Re: East Ridge Utility Plans: 2nd Review
Dear Mr. Rand:
(6
MAY 2 3 2008���
Plans for the East Ridge development were received at Boxelder Sanitation District (District). District
staff have reviewed and redlined the drawings. The following comments are to further clarify redlines.
Note that comments below are not included for all redlines on the drawings.
Sheet #
Comment
All
Use updated signature block — updated version emailed to Keith Sheaffer on 19
Sheets
May 2008.
Plat
Add the plat language for sewer easements — emailed version to Keith Sheaffer
she 1
on 19 May 2008.
of 10
i
51
See redlines, need to revise location of MH NM10010 so that it is more
accessible.
64
Easement for sewer is called out as 25-ft, plat shows 30-ft. District requires 30-ft
as called out on plat.
Please return these redlines with future submittals to aid in our back -checking of the revised drawings.
I hope these comments and the redlines are clear enough to be easily addressed in a revision to these
plans. If there are questions, please contact me at 970-498-0604.
S:\DEVELOPMENT\Basins\West_Basin\Cooper_Slough_lnterceptor_Subbasin\East Ridge\Design Review\2008-5-22-2nd-
review.doc
3201 East Mulberry, Unit Q - P.O. Box 1518 • Fort Collins, Colorado 80522
Phone (970) 498-0604 9 Fax (970) 498-0701 • Email bsd@verinet.com
BA s'9/?,F X�EC:EIV +'
9
m
MAY 2 3 20008
22 May 2008
Jim Sell Design, Inc.
153 West Mountain Avenue
Fort Collins, Colorado 80524
Re: East Ridge Utility Plans: 2nd Review - Landscape
Jim Sell Design:
Plans for the East Ridge development were received at Boxelder Sanitation District (District). District
staff have reviewed and redlined the landscaping drawings.
The District is concerned with the close proximity to the sanitary sewer line of some trees as shown on
drawings L6 and L7. The District has redlined those drawings indicating trees it believes are
problematic. The driplines of large trees (e.g. cottonwood, hackberry, etc.) must not overlap that of the
sanitary sewer so that the potential from root intrusion into the sewer is minimized. Root intrusion
leads to more frequent maintenance by the District and even with increased maintenance, can result in
sanitary sewer backups.
Please return these redlines with future submittals for our use in back -checking the revised drawings.
Please review the redlines. If there are questions, please contact me at 970-498-0604.
S \DEVELOPMEN-nBasins\West_Basin\Cooper_Slough_lnterceptor Subbasin\East Ridge\Design Review\2008-5-22-2nd-
review-la ndscape.doc
3201 East Mulberry, Unit Q - P.O. Box 1518 • Fort Collins, Colorado 80522
Phone (970) 498-0604 0 Fax (970) 498-0701 • Email bsd@verinet.com
give the issue contact as Susan Joy. Please change this contact department to PFA
and also contact person to Carie Dann.
Department: Stormwater-Water-Wastewaterlssue Contact: Basil Hamdan
Topic: Erosion Control
Number: 283 Created: 5/27/2008
[5/27/08] Please provide an erosion control construction schedule for each phase.
Please provide a cost estimate and a security amount for each phase in the report.
All disturbed areas within Phase 2 construction or off -site sewer construction should
be re -vegetated. Please add notes to that effect.
Topic: Storm sewer analysis
Number: 284 Created: 5/27/2008
[5/27/08] It seems that in the 100 year there will water backing into the street from
the inlets at a couple of locations. Please correct if possible or provide a variance
request.
Topic: Utility Plans
Number: 285 Created: 5/27/2008
[5/27/08] Please move line raw water irrigation line (ST-RW) 5 foot to the north in
order to provide as much room as possible to the future outlet pipe from the pond.
Another round of review is necessary before City staff will consider asking for
mylars of the plans. Be sure and return all red -lined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this
project, please feel free to call me at (970) 221-6341.
Yours Truly,
eve Olt
City Planner
cc: Susan Joy
East Ridge of Fort Collins, LLC
TST Engineers
Current Planning file #33-98F
Page 17
Number: 265 Created: 5/10/2007
[5/30/08] Please see earlier comment regarding the need to place the exhibit in the
utility plans.
[5/10/07] See sheet 159
Topic: Utility Plans - Water Line Plan & Profiles
Number: 232 Created: 5/10/2007
(5/29/08] Please add the city's street cut note to all sheets that have a street cut.
The limits were shown in this round but the note still has not been added.
[5/10/07] Need to show approximate limits of all street cuts and add the city's street
cut note.
Number: 234 Created: 5/10/2007
[5/29/08] See the comment regarding the variance request.
[5/10/07] See earlier comments regarding minimum cover requirements within the
city's street section.
Department: PFA Issue Contact: Carie Dann
Topic: fire
Number: 177 Created: 4/4/2007
[5/28/08] EMERGENCY VEHICLE ACCESS Thank you for sheet 159 of 192 "Street
Plan and Profile Emergency Access Road." However, in addition to what is shown
on this page, you will also need to implement/show the fire apparatus travel path on
the EAE. Please contact me if you need a truck template.
[4/4/07] STREET ACCESS: Per applicant response and previous meetings with
Ron Gonzales of PFA, an Emergency Access Easement will be dedicated on the
plat, meeting the requirement for various phases of construction, for an acceptable
second point of access for emergency vehicles. When and if connectivity to
adjoining property is available, access can be taken from those connecting streets, if
they meet PFA standards for separation distance. The EAE shall be visible by
painting and/or signage, a minimum of 20 feet wide, and maintained unobstructed at
all times. Some type of barricade probably will be needed at each end of the EAE, to
prevent use by non -emergency vehicles. Contact Carie Dann for specifics on signs,
barricades, etc.
Number: 178 Created: 4/4/2007
[5/28/08] STREET NAMES Because neither Hawker nor Katana are acceptable
street names, I will need to review the two new, proposed street names prior to the
project going to mylars. Mylars is too late to be able to review the new names.
[4/4/07] STREET NAMES: Hawker and Katana are too close to existing street
names and are not permitted.
Number: 290 Created: 5/28/2008
[5/28/08] Comments regarding Emergency Access (such as comment 20) dated
April 4, 2oo5; August 2, 2005; November 22, 2005; and April 12 and May 10, 2007,
Page 16
emergency access does not work in the ultimate condition, then Phase 2 building
permits will not be issued until an acceptable second point of access is provided.
[5/10/07][4/12/07] Please provide the exhibit below and extend the profile on the
plan and profile sheets out at least 50' to show how it will tie into the existing.
[11/22/05] Ron Gonzales has requested a separate exhibit with the EA drive profile
overlayed with their truck template to make sure their trucks can negotiate the sags
and crest curves.
[8/2/05] Repeat. The emergency access easement shown or its proposed location
does not meet PFA's minimum requirements. As stated below, this development is
required to design and construct a second point of access acceptable to PFA in both
the interim and ultimate conditions if you want to pull building permits for the entire
site. In order to determine if the EA drive works in both the interim and ultimate,
enough preliminary horizontal AND -vertical design is required on the plans before
going to public hearing. Please provide a plan and profile of the EA road as well as
a plan and profile and show how it ties into Timberline in both the interim and
ultimate. If you can not show that the EA drive will work in the ultimate, than only
half the site will be allowed to pull building permits and this site would have to be
phased or done in separate filings (please see comment 21).
[4/20/05] This development as shown with is out of fire access. A second point of
access is required per Ron Gonzales with PFA. He has agreed to a temporary
emergency access lane off the north west side of the property in the interim BUT this
may go away if the over/under pass is constructed. If and when that happens,
another acceptable secondary point of access will be.required prior to the release of
future phases.
Number: 223 Created: 5/10/2007
[5/28/08] Please include in the emergency access road typical section what the
grading is like on either side. The grading sheets don't show a swale on either side
to handle the drainage and the road appears superimposed on the contours. You'll
need to grade specifically for this road plus deal with the drainage somehow.
(5/10/07] Please provide a cross section, a plan and profile and identify all materials
for the proposed 12' access road along the southern property boundary if this is
meant to be for PFA. If not, and its more of a maintenance road, then just give the
cross section and identify the materials its to be constructed out of. Thanks.
Also, the access road has to be within 10 degrees of 90 for the first 25' off Dassault.
Number: 260 Created: 5/10/2007
[5/29/08] The EA drive still does not show grading outside the drive limits. Must
match the grading sheet.
[5/10/07] See sheet 149 - Provide a typical cross section for the emergency access
drive, a CL profile and call out what it is constructed out of.
Page 15
Topic: Utility Plans - Storm Sewer P&P
Number: 240 Created: 5/10/2007
[5/29/08] Keeping this open until the variance request has been properly
resubmitted and the appropriate info called out on the plans in all locations that
minimum cover is not met.
[5/10/07] Minimum cover issues here as well.
Number: 318 Created: 5/30/2008
[5/30/08] Sheet 99 - Please show where the easement is on the profile plus station
it so they know where it is the field.
Number: 319 Created: 5/30/2008
[5/30/08] Please provide the proposed International profile on sheet 99 so that we
can determine that the minimum cover requirements can be met.
Number: 320 Created: 5/30/2008
[5/30/08] Please remove all unnecessary information off the plan view.
Topic: Utility Plans - Street Section Details
Number: 275 Created: 5/10/2007
(5/30/08] Still need 1606.
(5110/07] Please provide drawings 706, 707, 1601, 1606.
Topic: Utility Plans - Striping Plan
Number: 266 Created: 5/10/2007
[5/29/08] Why has the bike lane been reduced to 6'? Please see Ward/Traffic
Engineering and Denise Weston in Transportation Planning. A variance request
completed per 1.9.4 will be required for their review and approval if not the standard
8.
[5/10/07] See sheet 160 for redlines. Need to start taper earlier, reverse the bike
and right turn lane and adjust the one lane width circled. Wouldn't hurt to meet with
Matt, me and Ward or something to iron this out for you so you don't have to keep
messing with it. A 5' temp asphalt sidewalk is called out, should say 6'. Need a
ramp to get the bikes from the sidewalk to the onstreet bike lane.
Topic: Utility Plans - Timberline Ultimate Grading
Number: 264 Created: 5/10/2007
[5/29/08] Still need to show property lines and label property owners.
[5/10/07] Please label contours for existing grades. Label existing features like the
ditch, property lines, etc.
Topic: Utility Plans - Ultimate EA Road
Number: 20 Created: 4/20/2005
[5/28/08] 1 have not received this exhibit to date and after talking to PFA, it was
determined that this exhibit needs to be shown on the utility plans, sheet 159. If the
Page 14
gutter on the east side. Correct the typical street section so that the sidewalk on the
east side is labeled as future, to be built by others.
Topic: Utility Plans - RW Irrigation P&P
Number: 241 Created: 5/10/2007
[5/29/08] Keeping this open until the variance request has been properly
resubmitted and the appropriate info called out on the plans in all locations that
minimum cover is not met.
[5/10/07] Minimum cover issues here too.
Number: 321 Created: 5/30/2008
[5/30/08] Please remove all unnecessary information off the plan view.
Number: 322 Created: 5/30/2008
[5/30/08] Please add the city's street cut note.
Number: 323 Created: 5/30/2008
[5/30/08] Sheet 103 - Refer to sheet number where referencing a detail.
Topic: Utility Plans - Sanitary Sewer/International Blvd P&P
Number: 239 Created: 5/10/2007
[5/29/08] Keeping this open until the variance request has been properly
resubmitted and the appropriate info called out on the plans in all locations that
minimum cover is not met.
[5/10/07] Minimum cover not being met in several areas.
Number: 317 Created: 5/30/2008
[5/30/08] Note number 5 needs to reference the sheet number the cut off wall detail
is shown on. Correct this note on all sheets.
Topic: Utility Plans - Sanitary Sewer/Peakview
Number: 235 Created: 5/10/2007
[5/28/08] See comment 230.
[5/10/07] Again, who is constructing this? You or Peakview? Please provide more
information in order to build this and let me know about the timing of the whole thing.
Number: 236 Created: 5/10/2007
[5/28/08] Peakview plans have not been approved as of yet so there are no
construction plans on file with the County. Either that set needs to be approved and
on file or this set of plans will need to design it and the Peakview folks will need to
sign off on them prior to final approval of mylars.
[5/10/07] Are you constructing this line, placing the manholes at existing grade and
then Peakview is raising them later? Peakview's plans may need to be revised in
order to reflect this.
Page 13
Number: 250 Created: 5/10/2007
[5/29/08] Please carry the profiles out at least 50' past the matchline on all plan and
profile sheets.
[5/10/07] Yeager St, sheet 117 - not enough overlap between sheets, missing
information.
Number: 252 Created: 5/10/2007
[5/30/08] This has not been done.
[5/10/07] Take all profiles out to the CL of the street being intersected.
Number: 253 Created: 5/10/2007
[5/29/08] Please label all curb types in the plan view. Only some blocks are labeled
with this round. Please label all typical street sections with the appropriate street
section on all sheets where more than one section is shown.
[5/10/07] Label the transition from VC to Rollover or where one ends and the other
starts at a curb return or something like that.
Number: 314 Created: 5/30/2008
[5/30/08] Need full design for both interim and ultimate to the property line where all
streets stub out to the future International Blvd (see comment 25). You can combine
this information on the existing profiles and label as interim and ultimate.
Number: 324 Created: 5/30/2008
(5/30/08] Sykes Drive - Not enough information is shown to construct the median. If
the median infall gutter stays, we will need a profile for that plus an inlet to handle
the drainage. If you change to outfall gutter, you can drop the 3% cross slope to 2%
and provide more spot elevations so that it is clear how to build it and how it will
drain. Please provide a separate detail for the ped refuge area showing enough
spot elevations and cross slopes to construct it (all grades must meet ADA
requirements).
Number: 325 Created: 5/30/2008
[5/30/08] Missing spot elevations in the intersections. See details 7-27 and 7-28. 1
did not go through every intersection looking for every missing spot - please do so
and resubmit. I will review when all information is present.
Number: 326 Created: 5/30/2008
(5/30/08] Typical street sections must match the profile labeling. Call out as east
and west versus left and right.
Number: 327 Created: 5/30/2008
[5/30/08] Sheet 126 - need to call out interim and ultimate improvements.
Number: 328 Created: 5/30/2008
[5/30/08] Delozier is showing that curb, gutter and sidewalk is to be installed in the
future by others. This is incorrect. This development must construct the curb and
Page 12
Topic: Utility Plans - Overall Utility Plan
Number: 227 Created: 5/10/2007
[5/29/08] The crossing table only provides the depth and clearance information. Is
this sufficient? Do you need to reference specific lines or sheets?
[5/10/07] Note 17 says to see sheet 185 for crossing table. No such table provided
on 185.
Number: 229 Created: 5/10/2007
[5/29/08]
[5/10/07] Sheet 42 - The access road is called out on this sheet for the first time as
a 12' nature trail/sewer maintenance road. You will need to provide additional
easements in order to allow this use to occur.
Number: 233 Created: 5/10/2007
[5/29/08] The approximate limits have been shown, however the street cut note has
not been added. Please review section 25.7 of LCUASS for street patch
requirements to make sure that the limits shown meet our standards. Please add
the following statement to all sheets that show a street cut:
Limits of street cut are approximate. Final limits are to be determined in the field by
the City Engineering Inspector. All repairs to be in accordance with City street repair
standards.
[5/10/07] Need to show approximate limits of all street cuts and add the city's street
cut note.
Topic: Utility Plans - P&Ps
Number: 244 Created: 5/10/2007
[5/29/08] Repeat. Please identify the transition length as required by 7-27 and 7-28.
[5/10/07] Need to identify the point of transition to remove the crown at all
intersections, minimum 30' from FL - see figures 7-27 and 7-28.
Number: 247 Created: 5/10/2007
[5/30/08] This may need to happen yet.
[5/10/07] If the plan view starts to get too cluttered to meet the scanning
requirements, you could make a separate sheet(s) for the intersection details. That
way you could make the spot font a little bigger and it won't make the P&P sheets
too hard to read. Just a suggestion...
Number: 248 Created: 5/10/2007
[5/29/08] Repeat. Please clearly identify both interim asphalt sidewalks beginning
and end and label with ultimate concrete sidewalks to be installed with future
development OR when temp asphalt sidewalks are not required, install/label with
type III barricades.
[5/10/07] Please provide Type III Barricades (and detail on the detail sheet) for all
dead end sidewalks and street stub outs unless the street is ending in a temp
turnaround. Need to show on the grading and utility sheets too.
Page 11
Topic: Utility Plans - General Notes
Number: 297 Created: 5/30/2008
[5/30/08] Line 48 of the General Notes needs to state the code, what it requires and
what the variance was granted for. Please do not refer to a letter as this info needs
to be part of the plan set.
Topic: Utility Plans -Grading
Number: 226 Created: 5/10/2007
[5/28/08] Repeat comment. The grading sheets must match the plan and profile
sheets.
[5/10/07] Please provide grading sheets for all offsite work for tying into the Peak
View project. Need enough information to construct it as well.
Number: 230 Created: 5/10/2007
(5/28/08] The plans now label the offsite waterline to be constructed by Peakview
and the sanitary sewer line to be constructed by Eastridge. That is fine, however,
BOTH lines need to be constructed before the issuance of the first building permit in
Eastridge. This could potentially hold up your project.
[5/10/07] Sheet 43 - this ties into an earlier comment. Who is this work proposed
by? If constructing with this project, please provide a full design for it and any
necessary offsite easement in order to do it. If the work is being done by others and
this development depends on it, then their timing will affect your ability to start your
project. We might want to talk about this more.
Topic: Utility Plans - Grading Phasing Plan
Number: 224 Created: 5/10/2007
[5/28/08] [5/10/07] Need more overlap between sheets. Scanning is a problem
here as well.
Number: 310 Created: 5/30/2008
[5/30/08] Please move all text off proposed grading as it hides what is proposed to
be constructed. It appears that some of the grading shown in Phase 2 is actually
under Phase 1 as overlot and detailed grading necessary to support Phase 1 until
Phase 2 is constructed. Please update the plan to reflect that accurately.
Number: 311 Created: 5/30/2008
[5/30/08] The temporary turnaround is called out with 6" gravel base course. The
requirement is that it must be an all weather surface. Please make sure this material
complies with PFA's definition of an all weather surface.
Topic: Utility Plans - Master Grading Sheets
Number: 217 Created: 5/10/2007
[5/29/08] Please see John Pedas in Tech Services prior to the next submittal.
[5/10/07] These sheets probably won't scan. Perhaps reducing the pen width might
help make the lines and text less fuzzy.
Page 10
Number: 212 Created: 5/10/2007
[5/28/08] This still remains an issue. Please provide enough design information
past the matchline so that each lot is shown in its entirety on at least one sheet.
[5/10/07] There is not enough overlap at the matchlines.... missing as much or more
than an entire lot between the sheets.
Number: 219 Created: 5/10/2007
[5/28/08] [5/10/07] Please label all easements dedicated by separate document
with the reception number.
Number: 222 Created: 5/10/2007
[5/28/08] Scannability has improved with this round but there are still scanning
issues with the set.
[5/10/07] Lots of scanning issues with the plan set. Need to correct all line over
text, reduce some pen widths so that the text isn't blurry and make sure you're
meeting minimum font sizes. Please see JR or John Pedas in Tech Services if you
have any questions.
Number: 225 Created: 5/10/2007
[5/29/08] The lots listed below may only take driveway access off Dassault unless
temp turnarounds are provided for the street they wish to take access off of. This
requirement will go into the DA and a note stating such must be placed on the
site/landscape/utility plan grading and street plan and profile sheets so that it is very
clear to any potential owner of these lots where their drive must take access from.
[5/10/07] Must provide temp turnarounds in order to pull building permits for lots 1,
2, 27-29 off Dassault between Katana and International. Cannot pull a permit at all
for lot 2 unless entire street frontage is constructed.
Number: 255 Created: 5/10/2007
[5/30/08] Please provide detail D10, 11, 12 or 13 (whichever appropriate) and refer
to detail/sheet number on all P&P and grading sheets. Please design in accordance
with said detail. This applies to any sidewalk chase in public row whether they
appear on alleys or public streets. Please remove detail 709 on sheet 189 and
replace it with the appropriate detail(s).
[5/10/07] Alleys - Label all sidewalk chases and drainage pans and label detail #,
sheet'.
Number: 277 Created: 5/10/2007
[5/29/08] [5/10/07] Please check each sheet for comments as I'm not 100% sure
that I typed every one out and I did not put a post -it note on each sheet that have
comments. Thanks very much.
Number: 316 Created: 5/30/2008
[5/30/08] Larimer County must review and approve all sheets that show construction
taking place for the offsite Peakview improvements. Please add a county signature
block to the cover sheet and all other appropriate sheets.
Page 9
when you call out riprap or a sidewalk chase, etc, label with both the detail and sheet
numbers. This would apply to any sheet, not just the grading.
Number: 304 Created: 5/30/2008
[5/30/08] Not enough overlap at matchlines. Please show enough info past the
matchline so that each lot is shown in full on at least one sheet.
Number: 305 Created: 5/30/2008
[5/30/08] Please label all slope ratios.
Number: 306 Created: 5/30/2008
[5/30/08] Please call out all sidewalk culverts referencing detail and sheet number.
Please label all crosspans with dimensions.
Number: 307 Created: 5/30/2008
(5/30/08] Please see the comment under Emergency Access Drive regarding the
grading in this area.
Topic: Utility Plans - Erosion Control Plan
Number: 211 Created: 5/10/2007
[5129/08] Please clearly indicate which, if any, erosion control improvements are to
be done with Phase 1 that are shown in Phase 2's area. There is a note on the
plans stating that there was to be a symbol corresponding to the legend what gets
installed with each phase but there was no symbol provided.
[5/10/07] Please provide an erosion control plan for Phase 2. Currently only
showing a plan for Phase 1.
Number: 312 Created: 5/30/2008
[5/30/08] Please see John Pedas regarding scanning requirements.
Number: 313 Created: 5/30/2008
[5/30/08] Not enough overlap at matchlines.
Topic: Utility Plans - General
Number: 209 Created: 5/10/2007
[5/28/08] Please resubmit the variance request to clearly state each location where
the minimum cover requirements are not being met along with the proposed depth.
The utility plans need to dimension the depth from top of pipe to finish grade on the
applicable plan and profile sheet. Each location can then be evaluated, approved,
approved with conditions or denied. The updated variance along with all affected
plan and profile sheets can be turned in prior to the next submittal for our review and
approval so that we don't have to waste another round of review on this issue.
[5/10/07] Minimum cover requirements are not being met per section 12.2.2. 1 did
not review the plan and profile sheets in any detail as the grades will probably
change with the next submittal to fix the cover problem.
Page 8
Topic: Utility Plans - Cover Sheet
Number: 296 Created: 5/30/2008
[5/30/08] Please see redlines on cover sheet. This is an extremely large set of
plans so it is very important that the sheets be ordered in a logical manner. Please
label the grading sheets individually and in order in the index (ie..existing/demo,
master, phasing and then detailed). The drainage plan has been added as sheet 1
of 2 and 2 of 2 on the end of the plan set and labeled as for reference only. If this
information is required to construct this project then it is not for reference only and
needs to be part of the plan set. Also, Phase 1 shown but not Phase 2. Please add
Phase 2. Please remove all sheets that are not part of this project.
Topic: Utility Plans - Cross Sections
Number: 270 Created: 5/10/2007
[5/30/08] Your response indicates that you have labeled and shown this information
as "typical" in one section, which is fine, but remaining cross sections still need to
show the UE lineweight and label. No need to dimension as the typical cross
section has done so. Please include all offsite easements where necessary on the
cross section so that it is clear that the proposed work is being completed within the
easement.
[5/10/07] Dim roadway width and UE.
Number: 272 Created: 5/10/2007
[5/29/08] Some sections have been updated but some have not. Some sections are
still missing slope info completely.
[5/10/07] Label all slopes to row as a ratio, not percent.
Number: 329 Created: 5/30/2008
[5/30/08] Future sidewalks must still be fully designed and shown in the cross
sections... just label as future. ,
Number: 330 Created: 5/30/2008
[5/30/08] Cross sections are still incomplete. Will review and comment in detail
when all information is shown.
Topic: Utility Plans - Demo Sheet
Number: 267 Created: 5/10/2007
[5/29/08] The demo sheet seems to be missing with this submittal. Demo or
existing conditions sheets are added from another unrelated project. ?
[5/10/07] Please provide the city's street cut note on the demo sheets.
Topic: Utility Plans - Detailed Grading Plan
Number: 221 Created: 5/10/2007
[5/28/08] The sheet called out for the swale sections do not have the detail
promised. Please correct on each sheet.
[5/10/07] Comment #218 applies to these sheets as well. Also, anytime something
is labeled with "see detail xx" then you need to refer to the sheet it appears on. Or
Page 7
Number: 331 Created: 6/2/2008
[6/2/08] From Technical Services:
1. Boundary and legal close.
2. Name of Plat is inconsistent. Make sure it matches the "name" in the dedication
statement.
3. Plat needs a note as to what are the permitted uses in the wetland buffer.
4. Street Names: Hawker and Katana are no good per PFA.
Topic: Site Plan
Number: 281 Created: 5/10/2007
[5/28/08] [5/10/07] See comments under other sections that will affect this plan set.
Please coordinate with the other plan sets so that everything matches.
Number: 282 Created: 5/10/2007
[5/28/08] Minor scanning issues this time, please remove the shading within the
sight distance easement and correct all line over text. See redlines. You might want
to meet with John Pedas in Tech Services - one of the pen widths seems pretty thick
on the smaller font and I'm not sure it will scan.
[5/10/07] Scanning continues to be a thorn for you, I know, but we'll work through it.
Just need to get the plan sets scannable by mylars.
Number: 291 Created: 5/28/2008
[5/28/08] There is an easement missing on sheet 2 at the north end of Navion Lane
up to the RR tracks. There are lots of easements shown on the subsequent sheets
that are not labeled.
Number: 292 Created: 5/28/2008
[5/28/08] The all weather drive on the east side of Yeager is shown as "future" but
the temp turnaround is not shown. Please show the interim condition as well.
Please correct the site plan to match the utility plans.
Topic: Utility Plans
Number: 43 Created: 4/20/2005
[5/29/08] The wrong detail has been used. Please remove 709 and use details
D10, D11, D12 or D13 as appropriate, call out which detail and sheet at each
location a sidewalk culvert is used on both the grading and street P&Ps. Please
design all chases in accordance with the correct detail - those shown are too close
to the curb returns.
[4/12/07] [11/22/05] Final Compliance - call out the appropriate detail for the
sidewalk culverts from the alley to the street (D10-13) on sheet xx.
[812/05] No more than 500sf of surface area may drain over a public sidewalk.
[4/20/05] Will need sidewalk culverts at all Alley intersections to take the drainage
out to the street. Cannot drain over sidewalk.
Page 6
Topic: Plat
Number: 204 Created: 5/10/2007
[5/28/08] Please remove all zoning information from the tract table. Please include
who owns and maintains the private easements.
[5/10/07] Please provide a tract table listing who owns and maintains all tracts and
private easements. Need to state what each of the tracts are being dedicated for as
well.
Number: 205 Created: 5/10/2007
[5/28/08] [5/10/07] Please see comments under other sections as some of them will
effect the plat.
Number: 206 Created: 5/10/2007
[5/28/08] (5/10/07] Please see Appendix E6 for all scanning requirements.
Number: 214 Created: 5/10/2007
[5/30/08] [5/10/07] See redlines for other comments.
Number: 216 Created: 5/10/2007
[5/28/08] [5/10/07] Please provide a copy of all easements dedicated by separate
document and label them on the plat with the reception numbers.
Number: 298 Created: 5/30/2008
[5/30/08] Note 4 does not match the tract table. Please correct.
Number: 299 Created: 5/30/2008
[5/30/08] Please define Landscape Buffer and Park Easement.
Number: 300 Created: 5/30/2008
[5/30/08] Please correct the misspelling in Note 7.
Number: 301 Created: 5/30/2008
[5/30/08] Depending on the timing of the city's purchase of the park area, the city
may or may not need to sign off as an owner. If this plat is recorded prior to the
transfer of the property to the city, then the city will not have to sign. If the property
transfers after, then the city will have to sign.
Number: 302 Created: 5/30/2008
[5/30/08] Please spell out all abbreviations or provide a legend that lists and defines
them.
Number: 303 Created: 5/30/2008
[5/30/08] Please use hatching to indicate what is being vacated on sheet 9 & 10 as
shading does not meet our scanning requirements (because it does not scan).
Page 5
just the larger volume streets. I strongly suggest doing this as it will also help with
the scannibility of the plan sets.
[5/9/07] Street stubs to the south will require barricades AND a sign clearly stating
that this street is to connect through so that there will be no misunderstandings with
the future residents.
Number: 295 Created: 5/28/2008
[5/28/08] All street naming issues must be resolved and the plan sets updated prior
to the next submittal. We cannot let this issue linger until mylars as there are too
many sheets that are affected and there is a huge potential that the mylars may not
be correct at mylars. I would hate to have to reject them.
Number: 309 Created: 5/30/2008
[5/30/08] There is a new 12' all-weather road shown on the south sides of the lots
that are on the south side of Crusader. No lots may take access off this drive unless
it is paved as a private drive or built to public alley standards. If you decide to not
pave it, then a note must be clearly labeled on the site, landscape and utility plans
stating this restriction so that future homeowners and builders are aware of it.
Topic: Landscape Plans
Number: 91 Created: 4/25/2005
[5/28/08] Please remove the shading within the sight distance easement for
scannability.
[5/9/07] There are still scanning issues with the plan set. Some lineweights are very
light and probably won't scan. Other lineweights are "fuzzy" and probably won't
scan well either. Please see JR in Tech Services if you have any questions.
[11/22/05] Final Compliance - the plans look much better but it wouldn't hurt to meet
with JR in Tech Services before going to mylar when we're ready for that.
[8/5/05] [4/25/05] Please see Appendix E6 for scanning requirements. These
sheets will not scan well and will not be accepted.
Number: 280 Created: 5/10/2007
[5/29/08] [5/10/07] See comments under other sections that will affect this plan set.
Please coordinate with the other plan sets so that everything matches.
Number: 293 Created: 5/28/2008
(5/28/08] Please label all easements.
Number: 294 Created: 5/28/2008
[5/28/08] Sheet 6 has labeled a hatched area representing a 20' landscape clear
zone for future regional detention pond outlet yet no hatched area is shown. Please
clarify.
Page 4
of roadway adjacent to buildable lots will need to be constructed in accordance with
Section 24-95 of the City Code and Section 3.3.2(D)(6) of the Land Use Code.
Estimates for the escrow amounts must be submitted by a license professional
engineer for the City's review and approval and those amounts will be added into the
Development Agreement.
[4/20/05] This development is responsible for the design and construction of
International along its frontage. Need an interim and ultimate design for your street
stubs to it. Will need to provide an estimate for the construction of the street stubs to
the property line for our review and approval. That amount will go into the DA.
Number: 35 Created: 4/20/2005
[5/28/08] 1 have asked that John Pedas in Tech Services be routed all plan sets on
the next submittal for his review as there are still scanning issues with the plan set.
[4/12/07] Still have some problems with overlapping text on the utility plans... I've
highlighted most of it in pink so you can see where the problems are. Some of the
spot elevations were hard to read and because the street elevation may change due
to minimum cover issues over the utilities, thought I would hold off on reviewing the
spot elevations until the next round.
[11/22/05] Final Compliance. Please see E6 and visit with JR in Tech Services to
discuss the scannability of the plan sets.
[8/2/05] [4/20/05] See Appendix E6 for all scanning requirements.
Number: 143 Created: 11/22/2005
[5/28/08] Please see Transportation Planning regarding the TIS and ped los. There
are several areas that may not meet ped level of service requirements in the interim
and will require temp asphalt sidewalks until the permanent concrete sidewalks are
installed with future development. In areas that can remain without sidewalks
installed, type III barricades are required where all permanent sidewalks terminate.
All plan sets must clearly label interim and ultimate - as it stands right now, it is not
clear where sidewalks are beginning and ending.
[5/9/07] [11/22/05] Final Compliance - We don't want the sidewalks and street trees
installed along any undeveloped tract and in FC, we'll want the various plan sets to
be clearly labeled as such and we'll need an estimate for the uninstalled items for
our review and approval. Once agreed upon, that amount will need to go in the DA
and escrowed prior to the first building permit.
For phasing within the developed areas, we'll want both sides of the street fully
constructed, including landscaping and sidewalks. Please adjust your phase lines to
show that.
Number: 203 Created: 5/9/2007
[5/29/08] The signage plan was combined with the plan and profile sheets making it
difficult to see the project as a whole. Transportation Planning and Traffic
Engineering may require that this information be presented on a separate striping
and signage plan for all local streets instead of only providing separate sheets for
Page 3
Topic: Utility Plans - Sanitary Sewer/International Blvd P&P
Number: 289 Created: 5/27/2008
[5/27/08] Randy Siddens of the Boxelder Sanitation District indicated that they
have no major issues. Please see the red -lined plans and comment letters from the
district.
Topic: Utility Plans - Water Line Plan & Profiles
Number: 287 Created: 5/27/2008
[5/27/08] Darwin Williams of the East Larimer County Water District (ELCO)
indicated that their comments are being made on red -lined utility plans being
returned to the developer's engineer.
Department: Engineering Issue Contact: Susan Joy
Topic: Barker Agreement
Number: 308 Created: 5/30/2008
[5/30/08] The Barker agreement needs to be recorded and the reception number
placed on the plan sets. Please provide Engineering with a fully signed and
executed agreement prior to the final signing of mylars.
Number: 315 Created: 5/30/2008
[5/30/08] The Barker agreement must include all necessary easements to construct
the berm and be recorded. Please label the reception number on all sheets where
this area is shown. If the agreement does not contain the easements necessary to
construct the improvements shown, then separate easements by separate document
must be dedicated and recorded. Please provide copies if separate easements are
required.
Please provide Basil Hamdan in Stormwater a copy of the easement for his review.
There may be additional easements required by Stormwater that must be dedicated
to the City and may not be covered under this agreement.
Topic: General
Number: 25 Created: 4/20/2005
[5/28/08] (4/12/07] [11/17/05] Just keeping the comment open through Final
Compliance.
[8/2/05] The City agrees that the developer can provide an escrow for the cost of
final design and construction of that portion of International Blvd from its SE corner
west to a point representing the easternmost 1/3 of the wetland. The developer will
be given the option to credit this cost against the payment from the City for
Timberline ROW costs. The developer does not need to provide a final design for
this roadway at this time, but does need to provide a preliminary design of this
roadway so that drainage patterns and roadway grades for the three street stubs
that tie into International Blvd will be accommodated. The city also agrees that the
developer shall provide interim and ultimate designs for the three street stubs to
International Blvd and escrow the costs to construct the portion of the roadways that
will not be constructed with the development. It needs to be clarified that the portion
Page 2
STAFF PROJECT REVIEW
Cityof Fort Collins
Jim Sell Design, Inc. Date: 6/4/2008
c/o Matt Blakely
153 West Mountain Avenue
Fort Collins, CO 80524
Staff has reviewed your submittal for EAST RIDGE, FINAL PLANS — TYPE 1, and
we offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Steve Olt
Topic: General
Number: 286 Created: 5/27/2008
[5/27/08] Craig Foreman of Parks Planning indicated that they have no problems
with this current submittal for the East Ridge - Final Plans.
Number: 332 Created: 6/4/2008
[6/4/08] See red -lined Site & Landscape Plans from Current Planning that contain
some minor comments.
Department: Current Planning Issue Contact: Dana Leavitt
Topic: Grading Plan
Number: 181 Created: 4/5/2007
[5/27/08] LOD incorrectly labeled. Revise to read "Limit of Development."
[4/5/07] Show Limits of Development on Grading Plans, Erosion Control Plans and
Phasing Plans.
Topic: Site Plan
Number: 182 Created: 4/5/2007
[5/27/08] LOD incorrectly labeled.
[4/5/07] show Limits of Development on Site Plans.
Topic: Utility Plans
Number: 183 Created: 4/5/2007
[5/27/08] Not shown on plans. Can be added to General Conditions &
Specifications Sheet, if desired.
[4/5/07] Add notes to Grading and Erosion Control Notes: Stockpiling of wetland
soils per the Wetland Mitigation Report. Include a maximum height of stockpiles.
Department: Current Planning Issue Contact: Steve Olt
Topic: Utility Plans -General
Number: 288 Created: 5/27/2008
[5/27/08] Don Kapperman of Comcast Cable TV indicated that they have no
problems with this current submittal for the East Ridge - Final Plans.