HomeMy WebLinkAboutKECHTER CROSSING SUBDIVISION FIRST REPLAT - PDP/FDP - FDP130005 - CORRESPONDENCE - (3)S--e- r3
r.A I rG c 8 / ,e D
J
L �
c of
r as
m
■y NORTHERN
ENGINEERING
ADDRESS: PNDNE:970.221.4158 BSITE
200 S. College Ave. SuHe 10 viw WEBSrrEerne�ncering wm
Fort Collins, CO 80524 FAX: 970.221.4159
Comment Number: 8
4/10/2013: Please add a note vacating the easements from the original plat.
NE: Note has been added to the Plat.
Comment Number: 9
4/10/2013: Please label all properties surrounding this Plat.
NE: Surrounding properties to lots were labeled.
Comment Number: 10
4/10/2013: Please add the dedication information for all streets.
NE: Dedication information for the streets was added to the Plat.
Comment Number: 11
4/10/2013: The easement shown along the south line of Lot 3, Block 4 does not exist
on the original Plat. This needs to be removed or dedicated by separate document.
NE: The easement was deleted to match original plat.
Comment Number: 12
4/10/2013: Please label the use of Common Area B, and add a note stating the use and
who will own and maintain the area.
NE: Common Area B was labeled as "Open Space, Drainage, Irrigation, and Access
Easement (Buildable/Support Buildings)". A note concerning maintenance was on the
original plat.
Comment Number: 13
4/10/2013: Please add `Basis of Bearings" to the south line.
NE: The label 'Basis of Bearings" was added to the south line.
Northern Engineering has responded to all comments from the City, and provided the revised
Plans to the City. If there are other questions or items that need clarification, please do not
hesitate to contact me at 970-568-5412 or Stephanie(@northerneneineerine.com.
Sincerely,
D-3 r t `E
Stephanie Thomas, P.E.
1
� 1
INORTHERN
ENGINEERING
ADDRESS: PHONE:970.221.4158
200 S. College Ave. Suite 10 WEBSRE`
www.northernengineering.com
Fort Collins, C080524 FAX:970.221.4159
Comment Number: 15
4/10/2013: Why are the Site & Landscape Plans not being revised?
NE: The Site and Landscape Plans will be revised with the final plan submittal.
Topic: Plat
Comment Number: 1
4/04/2013: The boundary closes.
NE: Acknowledged.
Comment Number: 2
4/04/2013: Please change "Planning' to 'Planned" in the title, subtitle and Statement
of Ownership and Subdivision. Also add "Crossing' to the subtitle. See redlines.
NE: The title has been changed on the Plat.
Comment Number: 3
4/04/2013: The distances along the east line of Lots 4 & 5 do not add up to the total
distance shown.
NE: The distances were revised on the Plat.
Comment Number: 4
4/04/2013: The delta for curve C1 does not match the original Plat.
NE: The delta for curve C1 was revised on the Plat.
Comment Number: 5
4/10/2013: Are there any lienholders? If so, please add the Lienholders signature
block.
NE: There are no lienholders. The property is fully owned by Meritage.
Comment Number: 6
4/10/2013: Please add vicinity map to the Plat.
NE: A vicinity map was added.
Comment Number: 7
4/10/2013: Please add a note about the title commitment.
NE: Note has been added to the Plat.
ry
NORTHERN
ENGINEERING
Comment Number: 4
ADDRESS: PHONE:970.221.4158
For S. College Ave. Spite 10 YVEBSITE:
Fort Collins, C080524 FAX:970.22t.4159 www.norlhernenVneeraW com
4/10/2013: When doing revisions — The number associated with the revision is based
on is it the first, second, third revision on that page. The numbering needs to be
consecutive so that someone is on looking for the missing revision on that sheet.
NE: The prior revisions were documented and labeled on the Cover Sheet as revisions to
the plans as a whole. If we were to switch the pattern of labeling revisions to be per
sheet vs. per plans, it could cause confusion due to the inconsistency with the Cover
Sheet. I discussed this with Sheri, and we came to the conclusion to keep with the
existing pattern for labeling revisions, but Northern Engineering would add notes denoting
which revisions are not shown on each sheet. In the future, revisions will be denoted as
per sheet.
Comment Number: 5
4/10/2013: See Additional Comments on plans.
NE: The comments on the plans were regarding the revisions numbers and revision
bubbles. The revision bubbles have been changed to reflect the entire changes. The
revision numbering has been changed as described above.
Department: Environmental Planning
Contact: Lindsay Ex, 970-224-6143, Iex(o)fceov.com
Comment Number: 1
4/01/2013: No comments on the proposed plan but thank you for submitting this replat
and saving the tree and the raptor's nest!
o NE: We are happy to make these changes.
Department: Technical Services
Contact: Jeff County, 970.221-6588, lcounty(Mcaov.com
Topic: Construction Drawings
Comment Number: 16
4/04/2013: No comments.
NE: Acknowledged.
Topic: General
Comment Number: 14
4/10/2013: The easement along the south line of Lot 2, Block 4 is not shown, see
redlines.
NE: The easement was added to match the original plat.
■y NORTHERN
ENGINEERING
Response to Comments
ADDRESS: PHONE:970.221,4158 EBS.
200 S. College Ave. Suite 10 W WEBSIThernengineering.wm
Fort Collins, CO80524 FAX:970.221.4159
City of Fort Collins Project No. 379-017
Community Development and Neighborhood Services Date: April 17, 2013
281 North College Avenue
Fort Collins, CO 80522
970-221-6750
Attn: Ted Shepard
Project: Kechter Crossing Replat- Revision 6
Fort Collins, Colorado
Dear Ted,
This letter shall serve as a response to the comment letter, dated April 12, 2013, from the City
of Fort Collins for the Kechter Crossing Replat.
Northern Engineering's responses to the comments are shown below in RED:
Department: Engineering Development Review
Contact: Sheri Langenberger, 970-211-6573, slangenberger o3ceov.com
Topic: General
Comment Number: 1
4/10/2013: Need a note on the plat indicating that the open space, drainage, irrigation
and access easement within the new lot areas is vacated with this plat.
NE: Note has been added to the Plat.
Comment Number: 2
n L 4/10/2013: Need to identify that the common space is an access and drainage
jl easement. Does it also need to be a utility easement?
NE: Common Area B is labeled as "Open Space, Drainage, Irrigation and Access
Easement (BuiIda ble/Support Buildings"
Comment Number: 3
4/10/2013: The utility plan revisions — These cannot be signed until the prior revisions
have been signed. And they cannot be signed until the revised Development Agreement
has been signed by the 3 developers/owners.
NE: The prior revisions and revised Development Agreement have been signed and are
on file with the City.