HomeMy WebLinkAboutEAST RIDGE - FDP - 33-98F - CORRESPONDENCE - (8)This completes staff (and outside reviewing agencies) review and comments
at this time. Red -lined plans from City departments are included with this
comment letter. Additional comments and red -lined plans may be
forthcoming. Another round of staff review is determined to be
necessary. This proposal is subject to the 90-day revision re -submittal
requirement (from the date of this comment letter, being April 13,
2007) as set forth in Section 2.2.11(A) of the Land Use Code. Be sure
and return all red -lined plans when you re -submit. The number of copies of
each document to re -submit is shown on the attached Revisions Routing
Sheet.
If you have any questions regarding these issues or any other issues related
to this project, please feel free to call me at 221-6341.
Yours Truly,
Steve Olt,
City Planner
cc: Susan Joy
East Ridge of Fort Collins, LLC
TST Engineers
Current Planning file #33-98F
Page 11
Topic: SWMM analysis
Number: 166 Created: 4 / 3 / 2007
[4/3/07] No SWMM analysis was provided for the site. Please provide
supporting UDSWMM analysis.
Retention pond should be designed to accommodate two times the one
hundred year generated volume with a 1 foot freeboard, not 1.5 times as
stated in the report.
Topic: Utility Crossings
Number: 152 Created: 12 / 6 / 2005
[4/3/07]
[12/6/05] There are several utility crossings between the water line and
services and the storm lines especially the 72-inch line that could create
problems. In a meeting with ELCO the City and the consultants, it was
agreed that at final the water lines locations would be shifted within the
street section to minimize the number of crossings, use of elliptical storm
lines will be investigated and sleeving of services will be provided when
appropriate.
Number: 187 Created: 4 / 6 / 2007
[4/6/07] There are numerous utility crossings without the recommended
18" clearance. We can live with a 12 inch clearance, but anything less than
that should be adjusted. The note on the storm sewer profile calls for storm
sewer to be wrapped with adhesive tape when crossing water lines. Please
provide manufacturer info on specified wrap material.
The off -site sanitary line crosses the Cooper Slough floodplain and wetlands.
Any such crossing shall meet all City environmental standards and
regulations. Please refer to Dana Leavitt City Environmental planner for
details. A 404 permit from the Army Corps of Engineers as well as a
floodplain use permit.
Please add notes indicating that the crossing will be done within limits of
construction. Show limits of construction on plan. Call out floodplain and
floodway limits on plan. Call out a re -vegetation plan for all disturbed
areas.
Department: Zoning Issue Contact: Peter Barnes
Topic: zoning
Number: 164 Created: 3 / 9 / 2007
[3/9/07] Project Note #19 on sheet SP-2 states that the SF attached units
are on lots 9-15 of Block 5. Actually, they are on lots 9-18 of Block 5. So
the note needs to be changed to reflect Lots 9-18.
Page 10
Topic: Plat
Number: 165 Created: 4 / 3 / 2007
[4/3/07] Please designate Tracts J and K as drainage easements as these
will.be used for future drainage improvements.
Topic: Retention Pond
Number: 192 Created: 4/ 10/2007
[4/ 10/07] Some mechanism of emptying the pond between rainfall events
is needed, since the pond might be full from a previous storm when another
storm occurs. A pumping system into the pipe outfall is needed.
Topic: Storm Line ST-9
Number: 154 Created: 12 / 6 / 2005
[4/3/07] Please provide tables in the report that would identify UDSEWER
nodes and reference them to Manhole numbers.
[12/6/05] That Line will be taking off -site flows from the north. Please size
the stub under Barnstormer Street such that it will accommodate the 270
cfs off -site flow from the north.
Topic: Storm sewer profiles
Number: 189 Created: 4 / 9 / 2007
[4/9/07] Please add notes to storm line profiles indicating that all storm
lines shall have water tight joints to conform with ASTM C443.
Add a note stating that all storm sewer installation shall be inspected by the
City.
Add a note stating that all storm sewers in the right of way shall be owned
and maintained by the City of Fort Collins. It seems that all the storm
sewers will be City owned and maintained except for the line exiting the
pond and tying into the Lake Canal.
Topic: Street capacities
Number: 174 Created: 4 / 3 / 2007
[4/3/07] Street capacities seem to be exceeded in several streets, please
explain how these are handled.
Provide a street capacity analysis for Timberline in order to assess whether
a storm sewer should be stubbed out for the future Timberline Road
construction.
Page 9
Topic: Erosion Control
Number: 160 Created: 12 / 7/ 2005
[4/3/07] Erosion control escrow calculations were not provided.
Please provide a silt fence on the downstream end of the berm on Baker
property.
[12/7/05]
December 6, 2005
At Final, please provide a complete sediment construction management plan
with required report, documents, and calculations.
Topic: Grading Plan
Number: 171 Created: 4 / 3 / 2007
[4/3/07] Please provide a copy of grading agreement on Barker property.
Provide swale B-B cross-section.
No forebay area was shown in storm outfall into park area. Please provide
one.
Topic: Groundwater in irrigation pond
Number: 167 Created: 4 / 3 / 2007
[4/3/07] Has the level of groundwater in the proposed retention pond area
been investigated? Please provide supporting documentation proving that
the proposed retention pond will not cause groundwater to surface. An
additional boring located at the retention pond location would be helpful.
Topic: Inlet Analysis
Number: 172 Created: 4 / 3 / 2007
[4/3/07] There are several inlets where flows exceed inlet capacities.
Please provide explanation in report as to how these will be handled.
Topic: Landscape Plans
Number: 188 Created: 4 / 9 / 2007
[4/9/07] Can the trees in Tract J be moved further south so that trunks are
not right at edge of clear zone.
Topic: Pipe transition in Park
Number: 191 Created: 4/ 10/2007
[4/ 10/07] The 72 inch pipe in the park transitions to a smaller 48 inch
pipe with a bubbler inlet. Due to maintenance concerns on the trash rack
above, this design does not conform with our safety criteria. Please use a
larger size pipe to the pond.
Page 8
located technically in the Cooper Slough Boxelder basin, it is impacted by
this overflow, which is detailed in the Dry Creek master drainage plan.
Topic: Details
Number: 190 Created: 4 / 9 / 2007
[4/9/07] Please provide details for the pond outlet structure.
Topic: Drainage Report Narrative
Number: 173 Created: 4 / 3 / 2007
[4/3/07] .Please expand narrative to explain what master plan requirements
are for the site and how they are being met, especially with regard to the
Black Hollow update area. Please note that these plans are being sent to
ACE for them to review and analyze the implications of this site on our
drainage master plans.
Topic: Drainage through the Puture Park site.
Number: 151 Created: 12 / 6 / 2005
[4/3/07] Provide design for overflow swale in Park.
Park Grading should be agreed to with Parks Department representative so
that area can accommodate master plan detention requirements.
Pond outlet elevation needs to be in conformance with Dry Creek Master
Plan update for the Black Hollow Basin.
Future pond outlet may have conflict with proposed water lines and fittings
[12/6/05] Grading in future park area needs to be worked out so that the
site accommodates detention while still allowing the park to have flexibility
in design. This grading should be agreed to with the park and stormwater
prior to plan approval. A meeting should be set up with myself from
Stormwater and Craig Foreman from Park Planning and Development to
finalize the proposed grading on the park site prior to Final Plan submittal.
No forebay is proposed on one of the outfall locations off of Sykes Drive
please adjust or show better how the proposed swale will act as a sediment
forebay.
3 pipes are shown coming through the park site. It would be preferable if
these are consolidated into one box culvert in order to maximize future use
by the park.
Page 7
Number: 44 Created: 4/ 20/ 2005
[4/ 12/07] Repeat comment. Minimum VC's haven't been met on Sykes.
[11/22/051 Final Compliance. The comment still needs to be addressed.
[8/2/05] [4/20/05] Vertical crest and sag curves must be in accordance
with details 7-17 and 7-18.
Department: PFA Issue Contact: Carte Dann
Topic: fire
Number: 177 Created: 4 / 4 / 2007
[4/4/07] STREET ACCESS: Per applicant response and previous meetings
with Ron Gonzales of PFA, an Emergency Access Easement will be dedicated
on the plat, meeting the requirement for various phases of construction, for
an acceptable second point of access for emergency vehicles. When and if
connectivity to adjoining property is available, access can be taken from
those connecting streets, if they meet PFA standards for separation
distance. The EAE shall be visible by painting and/or signage, a minimum
of 20 feet wide, and maintained unobstructed at all times. Some type of
barricade probably will be needed at each end of the EAE, to prevent use by
non -emergency vehicles. Contact Carie Dann for specifics on signs,
barricades, etc.
Number: 178 Created: 4 / 4 / 2007
[4/4/07] STREET NAMES: Hawker and Katana are too close to existing
street names and are not permitted.
Department: Stormwater-Water-Wastewater Issue
Contact: Basil Hamdan
Topic: 24-inch Raw Water Irrigation line
Number: 153 Created: 12 / 6 / 2005
[4/3/07]
[12/6/05] Please shift the proposed 24-inch irrigation water line to the
north edge of Tract J in order to allow the placement of a future box culvert
outfall through the that area. Please provide a cross -sectional view through
that tact that would allow an outfall system to be built through that area. It
would be ideal if a 30-foot wide swath is left open from trees and other
utilities which would allow the City to build the master planned box at a
future date.
Topic: Canal Overflow (Larimer and Weld)
Number: 120 Created: 8 / 5 / 2005
[4/9/07]
[8/5/05] According to the Dry Creek master plan, the Larimer and Weld
Canal has a spill upstream of this area of 290 cfs (Conveyance Element
953). These flows will need to be routed through this site. This spill is
shown on the approved Dry Creek master plan. Even though this site is
Page 6
joint irrigation pond could be located. The plans at this time appeared to
work for the park and for the development. I do remember talking to the
engineers about the potential to reduce the size of some of the stormwater
pipes on the west side of the park and have some stormwater flow in a small
swale to the irrigation pond area. The direction was that we would still need
slopes that people could walk across for access to the park.
The current plans are showing a major change in the configuration of the
irrigation pond area and a major swale along the west side of the park.
From the meeting with Susan, Basil and Anderson Consulting yesterday it
appears the current plan needs considerable discussion to make it
comfortable for Stormwater and myself. The main points for the park are:
1. The steep swale along the west side of the park is not acceptable.
2. The large and deep irrigation/detention pond is not acceptable.
3. The park can not be inundated with stormwater flows to an extent that
prevents the development of the park with restroom, shelter,
playground, etc. I gave Susan and Basil some criteria for the park that
should help with this item.
Topic: Plat
Number: 186 Created: 4 / 6 / 2007
[4/6/07] From Technical Services:
1. Boundary and legal close.
2. Does this plat accommodate future International Boulevard, as shown
on the Master Street Plan?
3. Many line over text issues - scanning problem.
4. Block Boundaries - distances through 45 degree alleys - make block
boundaries unique.
5. Site Plan does not need all the bearing and distance information.
Topic: Street Design
Number: 43 Created: 4/20/2005
[4/12/07] [11/22/051 Final Compliance - call out the appropriate detail for
the sidewalk culverts from the alley to the street (D 10-13) on sheet xx.
[8/2/05] No more than 500 s.f. of surface area may drain over a public
sidewalk.
[4/20/051 Will need sidewalk culverts at all Alley intersections to take the
drainage out to the street. Cannot drain over sidewalk.
Page 5
and when that happens, another acceptable secondary point of access will
be required prior to the release of future phases.
Topic: General
Number: 25 Created: 4 / 20 / 2005
[4/ 12/07] [11/ 17/05] Just keeping the comment open through Final
Compliance.
[8/2/05] The City agrees that the developer can provide an escrow for the
cost of final design and construction of that portion of International Blvd
from its SE corner west to a point representing the easternmost 1/3 of the
wetland. The developer will be given the option to credit this cost against
the payment from the City for Timberline ROW costs. The developer does
not need to provide a final design for this roadway at this time, but does
need to provide a preliminary design of this roadway so that drainage
patterns and roadway grades for the three street stubs that tie into
International Blvd will be accommodated. The city also agrees that the
developer shall provide interim and ultimate designs for the three street
stubs to International Blvd and escrow the costs to construct the portion of
the roadways that will not be constructed with the development. It needs to
be clarified that the portion of roadway adjacent to buildable lots will need
to be constructed in accordance with Section 24-95 of the City Code and
Section 3.3.2(D)(6) of the Land Use Code. Estimates for the escrow amounts
must be submitted by a license professional engineer for the City's review
and approval and those amounts will be added into the Development
Agreement.
[4/20/_05] This development is responsible for the design and construction
of International along its frontage. Need an interim and ultimate design for
your street stubs to it. Will need to provide an estimate for the construction
of the street stubs to the property line for our review and approval. That
amount will go into the DA.
Number: 35 Created: 4 / 20 / 2005
[4/ 12/07] Still have some problems with overlapping text on the utility
plans ... I've highlighted most of it in pink so you can see where the problems
are. Some of the spot elevations were hard to read and because the street
elevation may change due to minimum cover issues over the utilities,
thought I would hold off on reviewing the spot elevations until the next
round.
[ 11 / 22 / 05] Final Compliance. Please see E6 and visit with JR in Tech
Services to discuss the scannability of the plan sets.
[8/2/05] [4/20/051 See Appendix E6 for all scanning requirements.
Number: 193 Created: 4/ 12/2007
[4/ 12/07] From Park Planning: My last look at this project was in
November of 2005 when the plans came around for development review. We
are still interested in the park site location. We had also seen where the
Page 4
Number: 198 Created: 4/ 13/2007
[4/ 13/07] City staff has not received any comments from Boxelder
Sanitation District, the sanitary sewer provider for this development.
Therefore, please work directly with the District regarding their
requirements.
Department: Current Planning Issue Contact: Dana Leavitt
Topic: Utility Plans
Number: 179 Created: 4 / 4 / 2007
[4/4/07] Revise signature block from Natural Resources to provided title
(by Current Planning) on the following sheets: Cover Sheet, General
Conditions & Specifications Sheet, Master Grading Plan, Detailed Grading
Plans,
Number: 183 Created: 4 / 5 / 2007
[4/5/07] Add notes to Grading and Erosion Control Notes: Stockpiling of
wetland soils per the Wetland Mitigation Report. Include a maximum height
of stockpiles.
Department: Engineering Issue Contact: Susan Joy
Topic: Emergency Access
Number: 20 Created: 4 / 20/ 2005
[4/ 12/07] Please provide the exhibit below and extend the profile on the
plan and profile sheets out at least 50' to show how it will tie into the
existing.
[11/22/05] Ron Gonzales has requested a separate exhibit with the EA
drive profile overlayed with their truck template to make sure their trucks
can negotiate the sags and crest curves.
[8/2/05] Repeat. The emergency access easement shown or its proposed
location does not meet Poudre Fire Authority's (PFA) minimum
requirements. As stated below, this development is required to design and
construct a second point of access acceptable to PFA in both the interim
and ultimate conditions if you want to pull building permits for the entire
site. In order to determine if the EA drive works in both the interim and
ultimate, enough preliminary horizontal AND vertical design is required on
the plans before going to public hearing. Please provide a plan and profile of
the EA road as well as a plan and profile and show how it ties into
Timberline in both the interim and ultimate. If you can not show that the
EA drive will work in the ultimate, than only half the site will be allowed to
pull building permits and this site would have to be phased or done in
separate filings (please see comment 21).
[4/20/05] This development as shown with is out of fire access. A second
point of access is required per Ron Gonzales with PFA. He has agreed to a
temporary emergency access lane off the north west side of the property in
the interim BUT this may go away if the over/under pass is constructed. If
Page 3
Number: 176 Created: 4 / 4 / 2007
[4/4/07] Delineate existing 100' wetlands buffer and final wetlands buffer
separately to reflect buffer from edge of mitigated wetlands.
Department: Current Planning Issue Contact: Steve Olt
Topic: Parks
Number: 169 Created: 4 / 3 / 2007
[4/3/07] Craig Foreman, Parks Planning, indicated that the proposed park
site (south central portion of the development plan just north of the open
space/detention/wetland/irrigation storage area) is fine. However, based on
the current Final Plans he has several additional comments (see Number
193, 4/ 12/07).
Topic: Post Office
Number: 170 Created: 4 / 3 / 2007
[4/3/07] Bonnie Ham of the U.S. Postal Service (USPS) indicated that the
developer must provide neighborhood mail boxes. USPS will require a
minimum of 25 Type III CBU's. They must be installed at agreed -upon
locations.
Department: Current Planning Issue Contact: Dana Leavitt
Topic: Railroad
Number: 182 Created: 4 / 5 / 2007
[4/5/07] Show Limits of Development on Site Plans.
Department: Current Planning Issue Contact: Steve Olt
Topic: Site Plan
Number: 168 Created: 4 / 3 / 2007
[4/3/07] The year in the signature blocks on the cover sheet of the Site
Plan set must be changed to 2007 (from 2005).
Number: 196 Created: 4/ 12/2007
[4/ 12/07] In the LEGEND on Sheet SP-2 of the Site Plan set there is a
symbol for "Existing Tree/Trunk Cluster to Remain"; however, there does
not appear to be any of these shown on the Site Plans.
Number: 197 Created: 4/ 12/2007
[4/ 12/07] Please see Sheet L1 of the Landscape Plan for a minor revision to
the LANDSCAPING ASSURANCES statement.
Topic: Utility Plans
Number: 194 Created: 4/ 12/2007
[4/ 12/07] Darwin Williams of ELCO indicated that their remarks were
included on red -lined utility plans that have been returned to the
developer's engineer.
Page 2
City of Fort Collins
Jim Sell Design, Inc.
c/o Matt Blakely
153 W. Mountain Ave.
Fort Collins, CO 80524
STAFF PROJECT REVIEW
Date: 04/ 13/2007
Staff has reviewed your submittal for EAST RIDGE PDP - FINAL PLANS,
and we offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Steve Olt
Topic: General
Number: 195 Created: 4/ 12/2007
[4/ 12/07] Dana Leavitt, the City's Environmental Planner, has provided
his comments on a FINAL PLAN COMMENT SHEET and red -lined
Landscape, Master Grading, and General Notes & Specifications Plans.
Department: Current Planning Issue Contact: Dana Leavitt
Topic: General
Number: 184 Created: 4 / 5 / 2007
[4/5/07] Development Agreement and HOA documents are to include
provisions for the protection of the wetlands as articulated in the Wetland
Mitigation Report.
Number: 185 . Created: 4 / 5 / 2007
[4/5/07] Further coordination with Basil Hamdan and Dana Leavitt for
preserving the integrity of the wetlands is needed to satisfy the City that the
depth of the irrigation pond will not lower the water table within the wetland
area, causing further degradation.
Topic: Grading Plan
Number: 180 Created: 4 / 5 / 2007
[4/5/07] Grading around 3 cottonwoods designated to be protected is in
conflict with Section 3.2.1(G) standards as articulated on L-9, Existing Tree
Mitigation Plan.
Number: 181 Created: 4 / 5 / 2007
[4/5/07] Show Limits of Development on Grading Plans, Erosion Control
Plans and Phasing Plans.
Topic: Landscape Plans
Number: 175 Created: 4 / 4 / 2007
[4/4/07] Show Limits of Development on L4, L5, L6 and L8.