HomeMy WebLinkAboutLONGVIEW MARKETPLACE @ SHENANDOAH - PDP - 47-95B - REPORTS - TRAFFIC STUDYLIST OF FIGURES
Figure
Page
1.
Site Location
........................................
3
2.
Recent Peak
Hour Traffic
.............................
5
3.
Balanced Recent
Peak
Hour Traffic ....................
6
4.
Site Plan ............................................
9
5.
Short Range
(2006)
Trip Distribution .................
11
6.
Long Range
(2020)
Trip Distribution ..................
12
7.
Short Range
(2006)
Background Peak Hour Traffic ......
14
8.
Short Range
(2006)
Site Generated Peak Hour Traffic ..
15
9.
Long Range
(2020)
Site Generated Peak Hour Traffic ...
16
10.
Short Range
(2006)
Total Peak Hour Traffic ...........
17
11.
Long Range
(2020)
Total Peak Hour Traffic ............
18
12.
Short Range
(2006)
Geometry ..........................
23
13.
Long Range
(2020)
Geometry ...........................
24
APPENDIX
A Base Assumptions Form/Traffic Counts
B Current Peak Hour Operation/Level of Service Descriptions/Fort
Collins LOS Standard
C Trip Distribution
D Signal Warrant Analysis
E Short Range Background Traffic Operation
F Short Range Total Traffic Operation
G Long Range Total Traffic Operation
H Pedestrian/Bicycle/Transit Level of Service Worksheets
TABLE OF CONTENTS
Page
I. Introduction ......................................... 1
II. Existing Conditions .................................. 2
LandUse ............................................. 2
Roads................................................ 2
Existing Traffic ..................................... 4
Existing Operation ................................... 4
Pedestrian Facilities ................................ 4
Bicycle Facilities ................................... 4
Transit Facilities ................................... 4
III. Proposed Development ................................. 8
Trip Generation ...................................... 8
Trip Distribution .................................... 8
Background Traffic Projections ....................... 13
Trip Assignment ...................................... 13
Signal Warrants ...................................... 13
Operation Analysis ................................... 19
Geometry............................................. 19
Pedestrian Level of Service .......................... 19
Bicycle Level of Service ............................. 25
Transit Level of Service ............................. 25
IV. Conclusions .......................................... 26
LIST OF TABLES
Table Page
1. Current Peak Hour Operation .......................... 7
2. Trip Generation ...................................... 10
3. Short Range (2006) Background
Peak Hour Operation .................................. 20
4. Short Range (2006) Total
Peak Hour Operation .................................. 21
5. Long Range (2020),Total
Peak Hour Operation .................................. 22
SHENANDOAH COMMERCIAL
TRANSPORTATION IMPACT STUDY
FORT COLLINS, COLORADO
NOVEMBER 2002
Prepared for:
Quadrant Properties
8000 Maryland Avenue, Suite 640
Clayton, MO 63105
and
King Soopers
65 Tejon Street
Denver, CO 80223
Prepared by:
MATTHEW J. DELICH, P.E.
2272 Glen Haven Drive
Loveland, CO 80538
Phone: 970-669-2061
FAX: 970-669-5034
r011 J. p ST6`o
:� F•.•