HomeMy WebLinkAboutEAST RIDGE - FDP - 33-98F - CORRESPONDENCE - SUBDIVISION PLAT (6)Page 2 of 2
sheri
Sheri Langenberger, P.E.
Engineering Development Review Manager
City of Fort Collins, Engineering Dept
970-221-6605
file://C:\Documents and Settings\solt\Local Settings\Temp\GW)00001.HTM 7/13/2009
Page 1 of 2
Steve Olt - RE: Plat note
From: "Keith Sheaffer" <ksheaffer@tstinc.com>
To: "Sheri Langenberger" <slangenberger@fcgov.com>, "Susan Joy" <sjoy@fcgov.com>,
"Steve Olt" <SOLT@fcgov.com>, 'Ryan Banning" <rbanning@tstinc.com>
Date: 7/13/2009 12:18 PM
Subject: RE: Plat note
CC: <Yontahey@aol.com>, "Steve Dush" <SDush@fcgov.com>, 'Brian W"
<brianw@jimselldesign.com>, <TTTi@msn.com>, "Steve Humann"
<shumann@tstinc.com>
Sheri,
Thank you for getting this to us, we are going to review this and get you the plat ASAP
Respectfully,
TST, INC.
Keith G. Sheaffer, PE
748 Whalers Way
Fort Collins, CO 80525
970.226.0557
970.226.0204 fax
www.tstinc.com
This file(s) contains electronic horizontal and/or vertical design information, which has been used by TST, Inc., in the formulation of final development
and/or construction documents. This electronic information may be used exclusively by the parry designated on the attached transmittal letter for
information purposes only. By receiving this electronic information, the receiver agrees that this data may not be transferred to any other party, that
this electronic information may not necessarily represent the information shown on the recorded or approved final development and/or construction
documents, and that the receiver is responsible for verifying the information contained within the electronic data against the recorded or approved
documents.
From: Sheri Langenberger [mailto:slangenberger@fcgov.com]
Sent: Monday, July 13, 2009 12:15 PM
To: Susan Joy; Steve Olt; Keith Sheaffer; Ryan Banning
Cc: Yontahey@aol.com; Steve Dush; Brian W; TTTi@msn.com; Steve Humann
Subject: Plat note
All
Here is the note that Paul put together needs to get placed on the plat addressing the AB line. It can be hand
written on it. Susan is finishing the formatting of the DA and will get that sent out very soon.
The Anheuser-Busch force -main and private easement shown within the public right-of-way of Delozier Road
must be vacated and the line relocated with Phase 2. The line shall be removed or abandoned in accordance
with City standards and the easement vacated prior to the construction of Delozier Road. No application for the
issuance of any Development Construction Permit regarding Phase 1 or Phase 2 shall be accepted nor shall any
Development Construction Permit be issued regarding Phase 1 or Phase 2 until the conveyance of the new
easement has occurred. No application for the issuance of any Development Construction Permit regarding
Phase 2 shall be accepted nor shall any Development Construction Permit be issued until the vacation of the
existing easement has occurred and the Anheuser-Busch force -main has been moved into the newly acquired
easement, except that a Development Construction Permit may be applied for by the Developer and issued by
the City for the singular purpose of relocating the Anheuser-Busch force -main. See paragraph II(D)(11) of the
Development Agreement.