Loading...
HomeMy WebLinkAboutEAST RIDGE - FDP - 33-98F - CORRESPONDENCE - SUBDIVISION PLAT (6)Page 2 of 2 sheri Sheri Langenberger, P.E. Engineering Development Review Manager City of Fort Collins, Engineering Dept 970-221-6605 file://C:\Documents and Settings\solt\Local Settings\Temp\GW)00001.HTM 7/13/2009 Page 1 of 2 Steve Olt - RE: Plat note From: "Keith Sheaffer" <ksheaffer@tstinc.com> To: "Sheri Langenberger" <slangenberger@fcgov.com>, "Susan Joy" <sjoy@fcgov.com>, "Steve Olt" <SOLT@fcgov.com>, 'Ryan Banning" <rbanning@tstinc.com> Date: 7/13/2009 12:18 PM Subject: RE: Plat note CC: <Yontahey@aol.com>, "Steve Dush" <SDush@fcgov.com>, 'Brian W" <brianw@jimselldesign.com>, <TTTi@msn.com>, "Steve Humann" <shumann@tstinc.com> Sheri, Thank you for getting this to us, we are going to review this and get you the plat ASAP Respectfully, TST, INC. Keith G. Sheaffer, PE 748 Whalers Way Fort Collins, CO 80525 970.226.0557 970.226.0204 fax www.tstinc.com This file(s) contains electronic horizontal and/or vertical design information, which has been used by TST, Inc., in the formulation of final development and/or construction documents. This electronic information may be used exclusively by the parry designated on the attached transmittal letter for information purposes only. By receiving this electronic information, the receiver agrees that this data may not be transferred to any other party, that this electronic information may not necessarily represent the information shown on the recorded or approved final development and/or construction documents, and that the receiver is responsible for verifying the information contained within the electronic data against the recorded or approved documents. From: Sheri Langenberger [mailto:slangenberger@fcgov.com] Sent: Monday, July 13, 2009 12:15 PM To: Susan Joy; Steve Olt; Keith Sheaffer; Ryan Banning Cc: Yontahey@aol.com; Steve Dush; Brian W; TTTi@msn.com; Steve Humann Subject: Plat note All Here is the note that Paul put together needs to get placed on the plat addressing the AB line. It can be hand written on it. Susan is finishing the formatting of the DA and will get that sent out very soon. The Anheuser-Busch force -main and private easement shown within the public right-of-way of Delozier Road must be vacated and the line relocated with Phase 2. The line shall be removed or abandoned in accordance with City standards and the easement vacated prior to the construction of Delozier Road. No application for the issuance of any Development Construction Permit regarding Phase 1 or Phase 2 shall be accepted nor shall any Development Construction Permit be issued regarding Phase 1 or Phase 2 until the conveyance of the new easement has occurred. No application for the issuance of any Development Construction Permit regarding Phase 2 shall be accepted nor shall any Development Construction Permit be issued until the vacation of the existing easement has occurred and the Anheuser-Busch force -main has been moved into the newly acquired easement, except that a Development Construction Permit may be applied for by the Developer and issued by the City for the singular purpose of relocating the Anheuser-Busch force -main. See paragraph II(D)(11) of the Development Agreement. file:/ ADocuments and Settings\solt\Local Settings\Temp\GW}0000l.HTM 7/13/2009