HomeMy WebLinkAboutLONGVIEW MARKETPLACE @ SHENANDOAH - PDP - 47-95B - REPORTS - CORRESPONDENCE-NEIGHBORHOOD MEETING59. Question: Will there be a bank in the King Soopers store as well as the
bank outside?
Answer: My guess is yes, and it may be the same bank.
60. Comment: I want to express my support for this project.
61. Question: Who do we talk to about additional traffic -related signage
and roundabouts in Ridgewood Hills?
Answer: Please contact the City's Traffic Operations Department and
ask for Eric Bracke or Ward Stanford.
10
50. Comment: The City and the County should work together to improve
streets and reduce impacts, now rather than later.
Response: The City and the County will be working together on
necessary improvements to South College Avenue and
Carpenter Road as part of this development request and
review.
51. Comment: I am excited about this project. I want a coffee shop and an
ice cream shop.
52. Question: Will the exterior of this store (King Soopers) be similar to the
store on Harmony Road?
Answer: It will not be brick but it will be some type of masonry.
53. Question: Will the landscaping be as shown?
Answer: Yes, it will.
54. Question: Will construction start this summer (2003)?
Answer: Best case scenario would be July, 2003.
55. Question: Where will the construction traffic come and go to with dirt
from this project?
Answer: There will be a sizable amount of dirt to be moved from this
site to many different sites in the area.
56. Question: How will this development affect property values on Avondale
Road?
Answer: I am not sure, but it could possibly increase property values.
If I lived here I would consider the supermarket -based
shopping center a plus in my neighborhood.
57. Comment: I have lived here, in Ridgewood Hills, all along and this type
of development on the property has always been planned.
58. Comment: I think this project is great. People who are now against it
will probably shop here.
9
44. Question: Will Carpenter Road continue straight west to South Shields
Street? Ridgewood Hills will probably get a lot of pass -
through traffic from Registry Ridge, to the west.
Answer: No, it will not. Due to constraints associated with a street
going west, down the west -facing slope, and through the
City -owned natural area, the City does not want this street
to continue west past where it is shown on this development
plan.
45. Question: What about the traffic numbers in the area related to this
proposed shopping center?
Answer: This center will contribute about 9% to 10% additional traffic
in the area, short term.
46. Question: Will the City collect Larimer County Road Impact Fees for
improvements to Carpenter Road, to the east, that are
associated with this development? The City and the County
should work together now for street improvements.
Answer: Yes, the City will collect the required Larimer County Road
Impact Fees. The City and the County will be working
together on necessary street improvements to Carpenter
Road.
47. Comment: Carpenter Road (County Road 32) needs to be improved. The
City owns properties/development all the way to Timberline
Road.
48. Question: Who is going to improve Carpenter Road (County Road 32),
and when?
Answer: That is yet to be determined, with the exception of necessary
improvements to the intersection of South College Avenue
and Carpenter Road and a portion of Carpenter Road to the
east that are associated with this development.
49. Comment: I think this is a wonderful project and I am looking forward
to it being in my neighborhood.
3
36. Question: Has any consideration be given to the traffic patterns in the
parking lot?
Answer: The turnover in a supermarket has a lot to do with the
layout and design of the traffic pattern and parking.
37. Comment: Are you familiar with Aldi's Supermarket (in Ohio)? You
never see a cart in the parking lot.
Response: None
38. Question: How many jobs with there be here?
Answer: There will be about 200 jobs.
39. Question: The fueling station will be a King Soopers facility?
Answer: Yes, it will.
40. Question: Will your gas be at a cheap price?
Answer: Yes, it will.
41. Question: Will this grocery store be a 24-hour operation?
Answer: Yes, it will.
42. Question: What will the parking lot lighting look like? Will we glow?
Answer: We are industry leaders with our lighting plan. They will
have horizontal cut-offs and will be down-directional.to
prevent light spillage.
43. Question: Is the signage controlled by the City?
Answer: Yes, the City's Sign Code will regulate our signage.
A
28. Question: If trucks decide not to exit the shopping center back to
South College Avenue and want to go west and north on
Avondale Road, what recourse is there?
Answer: From a King Soopers standpoint, that truck driver would
never drive for us again. Our drivers do what we tell them to
do.
29. Question: How many trucks per day will there be?
Answer: When everything levels out, there will be about 3 large semi -
tractor trailer trucks per day.
30. Question: Why a grocery store in this area with others in the area?
Answer: There is a very big demand for a supermarket here.
31. Question: The building itself. What is being done with this one? Will
King Soopers maintain it over time or will it look like the one
at 29th (Street, Avenue?) in Loveland?
Answer: This will be King Soopers-owned and maintained as a first
class store.
32. Question: Will the landscaping that is shown here be what we see when
the shopping center is done?
33
35
Answer: Yes, it will.
Question: How does this store compare, size -wise, to the store in
Loveland?
Answer: This store will be slightly smaller.
Question: How does this store compare, size -wise, to the store on
Harmony Road?
Answer: This store will be slightly smaller.
Question: Regarding the traffic pattern across the front of the stores, is
it just a lane?
Answer: This is intended to be a private drive, not a street.
6
22. Question: Will the Avondale Road extension be like to the existing
street?
Answer: Yes, it will until you approach the intersection with South
College Avenue, where significant widening and
improvements are needed.
23. Question: Will this project be responsible for street extensions to the
west and north?
Answer: Yes, this shopping center developer will be responsible for
the extension of Avondale Road west to the existing street
terminus in Ridgewood Hills, the extension of Strasburg
Drive north to the intersection with Triangle Drive, and the
construction of Longview Drive between Strasburg Drive and
Avondale Road.
24. Question: If we want to talk to someone about speed bumps or traffic
calming, who do we talk to?
Answer: Please call Eric Bracke, the City's traffic engineer. He is in
the Traffic Operations Department.
25. Question: How soon can I walk down to the store and get a loaf of
bread?
Answer: Probably about 1 year from this June (2003).
26. Question: What kind of drainage issues do you have, with the existing
wetland and all?
Answer: There is an existing storm sewer along the south property
line that goes to and under South College Avenue. Our site
will drain to and through our detention pond and then into
the storm sewer. We will not drain into the wetland.
27. Comment: There is a low area about where your gas station is being
proposed to be.
Response: That is being dealt with as part of our site grading, drainage
plan, and report.
5
15. Comment: I live in Victoria Estates. We get a lot of cut -through traffic
now and it will get worse with this center.
Response: The necessary improvements to the South College Avenue
and Carpenter Road intersection should improve that
situation.
16. Question: Can the County or the City provide speed bumps or other
deterrents on our streets in Victoria Estates?
Answer: Your streets are in the County. You will have to talk to them
about traffic calming.
17. Question: Are all the access points to the shopping center that are
shown on this plan required?
Answer: The operational aspects of a shopping center determine the
access points.
18. Comment: We moved to Ridgewood Hills to avoid the through traffic,
like on Avondale Road. It is very dangerous.
19. Comment: If I am a driver I probably am not going to cut through
Ridgewood Hills. I will stay on South College Avenue (and I
do live in Ridgewood Hills).
20. Question: Will trucks be allowed on Avondale Road?
Answer: They will enter the shopping center from Avondale Road, just
west of South College Avenue, and then exit the center via
Longview Drive to Avondale Road to South College Avenue.
21. Question: Can you address any development plans in the white areas
to the west and north of your site?
Answer: Only that those properties are zoned MMN - Medium Density
Mixed -Use Neighborhood, subject to the permitted uses in
that District. We do not own, and will not develop, those
properties.
2
7. Question: Will the speed limit on South College Avenue be reduced?
Answer: That will be determined by CDOT. It probably will not be
reduced at this time.
8. Question: Will Longview Drive go east to South College Avenue?
Answer: No, it will not.
9. Question: Have you included the study for the corridor between Fort
Collins and Loveland in your review of this project?
Answer: Yes, the study has been considered as part of the
development review for the project.
10. Question: Do you know what bank or other uses will be in the
shopping center?
Answer: Other then King Soopers we have no specific users yet.
Ultimately you will probably see "typical" neighborhood uses
in the center.
11. Question: What are the anticipated changes to the traffic numbers on
Carpenter Road when this shopping center is complete?
Answer: They will increase, partially because they are increasing in
this area even without the center.
12. Question: Does the traffic study take into account the existing rotary
(roundabout) on Avondale Road in Ridgewood Hills?
Answer: That rotary was not analyzed with our study.
13. Comment: The grocery store will exacerbate the rotary in Ridgewood
Hills. A lot of people do not know how to use them.
14. Question: Has there been any discussion about a stop light at South
College Avenue and Triangle Drive?
Answer: Yes, one will be installed there when it is warranted.
3
2. Question: Are any changes being made to Avondale Road and/or
Strasburg Drive?'
Answer: There are no plans to add or delete roundabouts on Avondale
Road. It will be extended from its present terminus south
and east to intersect with South College Avenue and
Carpenter Road (County Road 32).
No changes are planned for the existing Strasburg Drive (in
the Shenandoah development). With this project it will be
extended south to the north boundary of the proposed
development. At that point it is being proposed to transition
into a private drive into the development.
3. Question: What are the plans for the intersection of South College
Avenue and Carpenter Road?
Answer: This is a very complicated intersection. The design is still in
a state of flux. The developer is working with the Colorado
Department of Transportation (CDOT), the City of Fort
Collins, and Larimer County to arrive at a final design for the
intersection.
4. Question: Will there be improvements to the Carpenter Road side of the
intersection with South College Avenue?
Answer: Yes, there will be some improvements. The actual needs (how
far and what type) are still be assessed and discussed.
5. Question: Will the street improvements design be done prior to a public
hearing being held for this development proposal?
Answer: Yes, the design has to be done, with a high level of
information provided for review, before the proposal will be
scheduled for a public hearing.
6. Question: Why is there a left turn into the shopping center if there is a
stop light at Carpenter Road?
Answer: This was predetermined with the CDOT access control plan.
K
Comm- _ty Planning and Environmenta, 2rvices
Current Planning
City of Fort Collins
PROJECT:
I67A04
APPLICANTS:
CONSULTANT:
NEIGHBORHOOD INFORMATION MEETING
Longview Marketplace Shopping Center
February 10, 2003
King Soopers Supermarket
VF Ripley Associates, Inc.
c/o Linda Ripley
CITY PLANNER: Steve Olt �,n
The developers are proposing a (King Soopers) supermarket -based
neighborhood center, to be known as Longview Marketplace, on a portion of the
undeveloped Shenandoah property. The center will be approximately 20 acres
in size. The proposal also includes some additional retail spaces, as well as a
bank and convenience store/gas station. The total square footage of
commercial floor area is approximately 128,000 square feet. The property is
located at the northwest corner of South College Avenue and Carpenter Road
(County Road 32). The primary access to the site will be from the extension of
Avondale Road to Highway 287. There will be other access points from the
north, east and west. The property is in the NC - Neighborhood Commercial
and MMN - Medium Density Mixed -Use Neighborhood Zoning Districts.
This is a follow-up neighborhood meeting to the first one that was held on
August 19, 2002. The notification area for the City's mailing list was expanded
to a minimum of 1,364 feet in any direction and includes all of the Ridgewood
Hills development (up to 4,569 feet from the northwest corner of the proposed
development).
................. QUESTIONS, CONCERNS, COMMENTS, RESPONSES .................
1. Question: How does the irrigation ditch work?
Answer: The existing ditch will be relocated to the west of this
development and piped underground.
1
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020