Loading...
HomeMy WebLinkAboutMANHATTAN TOWNHOMES - FDP - 34-04/A - CORRESPONDENCE - (19)Ual Z7/ZUUJ AUDI 14:41 rAA qJ wu vv. . tr1i To: Jon Prouty Lagonitas Conrpanics From: Michael A. Chavez Fire Protection Technician Fire Prevention Bureau 102 Remb4con Street Fort Collins, CO 80524 Phone: 970-221-6570 Fare 970-221-6635 Internet. www.poudre-fze.org Re: Fire Lane and Fire Hydrant placement for Manhattan Project Date: June 24, 2005 Jon, 11ank you for taking the time to meet with both Ron Gonzales and myself this mooting. Jon. I sincerely appreciate and value our working relationship as well as our personal relationship. I just wanted to confirm with you the subjects we discussed this morning. 1 The firelane shall have a width of 28', excluding the drive behind Building Envelope 1. 2 One fire hydrant shall be located on the North entrance and Manhattan and the second fire hydrant shall be located at the intersection of the fire lanes off the South entrance. 3 The fire lane shall be platted as an "F,mergency Access Easement" on the final plaL If you have any questions or further concerns regarding this project or any other project please feel free to give me a call. Sincerely, / ichael A. Chavez Fire Protection Technician Poudre Fire Authority (970)416-2969 Current Planning: done Thank you for your assistance with this project. Best regards. Jo JP/ksr 3944 JFK Parkway, 12E, Fort Collins, CO 80525 • (970) 226-5000 • Fax (970) 226-5125 of that nature. Surface will be grass pavers. Curb will be rollover curb. North access is for the same purposes as described above as well as Stormwater access to check manholes for City owned property. Rollover curbs provided. 11: Done 71: Done 128: Done 129: Done 105: Done 139: Done 140: Done 81: Construction of bike pedestrian path connection to Mason corridor will be in connection with this project. Construction and cost of constructing same will be same as project. Maintenance will be by Stormwater as it is located on their property and further, that this is per our agreement of same to the City. 137: Eliminated 78: Done 16: Done 77: Proposed gas and electric mains have been labeled. Separate irrigation taps will not be necessary for this project as the irrigation taps for buildings will be used for the same. 141: Done 142: Done Fire Authority: done Wastewater: done Light and Power: done Transportation Planning: done 3944 JFK Parkway, 12E, Fort Collins, CO 80525 • (970) 226-5000 • Fax (970) 226-5125 127: Maintenance access on south side will be grass pavers, a hard surface so landscape isn't damaged by trucks driving over 111: Done 133: Done 134: Done 135: Done 136: Done 98: Acknowledged 135: Done 119: Done 120: N/A, as the City already owns this property and doesn't need easement for the trail connection 121: Done 122: Done 123: Done 124: Done 85: Done 138: Eliminated 88: Overlap labeling has been eliminated. Shading has been eliminated. 107: Done 108: Done 112: Done 113: Done 114: Maintenance access easement at south end of property is for Stormwater to access property for purposes of cutting grass and other Stormwater maintenance 3944 JFK Parkway, 12E, Fort Collins, CO 80525 • (970) 226-5000 • Fax (970) 226-5125 To: Steve Olt From: Jon Prouty Date: June 10, 2005 Re: New Comments, In response to the comments and concerns addressed on June 8: 143: Complied with 110: Acknowledged 132: Complied with 35: Dedicated as requested and Poudre Fire request complied with (see attached letter) 87: Building envelopes eliminated 90: Design and construction of Mason Street Trail Connection will be done by City project, construction being in conjunction with Stormwater's expansion of the detention pond. Development agreement to include escrow for constructing same prior to issuance of first certificate of occupancy. 109: Complied with 118: Removed, relocated on City owned detention property 93: Complied with 116: Done 117: Complied with 131: Done 86: Done 125: Done 126: Done 3944 JFK Parkway, y, Slag 12, Fort Collins, CO 80525 • (970) 226-5000 • Fax (970) 226-5125