Loading...
HomeMy WebLinkAboutLONGVIEW MARKETPLACE @ SHENANDOAH - PDP - 47-95B - REPORTS - TRAFFIC STUDYLIST OF FIGURES Figure Page 1. Site Location ........................................ 3 2. Recent Peak Hour Traffic ............................. 5 3. Balanced Recent Peak Hour Traffic .................... 6 4. Site Plan ............................................ 9 5. Short Range (2006) Trip Distribution ................. 11 6. Long Range (2020) Trip Distribution .................. 12 7. Short Range (2006) Background Peak Hour Traffic ...... 14 8. Short Range (2006) Site Generated Peak Hour Traffic .. 15 9. Long Range (2020) Site Generated Peak Hour Traffic ... 16 10. Short Range (2006) Total Peak Hour Traffic ........... 17 11. Long Range (2020) Total Peak Hour Traffic ............ 18 12. Short Range (2006) Geometry .......................... 23 13. Long Range (2020) Geometry ........................... 24 APPENDIX A Base Assumptions Form/Traffic Counts B Current Peak Hour Operation/Level of Service Descriptions/Fort Collins LOS Standard C Trip Distribution D Signal Warrant Analysis E Short Range Background Traffic Operation F Short Range Total Traffic Operation G Long Range Total Traffic Operation H Pedestrian/Bicycle/Transit Level of Service Worksheets TABLE OF CONTENTS Page I. Introduction ......................................... 1 II. Existing Conditions .................................. 2 LandUse ............................................. 2 Roads................................................ 2 Existing Traffic ..................................... 4 Existing Operation ................................... 4 Pedestrian Facilities ................................ 4 Bicycle Facilities ................................... 4 Transit Facilities ................................... 4 III. Proposed Development ................................. 8 Trip Generation ...................................... 8 Trip Distribution .................................... 8 Background Traffic Projections ....................... 13 Trip Assignment ...................................... 13 Signal Warrants ...................................... 13 Operation Analysis ................................... 19 Geometry............................................. 19 Pedestrian Level of Service .......................... 19 Bicycle Level of Service ............................. 25 Transit Level of Service ............................. 25 IV. Conclusions .......................................... 26 LIST OF TABLES Table Page 1. Current Peak Hour Operation .......................... 7 2. Trip Generation ...................................... 10 3. Short Range (2006) Background Peak Hour Operation .................................. 20 4. Short Range (2006) Total Peak Hour Operation .................................. 21 5. Long Range (2020),Total Peak Hour Operation .................................. 22 SHENANDOAH COMMERCIAL TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO NOVEMBER 2002 Prepared for: Quadrant Properties 8000 Maryland Avenue, Suite 640 Clayton, MO 63105 and King Soopers 65 Tejon Street Denver, CO 80223 Prepared by: MATTHEW J. DELICH, P.E. 2272 Glen Haven Drive Loveland, CO 80538 Phone: 970-669-2061 FAX: 970-669-5034 r011 J. p ST6`o :� F•.•