HomeMy WebLinkAboutRIVER DISTRICT BLOCK ONE MIXED-USE (ENCOMPASS) - FDP - FDP130015 - CORRESPONDENCE -Department: Zoning
Contact: Noah Beals, 970-416.2313, nbeals(a)fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 05/10/2013
05/10/2013: A note on the site plan needs to be included that states the compact spaces will
be reserved for employees and residents and designated by a sign.
The sign detail that was submitted in the PDP phase should be included, I did not see it in the
FDP submittal.
Comment Number: 2
Comment Originated: 05/10/2013
05/10/2013: The Parking Garage Exhibit on the Site Plan is different from the floor plan of
the Garage level. These will need to be revised to match.
05/28/2013: Please adjust the leader near the south end of the property for the FEMA
Floodway Boundary. See redlines.
Comment Number: 18 Comment Originated: 05/28/2013
05/28/2013: Please provide the reception numbers for the off -site easements by separate
document prior to filing the Plat.
Topic: Site Plan
Comment Number: 19 Comment Originated: 05/28/2013
05/28/2013: Please change the legal description to match the legal description shown on the
Subdivision Plat.
Comment Number: 20 1 Comment Originated: 05/28/2013
05/28/2013: There are line over text issues on sheet 2. See redlines.
Comment Number: 21 Comment Originated: 05/28/2013
05/2812013: Please rotate the circled text 180 degrees, to make it plan readable. See redlines.
Department: Traffic Operation
Contact: Ward Stanford, 970-221-6820, wstanford(a)fcpov.com
Topic: General
Comment Number: 1
Comment Originated: 05/28/2013
05/28/2013: I'm unable to find previous resolution to this PDP comment. Please address or
refresh any past conversation on the issue.
10/04/2012: Plantings near the driveway seem acceptable except have concerns with one
tree, the Skyline Honeylocust. The following description From the US Forest Service Fact
Sheet ST-282 is of concern: "Trunk/bark/branches: droop as the tree grows, and will require
pruning for vehicular or pedestrian clearance beneath the canopy;". It looks close enough to
be a possible sight distance issue as well as possibly being a problem for the nearby
sidewalk. I'm unable to attain Tim Buchanan's or Ralph Zentz's input on the choice and location
at this time (both are out) but would like their input before finding comfort in the choice.
08/08/2012: Please provide names of plantings near the Linden access so we can verify plant
type will not cause sight distance issues on the sidewalk or on Linden St./2013:
Department: Water -Wastewater Engineering
Contact: Roger Buffington, 970-221-6854, rbuffington fcgov.com
Topic: Construction Drawings
Comment Number: 1 Comment Originated: 05/28/2013
05/28/2013: Label valve , fittings, etc. at the fire line connection.
Comment Number: 2 Comment Originated: 05/28/2013
05/28/2013: Schedule meeting to review the water service connections and to look at an
option for the meter pits.
Comment Number: 3
Comment Originated: 05/28/2013
05/28/2013: Provide design calcs on the width & thickness of the insulation above the sewer
service. Add a detail to provide direction on the placement of the insulation and include a note
listing the specifications for the insulation (must be suitable for underground applications).
Comment Number: 2 Comment Originated: 05/28/2013
05/28/2013: Are the Floor Plan sheets to scale? Please add the scale or N.T.S. to the sheets.
Topic: Construction Drawings
Comment Number: 3 Comment Originated: 05/28/2013
05/28/2013: Please correct the title of sheet C301 in the index on sheet C000. See redlines.
Comment Number: 4 Comment Originated: 05/28/2013
05/28/2013: Please correct the sheet numbering in the index on sheet C000 for the
construction details. See redlines.
Comment Number: 5 Comment Originated: 05/28/2013
05/28/2013: There is a line over text issue on sheet C300. See redlines.
Comment Number: 6 Comment Originated: 05/28/2013
05/28/2013: Please mask all circled text on sheets C301 & C500. See redlines.
Comment Number: 7 Comment Originated: 05/28/2013
05/28/2013: BANK STABILIZATION: Please change all linework & text on sheets 1 & 9 to solid.
See redlines.
Comment Number: 8 Comment Originated: 05/28/2013
05/28/2013: BANK STABILIZATION: There are line over text issues on sheets 4, 5, 6, 7, 8 & 9.
See redlines.
Comment Number: 9 Comment Originated: 05/28/2013
05/28/2013: BANK STABILIZATION: Please increase the text size for the section line elevations
on sheets 6 & 7. See redlines.
Comment Number: 10 Comment Originated: 05/28/2013
05/28/2013: BANK STABILIZATION: There is cut off text on sheet 9. See redlines.
Topic: Landscape Plans
Comment Number: 11 Comment Originated: 05/28/2013
05/28/2013: There are line over text issues on sheets 1 & 2. See redlines.
Topic: Plat
Comment Number: 12 Comment Originated:
05/28/2013
05/28/2013: Please change "men" to "persons" in the Statement Of Ownership And
Subdivision.
Comment Number: 13 Comment Originated:
05/28/2013
05/28/2013: Is the Lienholder still pending?
Comment Number: 14 Comment Originated:
05/28/2013
05/28/2013: Please correct the spelling of "Aztlan". See redlines.
Comment Number: 15 Comment Originated:
05/28/2013
05/28/2013: What is the dash -dot -dot -dash line shown along the river? See redlines.
Comment Number: 16 Comment Originated:
05/28/2013
05/28/2013: There is a line over text issue. See redlines.
Comment Number: 17 Comment Originated: 05/28/2013
easement. The status on whether this area should be in an access easement should be
confirmed and coordinated. It would seem to make sense that this area has the access
easement designation since it connects to a pedestrian path on City property.
Comment Number: 6 Comment Originated: 05/29/2013
05/29/2013: I'm understanding from Emma McArdle with Transfort that the bus stop, trash
receptacle, and bike racks are considered City/Transfort appurtenances, but will be installed
and maintained by the Developer. We may want to place language in the development
agreement for future reference on how the installation and ongoing maintenance of the
City/Transfort appurtenances will be that of the Developer. Final confirmation of this would be
from Emma.
Department: Environmental Planning
Contact: Lindsay Ex, 970-224-6143, lex(a)fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 05/28/2013
05/28/2013: Buffer zone areas and the standard comment (please refer to Section 3.4.1 of the
Land Use Code for allowable uses within the Natural Habitat Buffer Zone) need to be added to
the Utility Plans.
Comment Number: 2 Comment Originated: 05/28/2013
05/28/2013: Otherwise, all of my plan -related comments were addressed at PDP. When the DA
is drafted, I will include language on the escrow required for the buffer zone landscaping and
the need for a weed management plan.
Department: Stormwater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamargue(&fcgov.com
Topic: Floodplain
Comment Number: 1
Comment Originated: 05/28/2013
05/28/2013: Repeat Comment
1. Per our conversation during the field meeting on May 9th, construction timing and methods in
the river must be addressed. Construction in the river, including the placement of diversion
structures, must not be conducted during flood season which is April 15-end of September.
This will be a condition of the floodplain use permit and will also be included in the
development agreement.
Topic: General
Comment Number: 2
Comment Originated: 05/28/2013
05/28/2013: OS-1 flows for the 100-year storm need to pass through the proposed swale and
inlet, not just the 2-year flows.
Comment Number: 3 Comment Originated: 05/28/2013
05/28/2013: Please see other minor comments on the redlined plans and report.
Department: Technical Services
Contact: Jeff County, 970.221-6588, jcounty0fcgov.com
Topic: Building Elevations
Comment Number: 1 Comment Originated: 05/28/2013
05/28/2013: There are line over text issues on several sheets. See redlines.
Department: Engineering Development Review
Contact: Marc Virata, 970-221-6567, mvirata fcgov.com
Topic: Construction Drawings
Comment Number: 7 Comment Originated: 05/29/2013
05/29/2013: Please provide drive approach detail 706. The site plan shows the sidewalk across
the driveway to be colored concrete. The specifications of this should be also shown on the
construction plan set.
Comment Number: 10 Comment Originated: 05/29/2013
05/29/2013: Indicate that the pavement detail on the details sheet is for private areas only.
Comment Number: 11 Comment Originated: 05/29/2013
05/29/2013: Please provide additional information (such as cross sections) for Linden Street to
show how cross slopes will be for the widening of the inset parking and how cross slopes tie
into existing.
Topic: General
Comment Number: 1 Comment Originated: 05/29/2013
05/29/2013: Is the "River District Block One Mixed Use Bank Stabilization" plan set intended to
be part of the construction plan set and signed by the City, or is it intended to be its own set? It
would seem to make sense to combine this into the construction plan set.
Comment Number: 2
Comment Originated: 05/29/2013
05/29/2013: The Engineering Construction Inspection Manager, in reviewing the amount,
location, and spacing of the street cuts to Linden Street as a new street, is requiring that Linden
Street be milled and overlaid full width from patch to patch (and would waive the pavement
impact fee that would be levied).
Comment Number: 3
Comment Originated: 05/29/2013
05/29/2013: The location of the grease trap appears to have been moved from under the patio
(where an easement for the encroachment is ongoing) to further out into the right-of-way.
Concerns weren't previously raised about the location of the grease trap since it would be
located where an easement is intended to be granted. The grease trap should be placed back
in its previous location under the patio. (Note that the "Garage Level" of the building floor plans
shows the grease trap within the patio area.)
Comment Number: 4 Comment Originated: 05/29/2013
05/29/2013: In addition to the easements on City property/right-of-way, we'll need to be sure
that an easement from Ranch -Way Inc. is provided prior to approval of the plans. I'm not
necessarily seeing the easement from Ranch -Way needing to be an easement dedicated to
the City, however we should review a draft of the easement language. At the staff review
meeting it was brought up that an easement was provided from Ranch -Way prior to hearing. I
was recalling that it was a letter of intent to grant an easement, but not an actual easement. I'm
unable to locate the document. Can a copy of the document be provided for verification if an
actual easement or intent to grant an easement was completed?
Comment Number: 5
Comment Originated: 05/29/2013
05/29/2013: The construction plans show the dedication of a drainage and access easement
dedicated along the eastern boundary of the site that incorporates the pedestrian path that
traverses the eastern boundary and connects to the path built on City property. The plat and
site plan has this area indicated as a drainage easement only and not also an access
M
Ctyof,
161ft Cottins
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov. corn/de velopmentreview
May 31, 2013
RE: River District Block One Mixed Use -Encompass, FDP130015, Round Number 1
Please see the following summary of comments from City staff and outside reviewing agencies for your
submittal of the above referenced project. If you have questions about any comments, you may contact the
individual commenter or direct your questions through the Project Planner, Ted Shepard, at 221-6343 or
tshepard@fcgov.com.
Comment Summary:
Department: Current Planning
Contact: Ted Shepard, 970.221-6343, tshepard fcgo' .com
Topic: General
Comment Number: 1 Comment Originated: 05/31/2013
05/31/2013: Please add the following note to both the Site Plan and Lighting Plan E102:
"Parking lot light fixtures will be programmed to turn off at 10:00 p.m."
Comment Number: 2 Comment Originated: 05/31/2013
05/31/2013: On Site Plan sheet 2 of 2, where labeling the trash enclosure, please revise to
read "trash and recycling enclosure."
Comment Number: 3 Comment Originated: 05/31/2013
05/31/2013: There are six sheets depicting the floor plans. These sheets will not be needed in
the mylar set.
Comment Number: 4 Comment Originated: 05/31/2013
05/31/2013: Because the site does not align with north -south, east -west grid, the labels on the
architectural elevations should be revised so that the North elevation is labeled as Northeast,
the west elevation - Northwest, etc.
Comment Number: 5
Comment Originated: 05/31/2013
05/31/2013: On the Perspective sheet, the East elevation label should be the Northwest and
the West elevation label should be the Southeast.
Comment Number: 6 Comment Originated: 05/31/2013
05/31/2013: It would be helpful to have all sheets numbered in sequence even though they are
provided by different sources.