To: Jon Prouty
Lagonitas Conrpanics
From: Michael A. Chavez
Fire Protection Technician
Fire Prevention Bureau
102 Remb4con Street
Fort Collins, CO 80524
Phone: 970-221-6570
Fare 970-221-6635
Internet. www.poudre-fze.org
Re: Fire Lane and Fire Hydrant placement for Manhattan Project
Date: June 24, 2005
Jon,
11ank you for taking the time to meet with both Ron Gonzales and myself this mooting.
Jon. I sincerely appreciate and value our working relationship as well as our personal
relationship. I just wanted to confirm with you the subjects we discussed this morning.
1 The firelane shall have a width of 28', excluding the drive behind Building
Envelope 1.
2 One fire hydrant shall be located on the North entrance and Manhattan and the
second fire hydrant shall be located at the intersection of the fire lanes off the
South entrance.
3 The fire lane shall be platted as an "F,mergency Access Easement" on the final
plaL
If you have any questions or further concerns regarding this project or any other project
please feel free to give me a call.
Sincerely, /
ichael A. Chavez
Fire Protection Technician
Poudre Fire Authority
(970)416-2969
Current Planning: done
Thank you for your assistance with this project.
Best regards.
Jo
JP/ksr
3944 JFK Parkway, 12E, Fort Collins, CO 80525 • (970) 226-5000 • Fax (970) 226-5125
of that nature. Surface will be grass pavers. Curb will be rollover curb.
North access is for the same purposes as described above as well as Stormwater
access to check manholes for City owned property. Rollover curbs provided.
11: Done
71: Done
128: Done
129: Done
105: Done
139: Done
140: Done
81: Construction of bike pedestrian path connection to Mason corridor will be in
connection with this project. Construction and cost of constructing same will be
same as project. Maintenance will be by Stormwater as it is located on their
property and further, that this is per our agreement of same to the City.
137: Eliminated
78: Done
16: Done
77: Proposed gas and electric mains have been labeled. Separate irrigation
taps will not be necessary for this project as the irrigation taps for buildings will be
used for the same.
141: Done
142: Done
Fire Authority: done
Wastewater: done
Light and Power: done
Transportation Planning: done
3944 JFK Parkway, 12E, Fort Collins, CO 80525 • (970) 226-5000 • Fax (970) 226-5125
127: Maintenance access on south side will be grass pavers, a hard surface
so landscape isn't damaged by trucks driving over
111: Done
133: Done
134: Done
135: Done
136: Done
98: Acknowledged
135: Done
119: Done
120: N/A, as the City already owns this property and doesn't need easement for the trail
connection
121: Done
122: Done
123: Done
124: Done
85: Done
138: Eliminated
88: Overlap labeling has been eliminated. Shading has been eliminated.
107: Done
108: Done
112: Done
113: Done
114: Maintenance access easement at south end of property is for Stormwater to
access property for purposes of cutting grass and other Stormwater maintenance
3944 JFK Parkway, 12E, Fort Collins, CO 80525 • (970) 226-5000 • Fax (970) 226-5125
To:
Steve Olt
From:
Jon Prouty
Date:
June 10, 2005
Re:
New Comments,
In response to the comments and concerns addressed on June 8:
143: Complied with
110: Acknowledged
132: Complied with
35: Dedicated as requested and Poudre Fire request complied with (see attached letter)
87: Building envelopes eliminated
90: Design and construction of Mason Street Trail Connection will be done by City
project, construction being in conjunction with Stormwater's expansion of the
detention pond. Development agreement to include escrow for constructing same
prior to issuance of first certificate of occupancy.
109: Complied with
118: Removed, relocated on City owned detention property
93: Complied with
116: Done
117: Complied with
131: Done
86: Done
125: Done
126: Done