you'll need a
signature line for the Director of Current Planning. If you need samples, please let me know.
ADDED
Number: 31 Created: 9/3/2008
[9/3/08] Remove all utility information from the site plan.
REMOVED
/ Number:32 Created: 9/3/2008
1/ [9/3/08] Take a closer look at your parking lot to meet standards for dimensions and to make
it more functional. Specifically, you may use either long-term parking or a mix of standard
and compact, not a mix of long-term and compact. There must be sufficient clear walkway
whereever parking will overhang sidewalks. The drive aisles may be able to be reduced to
gain a bit more parking space room. Ramps should be added wherever access to bike racks
will be needed. A 5-foot landscaping setback is required along the north property line. If you
are unable to meet the standards, you will need to apply for a modification of standards.
am happy to meet with you about these items if you would like.
REVISED
Number: 33 Created: 9/3/2008
[9/3/08] There needs to be 3 handicap parking spaces if 60 spaces are provided in the lot,
not 2 per Section 3.2.2(K)(5)(d).
REVISED
Number: 34 Created: 9/3/2008
[9/3/08] Please show onstreet parking on the site plan. Will there be any changes from
existing?
ON STREET PARKING IS NOW SHOWN ON THE SITE PLAN. THERE WILL BE NO
LZ CHANGES TO EXISTING ON STREET PARKING.
Number: 35 Created: 9/3/2008
[9/3/08] Remove topo lines from site plan.
REMOVED
vl
Number: 36 Created: 9/3/2008
[9/3/08] Remove text from adjacent properties. Show at least partial footprints, parking or
drives, etc of those buildings instead. This doesn't need to be surveyed. You can take the
JIM SELL DESIGN
Page 3
THE OVAL PDP
December 2, 2008
December 2, 2008
Anne Aspen
Senior City Planner
City of Fort Collins
281 North College Avenue
Fort Collins, CO 80524
(HAND DELIVERED)
RE: The Oval Flats - PDP #2
(formerly SAE Redevelopment, Oval Oaks, or Oval Flats)
Dear Anne,
What follows is our response to the items that were listed in the staff comments for THE
OVAL FLATS TYPE I, dated 9/8/2008:
ISSUES:
Department: Current Planning Issue Contact: Anne Aspen
Topic: General
Number: 22 Created: 8/29/2008
[8/29/08] The following departments have no problems or concerns with the project as
proposed: Poudre R-1 school district, Park Planning, County Assessor, GIS.
THANK YOU
Number: 30 Created: 9/3/2008
[9/3/08] In your statement of planning objectives you request a modification of standards for
exceeding the 3-unrelated rule. A modification of standards is not needed, just an
explanation. I will include an explanation of this in the staff report and recommend that the
decision -maker increase the number of unrelated people allowed since this is a student
housing project and the exact antidote desired to the problem that prompted the ordinance in
the first place.
THANK YOU
Number: 53 Created: 9/4/2008
[9/4/08] Tim Buchanan comments as follows:
The proposed development will seriously impact the three large cottonwoods in the right of
way along Howes Street.
Excavation for the proposed buildings is shown to occur 8-10 feet from the outer bark of
these 50 inch diameter cottonwood trees.
JIM SELL DESIGN
Page 1