HomeMy WebLinkAboutMANHATTAN TOWNHOMES - FDP - 34-04/A - CORRESPONDENCE - (21)Project: 1 r '' � '� I VIr3l 6oyu A Date: 3
Planner: ��� Traffic Operations: Engineer:
Items Requested
Redlinedems Being Returned
;,,
c
m
a
?
N
1O "
0
Other Items Required
w
�
J
a
j
Q,
Cn
Y
0
Other Items.bein
Returned 9
Engineeringj
1
Stormwater
1
Water/Wastewater/FCLW D
Traffic Operations
.Transportation Planning(
1
Transfort
Engineering Pvmt.
Light & Power
X
x
Technical Services
PFA
U.h. �p '
TOTALS
U
Other.
Note: All redlined items should be returned with the resubmittaI/revisions:
Please call 221-6750 to schedule a resubmittal
appointment,
If you have any questions regarding these issues or any other issues related to
this project, please feel free to call me at 221-6341.
Yours Truly,
AutaR-
Steve Olt
City Planner
cc: Susan Joy
VF Ripley Associates
North Star Design
R.J.L. Surveys
Current Planning File #34-04A
Page 11
the development agreement. In addition, there needs to be a 20 foot wide
public access easement dedicated where the future trail connection will be
made reflected on the plat. Please strike the wording "Future Connection to
Mason Street Corridor Shown for information only" from the utility plans. The
connection is a required part of this project and will be designed and paid for as
part of this development application. Construction of this connection will take
place either in conjunction with the planned storm water improvements on this
site or in conjunction with the construction of the Mason Transportation
Corridor multi -use trail project.
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: Genera/
Number: 16 Created: 10/4/2004
[8/17/051
w
[6/9/05]
[12/9/04]
[10/4/04] Maintain the required landscape/utility separation distances on the
landscape plans.
Department: Water Wastewater
Topic: Landscape
Number: 158
Issue Contact: Roger Buffington
Created: 8/17/2005
[8/17/05] There are two trees in the south half of the project that do not
meet separation distances from water services and a fire hydrant. Jeff has
also -been commenting on landscape separations on previous rounds of review.
This completes staff (and outside reviewing agencies) review and comments at
this time. Additional comments and red -lined plans may be forthcoming. Another
round of staff review is determined to be necessary. This proposal is subject, ---
to the 90-day revision re -submittal requirement (from the date of this::. .
comment letter, being August 23, 2005) as set forth in Section 2.2.11(A).
of the Land Use Code. Be sure and return all of your red -lined plans when you
re -submit. The number of copies of each document to re -submit is shown on the
attached Revisions Routing Sheet.
Page 10
Department: Stormwater Utility Issue Contact: Wes Lamarque
Topic: Stormwater
Number: 160 Created: 8/17/2005
[8/17/05] Please explain in the text of the report why the size of 10 feet was
used for the proposed 10-foot inlet.
Number. 161 Created: 8/17/2005
[8/17/05) Please revise spot elevations in the lower southeast corner of the
site. See redlined plans.
Topic: Stormwater Erosion Control
Number: 170 Created: 8/22/2005
(8/22/05]
1. The plan indicates grading/pipeline/riprap work outside the limits of the
silt fencing on the south side of the project. Straw bales are shown here
as well. None of these BMP's will protect the area during your
construction. Please rethink this area.
2. What will protect Manhattan Avenue from the project?
Department: Transportation Planning Issue Contact: David Averill
Topic: Transportation
Number: 78 Created: 12/10/2004
18/16/05J To clarify ... per discussions with the applicant, Stormwater Utility
Staff, and the PM of the Mason Trail project. This project will provide the
escrow for design and construction of the EAST/WEST CONNECTION. The
applicant has agreed to this provision. The north south portion of the trail is a
City Capital_ Project: `The Stormwater detention project design will allow for
the EAST/WEST ' CONNECTION and Mason Trail proper. The EAST/WEST
CONNECTION will`be built when crews are out there building the North/South
Trail, not when the-stormwater detention pond is being built. The applicant's
response letter is simply mis-worded.
[6/8/05] There -doesn't appear to be a wide enough easement shown. Please
revise.
[12/10/04] The proposed connection to the MTC multi -use path (currently
shown as 6' in width) needs to be 8' minimum per LCUASS. This applicant needs
to escrow the money for the trail connection to the Mason Transportation
Corridor multi -use trail as part of this project. This needs to be reflected in
Page 9
[6/7/05] The 10' wide access drive to the north is new. Who is that for? If
it's for Stormwater, please contact Wes Lamarque and if it's for
Water/Wastewater, please contact Jeff Hill for their requirements. Also, the
VC shown where the drive comes out into the drive aisle will need to be changed
to rollover or please provide a drive cut. Please provide all appropriate details.
Department: Light & Power Issue Contact: Rob Irish
Topic: 6enercl
Number: 128 Created: 6/7/2005
[8/16/05]
[6/7/05] Please show all electric facilities on the overall utility plan. You -have
shown a couple of existing electric boxes but we still need to have the existing
electric lines located on the utility plan.
Number: 129 Created: 6/7/2005 ..
[8/16/05] _.
[6/7/05] Coordinate with Light & Power on the placement of the ganged;
electric meters so we won't have conflicts with gas meters.
Topic: Light a Power
Number: 145 Created: 8/16/2005
[8/16/05] Electric line for existing building shown on utility plan is incorrect.
Plan shows the line on the south side of the existing building when in fact it is
on the north side of the building. Have the line located and show -its correct .
location.
Number: 146 Created: 8/16/2005
[8/16/05] Utility plan shows electric running throughout the site along the side
and back of the site behind garages. Light and power will not install: electric --
facilities along the side or rear of the lot.
Number: 147 Created: 8/16/2005
[8/16/05] Utility plan shows electric running to each of the garages; typically
the garages are fed from the main buildings off the house meter. Will there be
electric meters on the garages? If so, they cannot be fed from the rear as
shown. These meters will need to be coordinated with Light & Power.
Page 8
Number: 165 Created: 8/18/2005
[8/18/05) Remove the contours. -
Topic: Utility Plans
Number: 88 Created: 12/10/2004
[8/18/05] Still have some scanning issues. Please see E6 or JR in Tech
Services to go over the plan set.
[6/7/05] Please correct all overlapped labeling.
[12/10/04] I've highlighted as many of the scanning problem areas as I could in
pink highlight (overlapping, min font size, etc). The shading makes the plan sets
very nice to read but unfortunately in doesn't scan at all. Could you use some
sort of hatching instead? We're open to anything but the shading. Scannability
is more of a final compliance issue but wanted to let you know early so that you
can set -your sheets up early in the process.
Number: 108 Created: 6/7/2005
[8/18/05]-Please show how the proposed striping is tying into the existing
-striping. -Can provide a separate striping sheet or expand the information
currently shown on sheet 11.
[6/7/05] Please provide a striping sheet showing the existing striping and how
your striping will tie into it. This will also help clarify comment 107.
Number: 112 Created: 6/7/2005
[8/18/05]- Changing curb types mid block is not allowed because it's hard to mill
and overlay the street later with the varying -gutter pan depths. We might be
able to `make`the north one work if you start the transition a little further
south just after the curb starts to turn. The transition on the south end of the
property needs some adjustment as well. You could either transition the curb
further_=north at the inlet or further south at the other inlet. Take a look at it
Tricia and -let me know what you think.
[6/7/05]�1)etail sheets - Please provide a detail for curb transitions along
Manhattan Avenue.
Number: 115 Created: 6/7/2005
(8/18/05] The 10' access drive is to be constructed .by the developer. Please
provide either typical cross section and a plan and profile OR you can provide
the typical cross section, a curve table for the centerline, and enough spots and
slope information to build it. Which ever way works best for you works for me.
Page 7
Number: 101
[8/18/05] [6/7/05] [12/10/04]
coordinate them with the plot.
Number: 124
Created:12/10/2004
See comments under the other plan sets and
Created:6/7/2005
[8/16/05] [6/7/05] Please update the plot language to our current version. I
can email the document to you if you email me at sjoy@fcgov.com.
Number: 162 Created:.8/18/2005
[8/18/05] From Technical Services: The city now ownsTract2 and will have
to sign the plat.
Number: 163 Created: 8/18/2005
[8/18/05] From Technical Services: Please provide a vicinity map.
Topic: Site
Number: 85 Created: 12/10/2004
(8/16/05] [6/7/05] [12/10/04] Coordinate thecomments, under the other
section and/or plan sets so that all of the plan sets match.
Number: 153
[8/16/05] Remove the utilities.
Created: 8/16/2005
Number: 154 Created: 8/16/2005
[8/16/05] The Mason Street Connection is to be designed.and_built by this
development. Please remove "constructed by the city" - see -redlines..
Number: 155 Created:- 8/16/2005
[8/16/05] 41 units now shown, only 38 went to public_hearing_
Number: 156
Created: .8/16/2005
[8/16/05] Dimension and label all easements. Either spell out or provide a
legend defining all abbreviations. All easements on.Tract 2:need to be labeled
as "alignments". Please make sure this comment gets coordinated with the
other plan sets.
Number: 157
Created: 8/16/2005
[8/16/05] Please dimension all sidewalks as well as the maintenance road.
Page 6
Topic: Overall Utility Pons
Number: 121
Created: 6/7/2005
[8/16/05] Please correct the cover sheet as stated below.
[6/7/05] From Technical Services: Please correct the project title to read
"Manhattan Townhomes" being a replat of ......
This correction needs to be carried out on all plan sets.
Number: 134 Created: 6/7/2005
[8/18/05] [6/7/05] Please dimension all sidewalks. -
Number: 135 Created: 6/7/2005
[8/18/05] [6/7/05] Please station all driveways such that they can be located
in the field. Please provide spot elevations at all PCs.
Number: 167
Created:8/18/2005
[8/18/05] Please see redlines for other comments. The only thing we might
need to look at is making sure that all work being done by the city is clearly
labeled as such and all work being done by the developer (like the maintenance
road) is clearly labeled just so there isn't any confusion later on. Thanks a lot!
Topic: P/ot
Number: 35 Created: 10/5/2004
[8/16/05] Please dimension the emergency access easement on the plat. Needs
-to meet the widths discussed below.
- `[6/7/05] The emergency access drive still hasn't been -dedicated on the plat.
Per the last meeting and agreement with PFA, the 30section will stay as
currently shown and all 24' wide areas shall be 28'.
[12/10/04] I see that you have added the 30' drive aisle (thank you), may need
=- emergency access easements dedicated through the parking lot for PFA. Please
call Ron Gonzales with PFA for his requirements.
[10/5/04] Please see PFA asap for their emergency access requirements.
Three story buildings require a 30' drive aisle.
Number: 98 Created: 12/10/2004
[8/18/05] [6/7/05] [12/10/04] From Technical Services - 8oundary closes.
Page 5
Topic: Grading Sheet
Number: 131
Created:6/7/2005
[8/18/05] [6/7/05] Please provide this statement:
The top of foundation elevations shown are the minimum elevations
required for protection from the 100-year storm.
Number: 168
Created:8/19/2005
[8/19/05] Please provide spot elevations along the towline for at least 20-50'
past any curb you are installing so that I can see how the design will tie into
existing. Also, 0.5% minimum grades are required at the flowline - it doesn't
appear that this requirement is being met.
Number: 169 Created: 8/19/2005
[8/19/05] Sheet 7 and 8 - quick question: Are any type III barricades
required at the property line where the north south portion of the Mason
Street Corridor sidewalk ends at each end of the property or is this all getting
built at once by the city? I'm sure it is, I just haven't gotten. conf i rmation
back from Trans Planning yet, sorry.
Topic: Landscape
Number: 26 Created: 10/5/2004
[8/16/05] (12/10/04] [10/5/04] Show and dimension all easements.
Number: 86 Created: 12/10/2004
[8/16/051 [6/7/05] [12/10/04] Coordinate the comments under the other
section and/or plan sets so that all of the plan sets match.
Number: 126 ..._Created: 6/7/2005
[8/16/05] [6/7/05] Please show all utilities,.&.easements (dimensioned).
Number: 164
[8/18/05] Remove the contours.
Created:8/18/2005
Page 4
Department: Engineering
Topic: 6eneroi
Number: 87
Issue Contact: Susan Joy
Created:12/10/2004
(8/18/05] Please verify that no portion of the garages will encroach into the
EAE (including overhangs).
[6/7/05] The garage building envelopes have shifted into the emergency
access drive and need to be pulled back out of it. No structures or overhangs
are allowed in the EA drive (still needs to be dedicated).
(12/10/04] No structures of any kind (including foundations) are allowed in
easements or in Tract 2. The garage across from bldg 3 appears to be right on
the tract or future property line.
Number: 90 Created: 12/10/2004
[8/18/05] The developer has chosen to pay cash in lieu of constructing the
sidewalk and instead, allow the City to.construct it with the Mason Street Trail
improvements. Please provide an estimate to construct the sidewalk from edge
of Tract 1 to the Mason Street Trail for the City's review and approval. This
amount must be paid prior the issuance of the first building permit and will go -
into the DA as well.
[6/7/05] Per the terms of the sale agreement of the open space/detention
area to the City, this development is responsible for designing and constructing
the Mason Street Trail. Please provide enough information to construct the
trail including a curve table, construction materials, etc. Please see Craig
Foreman with Parks for trail requirements.
[12/10/04] This project is responsible for designing and constructing him
sidewalk connecting to the Mason Street Corridor. Cash in lieu of the actual
construction in the form of an escrowis currently under discussion and hasn't
been decided at this time. Also, the sidewalk needs to be at least 8' wide
where it leaves the parking- lot to` -the east. A public access easement needs to
be dedicated on the plat and shown on all plan sets.
Number: 109 Created: 6/7/2005
[8/18/05] [6/7/05] All plan sets (site, landscape, utility, plat) must, show the
property in its entirety (Tract 1 and 2). All plan sets must present the same
information.
Page 3
Topic: Landscape
Number, 152 Created: 8/16/2005
[8/16/05] How is the necessary off -site landscape easement for the "major. -
walkway spine" along the south side of the property to be dedicated?
Topic: Site
Number: 148 Created: 8/16/2005
[8/16/05] This project has been reviewed and approved for a total of 38
dwelling units (standard & handicapped accessible in the existing and new
buildings), per the Administrative Hearing Officer's decision on the Project
Development Plan (POP) dated January 14, 2005. The original Final Compliance
Plan submittal also had a total of 38 dwelling units in the 6 buildings (existing
and new). Therefore, the City can approve the final plans for only a total of 38
dwelling units unless the applicant wants to take the development plan back to a
public hearing in front of an Administrative hearing Officer as a Major
Amendment to the approved POP.
Number: 149 Created: 8/16/2005
[8/16/051 What is the cross -hatching for in Buildings 2 & 3? The Legend on
the Site Plan does doesn't reflect this.
Number: 150 Created: 8/16/2005
[8/16/05] Please see the Current Planning Department's red -lined Site Plan for
changes that must be made to the plan before recording. There are changes to
the graphic site layout plan and to the Building Information and Parking sections
of the LAND USE STATISTICS.
Number: 151 Created: 8/16/2005
[8/16/05] Is the.City- going to construct the Mason Street Connection of the
trail as shown on the Site Plan?
Page 2
STAFF PROJECT REVIEW
City of Fort Collins
Lagunitas Companies Date: 08/23/2005
c/o Jon Prouty
3944 JFK Parkway #12E
Fort Collins, CO. 80525
Staff has reviewed your submittal for MANHATTAN FINAL COMPLIANCE
PLANS - TYPE 1 (LUC), and we offer the following comments:
ISSUES:
Department: Current Planning
Topic: Elevations
Issue Contact: Steve Olt
Number: 66 Created: 10/12/2004
[8/16/05] This should still be done, although the Final Elevations do not show
masonry on the side elevation. This comment was originally made during the PDP
development review process.
[10/12/04] Masonry should be included on both Side Elevations.
Topic: General
Number: 143
Created:6/10/2005
[8/16/05] Repeat just for reference.
[6/10/05] Carl Jenkins of the United States Postal Service offered the
following response to this development request: .
Mail Service: Centralized delivery of a minimum of 2 centralized box units
(industry type III) required. Revise the plan to show the required CBU
locations as approved by the U.S. Postal Service. In all cases the CBU's
must be located in the public right-of-way or a designated easement. Be
advised that the responsibility of purchase and maintaining the CBU's with
concrete pads is that of the owner/developer/builder/HOA. Prior to
occupancy within the development approved mail receptacles must be in
place. A Delivery Agreement must be in place prior to any delivery of mail.
Please contact Carl Jenkins, Growth Coordinator, U.S. Postal Service, 301
East Boardwalk Drive, Fort Collins, CO., phone # 970-225-4130, cell # ;
970-214-3668,fax # 970-225-4139.