Patti Watkins
Belford Watkins Group Architects
Cc Ron Keckter
6750, for further information regarding electrical service and transformer
capacity.
Response: A transformer and EMgenerator are proposed to be located in a
screened enclosure located to the northeast corner of the building.
Electrical service to this location will be coordinated with Rob Irish as the
design progresses.
25. Normally, a new building is assessed the Capital Improvement Expansion
Fees which are due at the time of building permit issuance. Since the new
building would replace an old building, there is a possibility these fees
would not apply. If the existing house is demolished, then credit will be
given. For an estimate of the current fees, please contact Felix Lee, 416-
2337.
Response: Comment has been noted and has been brought to the attention of
the Poudre Fire Authority.
26. If the decision is made to demolish the existing house, then a Demolition
Permit (and fee) will be required. The Historic Preservation Planner must
sign off on this permit. Another component of this permit is a certification
from a State -authorized asbestos inspector indicating that there is no
asbestos over a specific percentage. If asbestos over this amount is found,
then abatement procedures must be followed. This State certification (and
fee) is administered by the State of Colorado Department of Health and the
Environment, Air Pollution Division. If time is of the essence, this process
should begin expeditiously. Asbestos abatement can potentially cause
significant delay. After abatement (if needed), the building(s) must be re-
inspected before the State will sign off.
Response: It is the intention of the Owner at some future date to demolish
the home and CMU structure but possibly keep the old barn. The Owner
will investigate if asbestos or other hazardous materials are present prior to
requesting a demolition permit. Demolition of these structures on Lot 1 is
not intended to be part of the development of Lot 2.
helpful. A follow up meeting with Traffic Operations will be needed. For
further information, please contact Ward Stanford, 221-6820.
Response: Currently we are proposing one median break, with a traffic
signal controlled by the firefighters. We are abandoning the existing curb
cut at West Drake Road and replacing it with a new cut as fur east of the
Drake Road/Taft Hill intersection as possible. This curb cut will be a right-
in/right-out only maneuver except for fire apparatus access to the north
lanes of Drake Road through the median cut. A meeting reviewing the
anticipated traffic levels for this development was held with Ward Stanford.
He noted that given the anticipated loads and timing, he considered the
traffic loads to be light and not to pose a problem with access onto Drake
Road.
23. If the existing house it to be demolished, then the Department of Natural
Resources encourages that the removal of the existing buildings be done in a
way that recycles as much re -usable building material as possible. Please
contact John Armstrong, 416-2230 to discuss deconstruction methods that
decrease the amount of material destined for the landfill.
Response: Currently there are three structures on Lot I that are in
disrepair. Demolition of the structures would not be part of this proposed
development. It is the intention of the Owner at some future date to
demolish the home and CAIUstructure but possibly keep the old barn. The
Owner will coordinate with Natural Resources when demolition is
undertaken.
24. The site will be served by Light and Power. Existing electrical facilities are
within a duct bank along Taft Hill Road. The system along Drake is on the
north side of the roadway and, therefore, not as accessible. New
development is subject to normal fees and charges. A new transformer will
be needed and the location will have to be coordinated by Light and Power
such that it is within ten feet of hard surface for emergency change out. A
Commercial One ("C-1") Form and a One Line Diagram will need to be
completed by a licensed electrical contractor to determine entrance capacity.
Normal development charges and fees will apply but credit will be given for
existing facilities to the house and property. Please contact Rob Irish, 221-
19. Presently, there is no Spring Creek Trail connection to Taft Hill Road.
Please check with Craig Foreman, Parks Planning, 221-6618, to determine if
a spur is needed to connect the trail to Taft Hill Road at this location.
Response: Poudre Fire Authority is open to allowing the City of Fort
Collins to provide a trail connection on the east side of Taft Hill Road and
would entertain granting an easement through Lot 1 to the City of Fort
Collins to make the connection. At this time however, the Owner is not
proposing development on Lot 1.
20. Engineering recommends that a utility coordination meeting be conducted
with your civil engineering consultant prior to submittal of the Utility Plans.
To set this meeting up, and for further information on design and
construction of public improvements, please contact Susan Joy, 221-6605.
Response: The Civil Engineer has talked with Susan, and because of the
straightforward nature of the project, it was decided a coordination
meeting was not required.
21. The building must be within 300 feet of a fire hydrant capable of delivering
1,500 gallons per minute at 20 p.s.i. residual pressure. An automatic fire
extinguishing system will be required. A Fire Department Connection will
be required. The building will have a Drake Road address. The driveway
must be dedicated on the plat as an emergency access easement. There
should be sufficient parking to serve the community meeting room.
Response: Please see the Utility Plan showing the proposed location of the
fire hydrant.
22. Traffic Operations Department will support only one median break. The
westerly break needs to be eliminated as it is located within the westbound
left turn stacking lane. The proposed break in the median in Drake Road
must be controlled so that it serves only P.F.A. In addition, this break needs
to be equipped with a traffic signal to be activated only by P.F.A. Traffic
Operations needs to model the intersection to determine the feasibility of the
median break and the impact on the Level of Service at the intersection. A
Transportation Impact Study may not be needed. Information on the
number of calls during the morning and afternoon peak travel times will be
16. The Engineering Department will require the submittal of civil engineering
plans referred to as the Utility Plans. These plans will show any grading
associated with the new building, installation of the driveway, removal of
the existing curb, construction of new curb, gutter and walk, and the
installation of any new service lines. Please note that if any existing
sidewalk, curb and gutter are in disrepair, then these public improvements
need to be repaired or replaced as needed.
Response: Please seethe grading and utility plans for proposed utility
connections in the street as well location of the asphalt, median, and curb
cuts we are proposing to the current Ciry of Fort Collins infrastructure. It
is the intent of the project to repair any sidewalk, curb and gutter disrepair
along Lot 2 exposure at West Drake Road if indeed it is needed. Lot I will
not be developed at this time and, therefore, repair of sidewalk, curb and
gutter would not be undertaken at Lot I exposure at this time.
17. The property will need to be platted. The plat will need to dedicate a 15
foot wide utility easement along both street frontages immediately behind
the property line.
Response: Please see the attached plat prepared by King Surveyors.
18. Because of the recently completed capital improvement project, no
additional right-of-way will be needed. The existing sidewalk ramp at the
corner may need to be upgraded to current standards.
Response: We intend to provide Ciry of Fort Collins approved H.C. ramps
at the new curb cut on the south side of West Drake Road. We would
request not to have to update the ramps located on the corner of Taft Hill
and West Drake Road, due to the fact the Lot 1 property is not being
improved. The enclosed plat provides right-of-way dedication for the
roadway improvements that were previously constructed at West Drake
Road and at Taft Hill Road.
11. The City's Street Oversizing Fee may not apply as the project is not a new
fire station but the relocation of an existing facility. To verify this waiver,
please contact Matt Baker, Street Oversizing Coordinator, 221-6605. If
applicable, this fee is collected at the time of building permit issuance.
Response: Comment has been noted and has been brought to the attention of
the Poudre Fire Authority.
12. The Engineering Department also charges the Transportation Development
Review Fee. This fee is paid at the time of submittal of the Administrative
Review application. Please contact Susan Joy, 221-6605, for details on how
this fee is calculated.
Response: Comment has been noted and has been brought to the attention of
the Poudre Fire Authority.
13. A City Capital Project recently improved the intersection of Taft Hill Road
and Drake Road. A repay is due for these improvements for the property's
frontage along both streets. Please contact Matt Baker in the Street
Oversizing Department, 221-6605, for an estimate of this amount.
Response: Comment has been noted and has been brought to the attention of
the Poudre Fire Authority.
14. If the project requires cutting of either Taft Hill Road or Drake Road, and
these road surfaces are less than five years old, then triple street cut fees will
apply. For an estimate of these fees, please contact Rick Richter, Pavement
Management Director, 221-6605.
Response: Comment has been noted and has been brought to the attention of
the Poudre Fire Authority.
15. If the existing house is to remain as a dwelling unit, then an access easement
will need to be granted for access to Drake Road.
Response: The Owner intends to abandon the access to Drake Road. This
will leave an existing access to Taft Hill Road that will be addressed at a
future date when Lot 1 is developed.
M. The city wide development fee is $4,420/acre ($0.1015/sq.ft.) for new
impervious area over 350 sq.ft. No fee is charged for existing impervious
area. This fee is to be paid at the time the building permit is issued. For
further information, please contact Glen Schlueter, 221-6700.
Response: Comment has been noted and has been brought to the attention of
the Poudre Fire Authority.
10. Water/Wastewater comments:
A. Existing mains: 12-inch water mains in Drake and in Taft, 15-inch
sanitary sewer near south edge of property.
Response: Please see the utility plan for proposed location of water and
sewer taps and service extensions.
B. Existing water/sewer services to the site must be used or abandoned at
the main.
Response: The Owner does not intend to develop Lot I at this time as part
of this PDP, and will abandon the water and sewer mains at the existing
house located on Lot 1 when that site is developed.
C. Provide 30-foot easement (15 feet each side on the site) for existing
sanitary sewer.
Response: Please see the grading and drainage plan noting the easement
and the subdivision plat.
D. Development fees and water rights will be due at building permit.
Response: Comment has been noted and has been brought to the attention of
the Poudre Fire Authority.
I. The floodplain administration contact for this project is Marsha Hilmes-
Robinson, 224-6036.
Response: Comment has been noted.
J. A drainage and erosion control report and construction plans are required and
must be prepared by a Professional Engineer registered in Colorado.
Response: These documents have been prepared by our civil engineer,
Interwest Consulting Group.
Erosion control drawing will be provided with the final construction drawings.
The contractor will be required to obtain a Colorado State Stormwater
permit and provide the City with Best Management Practices at the time of
Construction documents being reviewed in the Building Department.
K. If there is an increase in imperviousness greater than 1000 square feet,
onsite detention is required with a 2 year historic release rate for water
quantity. Parking lot detention for water quantity is allowed as long as it is
not deeper than one foot. If there is less than 1000 but more than 350 square
feet of new imperviousness, a site grading plan is all that is required. Water
quality treatment is also required as described in the Urban Storm Drainage
Criteria Manual, Volume 3 — Best Management Practices (BMPs).
Extended detention is the usual method selected for water quality treatment.
If there is less than 1000 but more than 350 square feet of new
imperviousness, a site grading plan is all that is required.
Response: Please see the preliminary drainage report for further
information.
L. The design of this site must conform to the drainage basin design of the
Spring Creek Drainage Master Drainage Plan as well the City's Design
Criteria and Construction standards.
Response: Please see the grading plans as well as our preliminary drainage
report. for further information.
Response: Please see Sheet A-3 for building, parking and detention pond
locations. No building structure is proposed within the flood plain.
C. Fill is not allowed in the floodway unless an engineering analysis
documents no -rise in flood elevations.
Response: Please see the floodplain plan. There is no proposed fill in the
floodway.
D. Fill, parking, and trails are allowed in the flood fringe.
Response: Please see the grading plans as well as our preliminary drainage
report for further information.
E. Please see floodplain review checklists for items to be included on the plans
and in the drainage report.
Response: Please see the grading plans as well as our preliminary drainage
report for further information.
F. If any work is proposed in the 100-year floodplain, a floodplain use permit
and $25 permit fee are required for each site element in the floodplain.
Response: We will be required to obtain the floodplain permit for the sewer
and storm drainage work we are proposing.
G. The floodplain use permit and floodplain development review checklists are
available on our website at:
http://www.fcgov.com/stonnwater/fp-forms.phy.
Response: The civil engineer has accessed these development review
checklists in preparing their documentation.
7. Please note that the Light and Power Utility provides a benefit for new
construction projects called the Integrated Design Assistance Program. The
purpose is to promote energy conservation. Please call Gary Schroeder or
Doug Swartz at 221-6700 for further information. The City's policy is that
the building achieves a L.E.E.D. certification level of Gold.
Response: Gary Schroeder has been part of the Site Base Design Team and
has provided invaluable feedback to us concerning the lighting as well as
the mechanical systems of the relocation of the Fire Station 4. We currently
are on track to obtain a gold certification for this building and we are
aware of, and plan to take advantage of, the integrated design assistance
program.
8. If any trees are removed by construction, and these trees are deemed
significant, then these trees must be mitigated in accordance with the
recommendation of the City Forester and the mitigation schedule outlined in
Section 3.2.1(F).
Response: We have meet Tim Buchanan concerning the trees that will be
removed from the site. Currently, we are asking for 3 apple trees to be
removed, and a small cluster of volunteer elms near the main vehicular
entry into the site. At a meeting with Tim Buchanan and Dana Levitt, it was
requested that all of the Russian Olive trees be removed from the site as
well.
9. Stormwater comments:
A. A portion of this site is in the FEMA-designated Spring Creek 100-year
floodplain and floodway.
Response: Please see we have noted the location of the floodplain and
floodway, as well as the natural area buffer zone, on sheet A-3. Also, a
floodplain plan has been provided in the civil engineering documentation.
B. No new critical facilities are allowed in the floodplain. The fire station and
all necessary driveways must be located outside of the floodplain.
personnel for training purposes, they can use these eleven spaces as well as
the unused firefighter spaces available during non -overlap times.
3. The setback from Drake Road should be such that there is ample area for a
15-foot wide utility easement, trees and foundation shrubs. Also, please
note that the water meter pit must be in a landscaped area.
Response: Please see the Civil Utility drawings.
4. Please provide a direct connecting walkway between the front door and the
public sidewalk along Drake Road.
Response: Given the concrete apparatus response apron is between the
street and the visitor's entry to the building, we would like you to take into
consideration the drive acting as the walking connection to the building.
We could provide a stripped, pathway across this paving to help further
delineate the walking area.
5. As you are aware, the site borders Spring Creek which will require a buffer
distance of at least 100 feet. In addition, there is a stand of mature trees
along the east and southeast of the site which will require a buffer of at least
50 feet. If these buffers cannot be met, then the project will have to comply
with the Buffer Zone Performance Standards stated in Section 3.4.1(E) of
the Land Use Code. Relying on the performance standards versus
compliance with the prescribed buffer distances will require the submittal of
an Ecological Characterization Study. The scope of this study should be
specified by Dana Leavitt, Environmental Planner, 221-6750.
the buffer zones as well as the offset from the tree canopies:'
6. Be sure that there is a bike rack located near the front entry. And, the trash
enclosure should be large enough to accommodate containers for recyclable
materials.
Response: Please see the Architectural site plan noting the bike rack has
been located near the front door and can accommodate 4 bikes. We have
provided at trash enclosure at the northwest corner of the building large
enough to accommodate trash and recycle containers. The City of Fort
Collins Building Design Standards Appendix E Custodial Spaces will be
used as a guideline for this area.
10/22/08
Architecture
Ted Shepard
Planning
City of Fort Collins Current Planning
City of Fort Collins
fnteriors
Re: Poudre Fire Authority Station #4
Preliminary Development Plan Review Application
Dear Mr. Shepard,
Please see that we have provided responses to the conceptual review comments
received on April 4, 2008.
1. The site is located in the M-M-N, Medium Density Mixed -Use
Neighborhood zone district. The proposed use is permitted as a Public
Facility subject to Administrative (Type One) Review.
Response: PDP submittal has been based off of the requirements for a MMN
zone district.
2. The number of parking spaces should be reasonably estimated to include the
number of staff on the largest shift, and some extra spaces for the
community meeting room.
We spoke with Randy Mirowski (Poudre Fire Authority) About staffing
requirements in a 24 hour time period. Randy stated initially there will be 3
to 4 firefighters in any given 24 hour shift. Eventually, within 10 years,
there well be 7 -8 firefighters in any given 24 hour shift. Therefore, to
provide for shift change, there will need to be 16 spaces for firefighters
since both shifts will be on -site during shift overlap. These are the spaces on
the west side of the building. 1 also spoke to Randy about the visitors that
will be using the training/community room that is in the walk out basement.
Randy stated we should estimate that the new fire station would have 25 to
30 visitors in a one week time period. Eleven spaces, including one
P.O. lion 1706
Port Collins. (0 8052_ handicap space, have been provided at the east side of the building for
Ph. )%o.aa-.00:o community room use. If the room is being used by off -site fire authority