HomeMy WebLinkAboutRIDGEVIEW CLASSICAL SCHOOL PHASE IV ADDITION - SPAR - 16-01A - CORRESPONDENCE - (9)parking lot lighting may need updated if not already met to LUC standards
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Yours Truly,
Bob Barkeen
City Planner
Page 4
Department: Transportation Planning Issue Contact: TQn Reiff
Number: 17 Created: 6/5/2001
Student pick-up and drop-off will not be permitted along Lemay or Stuart St.
Number: 18 Created: 6/5/2001
Create a more defined pick-up and drop-off location within the site by perhaps
eliminating some of the parking near the entrance (see red lines), This would improve
vehicular circulation and the safety of the children.
Number: 19 Created: 6/5/2001
Transportation Impact Study is required
Number: 20 Created: 6/5/2001
If a classroom is built near the northeast corner a defined walkway for students and staff
to access the main building is necessary (see red lines).
Number: 21 Created: 6/5/2001
Locate bike parking near the building's main entrance with a ramp for accessibility.
Number: 22 Created: 6/5/2001
Increase the attached sidewalk width along Stuart to a minimum of 6-feet for fronting
property.
Number: 23 Created: 6/5/2001
Sidewalk connections from Stuart and Lemay to the building's main entrance is required
(see red lines).
Department: Water Wastewater Issue Contact: Jeff Hill
Number: 8 Created: 6/4/2001
Will new or larger water/sewer services be needed for the proposed addition?
Number: 9 Created: 6/4/2001
Show and label all existing and proposed water/sewer services, curb stops, meter pits,
etc.
Number: 10 Created: 6/4/2001
Will proposed temporary office and class room need water or sewer services?
Department: Zoning Issue Contact: Gary Lopez 6 C
Number: 1 Created: 6/4/2001
show in more detail on overall site plan location of school, and other features
Number: 2 Created: 6/4/2001
add'I landscaping in parking lot required - some missing in islands `
Number: 3 Created: 6/4/200�1�c, C
any elevations on the additions?
Number: 4 Created: 6/4/2001 ((
Page 3 C
/� �� may,,.. � r �i,�Q/� u • � J �� ' �`"
I� \
w^
a3u
Number: 44 Created: 2/7/2002
An excavation and Inspection fee will be required. Contact City Chief Construction Inspector Lance Newlin for permit
and fee at 970. 221-6605
Department: Natural Resources Issue Contact: Doug Moore
Number: 27 Created: 6/6/2001
Please incorporate recycling -
Please try to design trash enclosures or collection area to provide adequate space
for recycling services. (This is a request not a requirement.)
Department: PFA
Number: 13
ACCESS
A fire lane may be required
Issue Contact: Ron Gonzales
Created: 6/5/2001
Number: 14 Created: 6/5/2001
WATER SUPPLY
A hydrant is required within 300 feet of the building; on 600 ft centers
Fire flow = 1500 gpm @ 20 psi
Number: 15 Created: 6/5/2001
ADDRESS
Required to be visible from the street on which you front
minimum 6" numerals on contrasting background
Number: 16 Created: 6/5/2001
FIRE SPRINKLERS
This change of occupancy will likely prompt a sprinkler requirement for the entire
building.
Department: Police Issue Contact: Joseph Gerdom
Number: 24 Created: 6/5/2001
Lighting: clarify type and location of parking lot and building entrance lighting.
Department: Stormwater Utility
Number: 7
Drainage Requirements
Issue Contact: Wes Lamarque
Created: 6/4/2001
The City of Fort Collins requires all development projects, new or modifications to
existing, creating an additional impervious area of 350 SF or more to provide a storm
drainage design per the City's Storm Drainage Design Criteria Manua[. This needs to
include grading and drainage plans, as well as a drainage report.
Department: Traffic Operations Issue Contact: Eric Bracke
Topic: Traffic
Number: 45 Created: 2/26/2004
[2/26/04] A Transportation Impact Study is currently being conducted for the proposed development. The study
parameters have been modified to address the current problems we are experiencing at the school. These problems
include backups into NB Lemay during pick up and drop off times as well as the general confusion of drivers at the
Stuart Street entrance/exit. Part of the study will look at using Stuart Street, east of the driveways as part of the drop off
area for the older students. The study will also address the access on Lemay as part of the entering circulation. The
study is also going to address the addition of phases 3 and 7 at the signal of Lemay and Stuart.
Page 2
ZA
STAFF PROJECT REVIEW
Cilvof Fort Collins
POUDRE SCHOOL DISTRICT r y Date: 03/09/2004
2407 LAPORTE AVENUE
FORT COLLINS, CO 80521
Staff has reviewed your submittal for RIDGEVIEW CLASSICAL SCHOOL SITE PLAN
ADVISORY REVIEW #16-01, and we offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Bob Barkeen
Topic: Traffic
Number: 46 Created: 3/9/2004
[3/9/041 Can the trash dumpster off of Lemay Ave be included within a trash enclosure?
Number: 47 Created: 3/9/2004
[3/9/04] A neighborhood meeting has been scheduled for March 22, 6:30 pm, at the Ridgeview School.
Department: Engineering Issue Contact: Dave Stringer
Number: 11 Created: 6/4/2001 Stringer -.:-,,
No class rooms to be in public rights -of -way l
Number: 12 Created: 6/4/2001 �J
1 only received a site plan that shows trees, parking lots and buildings. No other ��� Assu��,,urzt�S
underground or below grade features shown c� r z94� • ; w �k�
Topic: stormwater pond
Number: 37 Created: 2/7/2002
Our records do not show the existing outfall system on Lemay Avenue. This connection never received City approval
Number: 38 Created: 2/7/2002 " ,1
private maintained drainage facilities are not allowed in Public rights -of -way. Remove all areas of pond within R.O.W.
Number: 39 Created: 2/7/2002
Pond as shown right next to sidewalk creates a safety issue for pedestrians and bikes. Need a minimum of 2 feet from
back of sidewalk as a flat area before starting pond wall
Number: 40 Created: 2/7/2002
Any part of pond having a depth greater then 6 inches shall have a curb wall to protect pedestrians and bicyclists from
going into pond
Number:41 Created: 2/7/2002 � c
This pond is being shown in an existing utility easement. Need utility company approval for excavation work that affects ct\cis
cover over their facilities. Contact Excell Energy (gas line) City Light and Power and ATT Broadband (cable TV) for �\
their approval and signatures on plans
Number: 42 Created: 2/7/2002 p,�� Z;k, _ �y
The pond area is to small a scale. Enlarge detail to show what is being proposed.
--GG6`�
Number: 43 Created: 2/7/2002
City Engineer signature is required on these plans. City will not sign off nor will allow construction to start until these
plans until these issues are addressed
Page I