Loading...
HomeMy WebLinkAboutRIDGEVIEW CLASSICAL SCHOOL PHASE IV ADDITION - SPAR - 16-01A - CORRESPONDENCE - (9)parking lot lighting may need updated if not already met to LUC standards Be sure and return all of your redlined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Yours Truly, Bob Barkeen City Planner Page 4 Department: Transportation Planning Issue Contact: TQn Reiff Number: 17 Created: 6/5/2001 Student pick-up and drop-off will not be permitted along Lemay or Stuart St. Number: 18 Created: 6/5/2001 Create a more defined pick-up and drop-off location within the site by perhaps eliminating some of the parking near the entrance (see red lines), This would improve vehicular circulation and the safety of the children. Number: 19 Created: 6/5/2001 Transportation Impact Study is required Number: 20 Created: 6/5/2001 If a classroom is built near the northeast corner a defined walkway for students and staff to access the main building is necessary (see red lines). Number: 21 Created: 6/5/2001 Locate bike parking near the building's main entrance with a ramp for accessibility. Number: 22 Created: 6/5/2001 Increase the attached sidewalk width along Stuart to a minimum of 6-feet for fronting property. Number: 23 Created: 6/5/2001 Sidewalk connections from Stuart and Lemay to the building's main entrance is required (see red lines). Department: Water Wastewater Issue Contact: Jeff Hill Number: 8 Created: 6/4/2001 Will new or larger water/sewer services be needed for the proposed addition? Number: 9 Created: 6/4/2001 Show and label all existing and proposed water/sewer services, curb stops, meter pits, etc. Number: 10 Created: 6/4/2001 Will proposed temporary office and class room need water or sewer services? Department: Zoning Issue Contact: Gary Lopez 6 C Number: 1 Created: 6/4/2001 show in more detail on overall site plan location of school, and other features Number: 2 Created: 6/4/2001 add'I landscaping in parking lot required - some missing in islands ` Number: 3 Created: 6/4/200�1�c, C any elevations on the additions? Number: 4 Created: 6/4/2001 (( Page 3 C /� �� may,,.. � r �i,�Q/� u • � J �� ' �`" I� \ w^ a3u Number: 44 Created: 2/7/2002 An excavation and Inspection fee will be required. Contact City Chief Construction Inspector Lance Newlin for permit and fee at 970. 221-6605 Department: Natural Resources Issue Contact: Doug Moore Number: 27 Created: 6/6/2001 Please incorporate recycling - Please try to design trash enclosures or collection area to provide adequate space for recycling services. (This is a request not a requirement.) Department: PFA Number: 13 ACCESS A fire lane may be required Issue Contact: Ron Gonzales Created: 6/5/2001 Number: 14 Created: 6/5/2001 WATER SUPPLY A hydrant is required within 300 feet of the building; on 600 ft centers Fire flow = 1500 gpm @ 20 psi Number: 15 Created: 6/5/2001 ADDRESS Required to be visible from the street on which you front minimum 6" numerals on contrasting background Number: 16 Created: 6/5/2001 FIRE SPRINKLERS This change of occupancy will likely prompt a sprinkler requirement for the entire building. Department: Police Issue Contact: Joseph Gerdom Number: 24 Created: 6/5/2001 Lighting: clarify type and location of parking lot and building entrance lighting. Department: Stormwater Utility Number: 7 Drainage Requirements Issue Contact: Wes Lamarque Created: 6/4/2001 The City of Fort Collins requires all development projects, new or modifications to existing, creating an additional impervious area of 350 SF or more to provide a storm drainage design per the City's Storm Drainage Design Criteria Manua[. This needs to include grading and drainage plans, as well as a drainage report. Department: Traffic Operations Issue Contact: Eric Bracke Topic: Traffic Number: 45 Created: 2/26/2004 [2/26/04] A Transportation Impact Study is currently being conducted for the proposed development. The study parameters have been modified to address the current problems we are experiencing at the school. These problems include backups into NB Lemay during pick up and drop off times as well as the general confusion of drivers at the Stuart Street entrance/exit. Part of the study will look at using Stuart Street, east of the driveways as part of the drop off area for the older students. The study will also address the access on Lemay as part of the entering circulation. The study is also going to address the addition of phases 3 and 7 at the signal of Lemay and Stuart. Page 2 ZA STAFF PROJECT REVIEW Cilvof Fort Collins POUDRE SCHOOL DISTRICT r y Date: 03/09/2004 2407 LAPORTE AVENUE FORT COLLINS, CO 80521 Staff has reviewed your submittal for RIDGEVIEW CLASSICAL SCHOOL SITE PLAN ADVISORY REVIEW #16-01, and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Bob Barkeen Topic: Traffic Number: 46 Created: 3/9/2004 [3/9/041 Can the trash dumpster off of Lemay Ave be included within a trash enclosure? Number: 47 Created: 3/9/2004 [3/9/04] A neighborhood meeting has been scheduled for March 22, 6:30 pm, at the Ridgeview School. Department: Engineering Issue Contact: Dave Stringer Number: 11 Created: 6/4/2001 Stringer -.:-,, No class rooms to be in public rights -of -way l Number: 12 Created: 6/4/2001 �J 1 only received a site plan that shows trees, parking lots and buildings. No other ��� Assu��,,urzt�S underground or below grade features shown c� r z94� • ; w �k� Topic: stormwater pond Number: 37 Created: 2/7/2002 Our records do not show the existing outfall system on Lemay Avenue. This connection never received City approval Number: 38 Created: 2/7/2002 " ,1 private maintained drainage facilities are not allowed in Public rights -of -way. Remove all areas of pond within R.O.W. Number: 39 Created: 2/7/2002 Pond as shown right next to sidewalk creates a safety issue for pedestrians and bikes. Need a minimum of 2 feet from back of sidewalk as a flat area before starting pond wall Number: 40 Created: 2/7/2002 Any part of pond having a depth greater then 6 inches shall have a curb wall to protect pedestrians and bicyclists from going into pond Number:41 Created: 2/7/2002 � c This pond is being shown in an existing utility easement. Need utility company approval for excavation work that affects ct\cis cover over their facilities. Contact Excell Energy (gas line) City Light and Power and ATT Broadband (cable TV) for �\ their approval and signatures on plans Number: 42 Created: 2/7/2002 p,�� Z;k, _ �y The pond area is to small a scale. Enlarge detail to show what is being proposed. --GG6`� Number: 43 Created: 2/7/2002 City Engineer signature is required on these plans. City will not sign off nor will allow construction to start until these plans until these issues are addressed Page I