Comment Number: 1 Comment Originated: 04/23/2013
05/28/2013: This is being carried forward as a reminder that it remains an unanswered
question.
04/23/2013: Concerns have been raised regarding the existing 27" sewer in the rear years of
Lots 14 through 21. There is little space between the houses as shown and the easement. This
could preclude the construction of decks on the back of these houses. Please review the
possibility of re-routing this sewer to provide more flexibility for these lots.
Comment Number: 2 Comment Originated: 04/23/2013
05/28/2013: Move the north line of this easement so that it is 15 feet north of the sewer line.
Portions of this line are 16 and 17+ feet deep.
04/23/2013: The easement shown for the existing 27" sewer appears to be shown differently on
the plat and the construction drawings. Please coordinate the two documents.
Department: Zoning
Contact: Noah Beals, 970-416.2313, nbeals fcgov.com
Topic: General
Comment Number: 3 Comment Originated: 04/11/2013
04/11/2013: If Farm animals are not intended to be allowed in this cluster development please
include a note on the site plan indicating this.
If farm animals are desired then the plans need to identify the areas were they are allowed and
how the area is mitigated and buffered from surroundings.
Comment Number: 32 Comment Originated: 04/23/2013
05/29/2013: There are still Tracts that need this reference.
04/23/2013: Please add reference to Note #6 with all Tracts on sheet 2. See redlines.
Comment Number: 37 Comment Originated: 04/24/2013
05/29/2013: There are still some information missing. See redlines.
04/24/2013: Please label all lot lines and right of way lines with bearings, distances and/or
curve data. See redlines.
Comment Number: 38 Comment Originated: 04/24/2013
05/29/2013: Please move the legend closer to the boundary, and add a title to it. See
redlines.
04/24/2013: Please add a legend showing found & set pins and easement information.
Comment Number: 43 Comment Originated: 05/29/2013
05/29/2013: Please extend the right of way alignment of Wood Street to the south boundary of
the City property. See redlines.
Comment Number: 44 Comment Originated: 05/29/2013
05/29/2013: If you are keeping the boundary as it is, please show the conflicting boundary
evidence (fences, found pins -if any, calculated postion of the Rupel's survey etc.) per C.R.S.
38-51-106(k).
Topic: Site Plan
Comment Number: 40 Comment Originated: 04/24/2013
05/29/2013: This has not been corrected. The street names must match the Subdivision Plat.
The Plat will rule what the street name is.
04/24/2013: Please change all references to the street "Hart Farms Lane" to match the
Subdivision Plat, which shows the name as "Hart Farm Lane".
Comment Number: 42 Comment Originated: 04/24/2013
05/29/2013: There are still issues on sheets LS102, LS401, LS402 & LS502. See redlines.
04/24/2013: There are line over text issues on sheet LS101, LS102, LS401 & LS402.
Department: Traffic Operation
Contact: Ward Stanford, 970-221-6820, wstanford &fcaov.com
Topic: General
Comment Number: 4 Comment Originated: 05/28/2013
05/28/2013: Looks like a sight distance easement may be needed for the intersection of
Peregoy and Hart Farms. Please review for intersection sight dostance. If required please
coordinate between plan sets.
Topic: Landscape Plans
Comment Number: 5 Comment Originated: 05/28/2013
05/28/2013: Traffic has concerns with the multi -stemmed Bigtooth Maple's use at the Peregoy
and Hart Farms intersection. Concerns with its lower growing habit being a visibility problem for
the intersection. Can the aesthetics be accomplished with other landscaping while maintaining
the intersection visibility?
Department: Water -Wastewater Engineering
Contact: Roger Buffington, 970.221-6854, rbuffinuton(aD_fcaov.com
04/23/2013: All of the tree numbering on sheet LP101 is covered up by the tree symbols. .
Please adjust the text, so it can be read.
Comment Number: 11 Comment Originated: 04/23/2013
05/29/2013: This has not been corrected. The street names must match the Subdivision Plat.
The Plat will rule what the street name is.
04/23/2013: Please change all references to the street "Hart Farms Lane" to match the
Subdivision Plat, which shows the name as "Hart Farm Lane".
Comment Number: 13 Comment Originated: 04/23/2013
05/29/2013: There are still issues on sheet LP101, LP103 & LP401. See redlines.
04/23/2013: There are line over text issues on sheet LP103, LP401 & LP402.
Topic: Plat
Comment Number: 14 Comment Originated: 04/23/2013
05/29/2013: We did not receive these.
04/23/2013: Please provide the current monument records for the public land corners shown
for control.
Comment Number: 15 Comment Originated: 04/23/2013
05/29/2013: Repeat comment. This has not been addressed.
04/23/2013: Does the title commitment need to be updated?
Comment Number: 19 Comment Originated: 04/23/2013
05/29/2013: Repeat comment. This has not been addressed.
04/23/2013: Please add a legal description that matches the metes & bounds boundary shown
on sheet 2, referencing the current vesting deed if you wish ("being the same tract of land
described in the deed recorded at...").
Comment Number: 20 Comment Originated: 04/23/2013
05/29/2013: We need verification whether or not there are lienholders.
04/23/2013: Are there any lienholders? If so please add the Lienholders signature block.
Comment Number: 23 Comment Originated:. 04/23/2013
05/29/2013: The boundary now closes.
04/23/2013: The boundary as shown on sheet 2, does not close by 23.6'.
Comment Number: 25 Comment Originated: 04/23/2013
05/29/2013: There are still issues. See redlines.
04/23/2013: There are line over text issues on sheet 2.
Comment Number: 27 Comment Originated: 04/23/2013
05/29/2013: There are still issues with text. See redlines.
04/23/2013: Please rotate all text to read from the bottom or right hand side of sheet 2.
Comment Number: 28 Comment Originated: 04/23/2013
05/29/2013: Please provide the reception number for this dedication, and correct the typos in
the note. See redlines.
04/23/2013: Is there offsite right of way needed along the west end of the property?
risk of severe bank erosion. The McMurray Natural Area work and the bank stabilization of the
south bank of the river will help reduce this risk. Complete funding and schedule for the bank
stabilization work have not yet been identified. Design is not yet complete. Because this risk
has not been mapped and thus is not subject to the floodplain regulations in Chapter 10 of City
Code, any development is done at the owners risk. The owner is strongly encouraged to
provide additional mitigation to protect the development from erosion and overland flooding
and/or wait until the bank repairs are complete.
14. FEMA has officially kicked off remapping of the Poudre River. This will be a multi -year
project. Property owners near the river need to be aware that the floodplain may be remapped
and may change on their property. Furthermore, the Biggert-Waters Flood Insurance Reform
Act of 2012 is removing subsidized flood insurance rates. Complete details regarding
implementation by FEMA are unknown at this time. However, what we do know is that future
structures that are mapped in the floodplain will not be eligible to receive grandfathered or
subsidized rates. Therefore, if a structure is built with a basement and then gets mapped in the
floodplain, they will be paying actuarial rates which are significantly higher when the basement
is 8-10 feet below the 100-year flood elevation. Therefore, we are encouraging you to consider
if you want to have basements on these structures and encourage you to elevate the structures
as much as possible. We are providing you this information to help you plan for possible
future change in the floodplain mapping and already adopted changes in flood insurance.
15. Please see redlines on the plans and the 50% development review checklist. Please
contact Marsha Hilmes-Robinson for any questions on floodplain regulation requirements.
Topic: General
Comment Number: 5 Comment Originated: 04/24/2013
05/28/2013: Good for preliminary. At final, more detail of the design should be included in the
text.
04/24/2013: Please describe in more detail the water quality mitigation techniques proposed
for this project and describe how the site is meeting the LID requirements.
Department: Technical Services
Contact: Jeff County, 970-221.6588, jcounty(afcgov.com
Topic: Building Elevations
Comment Number: 1
05/29/2013: No comments.
04/22/2013: No comments.
Topic: Construction Drawings
Comment Originated: 04/22/2013
Comment Number: 3 Comment Originated: 04/22/2013
05/29/2013: This has not been corrected. The street names must match the Subdivision Plat.
The Plat will rule what the street name is.
04/22/2013: Please change all references to the street "Hart Farms Lane" to match the
Subdivision Plat, which shows the name as "Hart Farm Lane".
Topic: Landscape Plans
Comment Number: 10
Comment Originated: 04/23/2013
05/29/2013: Most of this has been addressed, but there are still issues. See redlines.
Comment Number: 3
Comment Originated: 04/23/2013
04/23/2013:
11. Please include a note on the plans that a floodplain use permit is required for any site work
in the floodplain or floodway including fences, paths, trellises, benches, bike racks, gardens,
etc.
12. Drainage report — Please see development review checklist for items to be included in the
drainage report including discussion of both the Poudre River and West Vine floodplain and
floodway; the lots in the West Vine floodway that cannot be built on at this time; structures in the
LOMR-Fill area and the requirements for elevation of the lowest floor, HVAC and electrical; type
of foundation for the LOMR-Fill lots, floodplain permit and CO requirements; breakaway fence
details; and, no -rise certification requirements in the floodway.
13. Due to the bank erosion that occurred during the flooding of April 1999, this property is at
Comment Number: 2
04/23/2013:
Comment Originated: 04/23/2013
1. Please include the floodplain and floodway boundary for both the Poudre River and West
Vine on the necessary drawings including — Plat, site plan, grading plan, drainage plan. The
Poudre River Floodway and West Vine flood fringe are missing.
2. The benchmark should be on the plat.
3. Site Plan — Please identify and show a detail for the fence that will be used in the floodway
areas. The fence must be break -away.
4. Grading and Drainage Plan — please include cross-section and BFE lines. Please identify
the datum shown for the cross-section and BFE elevations and the conversion (NGVD 1929 +
3.0 ft =1988 NAVD). A separate floodplain plan may be used if the grading and drainage plan
becomes too busy with all the required information.
5. Please provide more detail regarding grading in the floodway, vegetation, etc. Please
provide a detail how the paths are to be constructed (i.e. excavated and paths at or below
existing grade. There can be no fill placed in the floodway. A no -rise certification will be
required for all work in the floodway.
6. The lots in the West Vine Floodway cannot be constructed at this time. Please include a
note that these can only be developed if and when the West Vine floodway is removed.
7. Please designate which lots are in the area where the LOMR-Fill was approved.
8. Please include a table with the following information for the LOMR-Fill lots: BFE, Regulatory
flood protection elevation (BFE + 2.0 ft.), minimum lowest floor elevation, minimum HVAC and
electrical elevations. Include a note on the plans which homes must be elevated to the
regulatory flood protection elevation. For 100% plans, please also include the actual design
elevations for each structure.
9. Include a drawing detail for the type of foundation showing lowest floor elevation, HVAC
elevation and electrical relative to the BFE. Basements are not allowed below the regulatory
flood protection elevation. Structures on crawl spaces must meet the requirements of Section
10-40 of City Code. If garages are not going to be elevated to the regulatory flood protection
elevation, they must meet the venting requirements of Section 10-39 of City Code.
10. For the LOMR-Fill lots, please include a note on the plans that a floodplain use permit will
be required prior to issuance of the building permit and a FEMA elevation certificate must be
submitted and approved prior to issuance of the Certificate of Occupancy.
Comment Number: 3 Comment Originated: 04/10/2013
04/10/2013: After the plans are final, please send an AutoCad (version 2008) drawing of the site
plan to Terry Cox at TCOX@FCGOV.COM.
Comment Number: 4 Comment Originated: 04/10/2013
04/10/2013: The developer will need to coordinate electric service sizes and locations to each
lot with Light & Power Engineering (970)221-6700:
Department: Outside Agencies
Contact: Lindsay Ex, 970-224-6143, lexofcgov.com
Topic: General
Comment Number: 1 Comment Originated: 04/18/2013
04/18/2013: Comcast (Dennis Greenwalt at 970-484-7166) has the following comment:
-Comcast Cable will need to have all utility easements labeled on the plat map not just noted
on the cover sheet including the Tracks. Comcast would like to install facilities in a Joint Trench
manner with other utilities which will need to be worked out with developer for cots of trench.
Comcast will supply the materials and the labor to install it.
Comment Number: 2 Comment Originated: 04/18/2013
04/18/2013: Ed Holder (Poudre School District) has no comments.
Department: Park Planning
Contact: Lindsay Ex, 970-224-6143, lexpfcgov.com
Topic: General
Comment Number: 1 Comment Originated: 04/18/2013
05/28/2013: From Craig Foreman (May 21, 2013) - thanks for widening the trail easement area
to 14' by lot 1.
04/18/2013: From Craig Foreman (cforeman@fcgov.com):
-Plat should show a 20' public trail easement from the end of the Wood Street north to the
Poudre Trail.
-Parks would also prefer the easement to be greater than 10' for the trail near Lot 1.
Department: Stormwater Engineering
Contact: Jesse Schlam, 970.218.2932, ischlam(&fcgov.com
Topic: Erosion Control
Comment Number: 1
Comment Originated: 04/16/2013
04/16/2013: The site disturbs more than 10,000 sq-ft and in a sensitive area, therefore Erosion
and Sediment Control Materials need to be submitted for FDP. The erosion control
requirements are in the Stormwater Design Criteria Under the Amendments of Volume 3
Chapter 7 Section 1.3.3. Current Erosion Control Materials Submitted do not meet
requirements. Please submit; Erosion Control Plan, Erosion Control Report, and an Escrow /
Security Calculation. If you need clarification concerning this section, or if there are any
questions please contact Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com
Contact: Wes Lamarque, 970.416-2418, wlamargue()fcgov.com
Topic: Floodplain
project and at the cross walk entry by lot 32 appear to possibly cause site -distance issues.
Please review and address. Consider the use of higher branched ornamental trees or canopy
shade trees for some or all of these trees.
Comment Number: 18
Comment Originated: 05/29/2013
05/29/2013: Existing tees shown on Sheet LP103 are very light and difficult to see on the review
plans received. Can they be darkened? Would like to see this sheet with darker delineation
before final.
Comment Number: 19
05/29/2013:
Comment Originated: 05/29/2013
On landscape note 14 add Builder/Developer to the text. The work developer is added.
Department: Internal Services
Contact: Lindsay Ex, 970-224.6143, lex(a)fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 04/18/2013
04/18/2013:
GIS has the following comments (contact Todd Reidenbach at 416.2483 or
treidenbach@fcgov.com with any questions):
1. Hart Farms Ln and Peregoy Way have been added to the Larimer County Street. Inventory
System as approved street names.
2. please also see the GIS redlines emailed on 4/18/2013 to Ralph and Craig.
Comment Number: 2 i Comment Originated: 04/18/2013
04/18/2013: From Helen Matson: The 30' sewer easement commitment (item 19 comment on
the plat) - the City obtained an easement in 1986. 1 need to know if this is the same easement.
Comment Number: 3 Comment Originated: 04/18/2013
04/18/2013: Jim Colburn, Neighborhood Services, and Russ Hovland, Building Services, have
no comments.
Department: Light And Power
Contact: Doug Martine, 970-224-6152, dmartine &-fcoov.com
Topic: General
Comment Number: 1 Comment Originated: 04/10/2013
04/10/2013: Normal electric development charges plus costs to remove the existing electric
facilities, will apply.
Comment Number: 2 Comment Originated: 04/10/2013
04/10/2013: A landscape plan showing planned streetlights and preliminary locations of electric
vaults was sent to Russel+Mills Studio on 4-10-13. Street tree locations must be adjusted to
provide 40 feet minimum clearance between trees and lights (15 feet if the tree is an ornamental
type). All trees must be a minimum of 3 feet from electric vaults.
reviewed for health and structure in terms of their suitability for retention. Incorporate this
information as needed into the plans.
Comment Number: 7
Comment Originated: 04/24/2013
04/24/2013:
Please add to Landscape Note #14 that street tree planting shall be performed by a qualified
landscape contractor.
Comment Number: 8
Comment Originated: 04/24/2013
04/24/2013:
The use of Bigtooth Maple at the SW corner of the entrance off Wood street will tend to cause
site distance problem. Use a species that will have a higher canopy.
Comment Number: 9
Comment Originated: 04/24/2013
04/24/2013:
Provide percent of total for proposed new trees and check that it meets the minimum species
diversity in LUC 3.2.1 D 3.
Comment Number: 10
Comment Originated: 04/24/2013
04/24/2013: Street tree by lot 31 appears to be closer than 40 from the street light. A
ornamental tree could be used at this location as long as it is 15 feet away from the street light.
Comment Number: 12 Comment Originated: 05/29/2013
05/29/2013: Forestry will need to receive the information requested as follows from the certified
arborist prior to hearing, and guidance from this evaluation will need to be incorporated in to the
plan. For example if a tree is not recommend for retention by the certified arborist and requires
mitigation then the plan will need to incorporate that change with additional mitigation.
Provide a statement by a private certified arborist that the trees to retain have been reviewed
for health and structure in terms of their suitability for retention. Incorporate this information as
needed into the plans.
Provide a statement by a private certified arborist that the trees shown to be preserved (not
zones A & B7 have a likelihood of surviving construction (grade changes, locations by
hardscape, locations by buildings etc.).
Comment Number: 13 Comment Originated: 05/29/2013
05/29/2013: Add information in Note number 11 about not performing deep cultivation within drip
lines of existing trees. Cultivation over 2 inches depth shall not occur within the drip line of
existing trees to preserve.
Comment Number: 14
Comment Originated: 05/29/2013
05/29/2013: Does landscape note number 20 pertain only to private trees. It seems unclear so
editing for clarification might help.
Comment Number: 15
Comment Originated: 05/29/2013
05/29/2013: Clarify which trees are upsized on sheet LP103 by marking them as upsized
mitigation trees with direct labeling.
Comment Number: 16 Comment Originated: 05/29/2013
05129/2013: Please specify Honeylocust as Skyline Honeylocust on the plant list.
Comment Number: 17 Comment Originated: 05/29/2013
05/29/2013: The use of low branched ornamental trees at the intersections at the entrance to the
05/28/2013: The 30' sanitary sewer easement that is being vacated and rededicated on the plat
appears to be moved a couple feet further south than it exists currently. Please verify with
Roger Buffington that this can be vacated and rededicated as well it's new location.
Department: Environmental Planning
Contact: Lindsay Ex, 970.224.6143, lex .fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 04/19/2013
05/28/2013: 1 still need data on where the groundwater hydrology is on the site, but the
plantings look excellent. I need this prior to hearing.
04/19/2013: Prior to hearing, we'll need to discuss further the wetland mitigation requirements
for the small wetlands that range from 53-2587 sf. How will the City know if the forebay wetland
mitigation is successful? Pre -construction hydrologic monitoring is necessary to establish the
likelihood of the success of this area. What plantings are proposed?
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tbuchanan(a)fcgov.com
Topic: General
Comment Number: 11 Comment Originated: 05/29/2013
05/29/2013: Add a note that addresses tree pruning and removal using a licensed arborist if it
is not already on the plan. All tree pruning and removal work shall be performed by a business
holding a current Fort Collins Arborist License.
Topic: Landscape Plans
Comment Number: 1 Comment Originated: 04/24/2013
04/2412013: Provide the required number of up -sized mitigation trees at the bottom of the
table. That number of trees should be up -sized on the project or planned for off -site if
necessary. Up sized trees should be to the tree size standard in LUC 3.2.1 F.
Comment Number: 2 Comment Originated: 04/24/2013
04/24/2013: Provide the completed tree inventory table on LP100 that was developed in the
field with City Forestry staff.
Comment Number: 3
Comment Originated: 04/24/2013
04/24/2013: Show all the trees proposed to be preserved on LP103 to see how they are sited
on the landscape/site plan in reference to buildings, roads and proposed trees. Place the
identification number by these existing trees to retain on LP 103 so they can be referenced to
the table.
Comment Number: 4 Comment Originated: 04/24/2013
04/24/2013: Label and delineate Zones A &B on sheet LP 101.
Comment Number: 5 Comment Originated: 04/24/2013
04/24/2013:
Provide a statement by a private certified arborist that the trees shown to be preserved (not
zones A & B) have a likelihood of surviving construction (grade changes, locations by
hardscape, locations by buildings etc.).
Comment Number: 6 Comment Originated: 04/24/2013
04/24/2013: Provide a statement by a private certified arborist that the trees to retain have been
05/28/2013: This will be discussed in more detail during final design as engineering is still
awaiting further input from streets department. 04/24/2013: G1 - The street neck downs shall be
designed to a minimum radius to allow for proper street maintenance and not impede the flow
of runoff in the gutter. The minimum radius on the curves should be 15'.
Comment Number: 25 Comment Originated: 05/28/2013
05/28/2013: Sheet U1 - The Sidewalk on the north side of Wood and Harts Farm should extend
along the squared off right of way as well. The curved sidewalk should also be incorporated to
allow for both options in the future. The pedestrian ramps on the curve may need to be
relocated at Final to get them off the curve.
Comment Number: 26 Comment Originated: 05/28/2013
05/28/2013: Sheet G1 - Additional discussion will need to occur at final regarding the detached
sidewalk along the west side of wood street. Stormwater has mentioned that this swale actually
operates as a detention pond so consideration to water surface elevation, volume, trail grade,
elevation and alignment will need to be considered.
Comment Number: 27 Comment Originated: 05/28/2013
05/28/2013: Sheet R1 - How are the flows on wood street that drain south of the High Point
being dealt with on both the east and west side of the road? Interim or temporary
improvements may be required to ensure they don't inundate adjacent properties. .
Comment Number: 28 Comment Originated: 05/28/2013
05/28/2013: Sheet R1 - Show the storm sewer inlets and storm pipe as future on the roadway
plan and profile on wood street.
Comment Number: 29 Comment Originated: 05/28/2013
05/28/2013: Sheet R1 and DR1 - Show the drainage basins for Wood Street to demonstrate
where and how much water is draining from it.
Topic: General
Comment Number: 21 Comment Originated: 04/24/2013
04/24/2013: Many of the lots being proposed.are narrow and in some cases are less than 50
feet in width. Consideration should be taken to the layout of street trees, driveways, and utility
services. These may need to be shown in specific details at Final Submittal.
Comment Number: 23 Comment Originated: 05/28/2013
05/28/2013: Prior to public hearing, A letter of intent will be required for the right of way
dedication on Karan Livingston property.
Topic: Plat
Comment Number: 24 Comment Originated: 05/28/2013
05/28/2013: Tract C and a portion of Tract D need to have public access allowed to satisfy the
pedestrian connectivity requirement. Consider changing the Tract designation on the cover or
overlaying a pedestrain access easement.
Comment Number: 30 Comment Originated: 05/28/2013
05/28/2013: The Right of way to be dedicated on the City's property should be enough to
encompass the full street cross section with a standard detached sidewalk. This will ensure
that in the future there is adequate right of way if the sidewalk or property are changed.
Comment Number: 31 Comment Originated: 05/28/2013
05/28/2013: Driveways, roads, any improvements associated with public roads, e.g., the
sidewalk, park strip, etc. cannot be counted toward the open space areas (see Section 4.1.(E)
(3) of the Land Use Code. Please revise these calculations to reflect only the open space area
on the east of the property and the common area in the center of the property. With these
updated calculations, please also provide revised modification and statement of planning
objectives documents.
04/19/2013: Open Space Area of 57.4% - can you clarify how you came to this number? The
calculations on the site plan are unclear. Also where do you outline the purpose and acreage
of each tract (per submittal requirements)?
Comment Number: 4 Comment Originated: 04/19/2013
05/28/2013: This is getting better - my only concern is that you cannot see the existing trees
well on the landscape plans - can those be a darker lineweight than the groundcover?
04/19/2013: Lineweights -I'm struggling to read some of the various lineweights on the plan.
Can this be fixed?
Comment Number: 13 Comment Originated: 05/28/2013
05/28/2013: The City Limits still needs to be shown on all vicinity maps.
Comment Number: 14 Comment Originated: 05/29/2013
05/29/2013: Lot 21 is less than 50' in width. Please revise or submit a modification or
alternative compliance request pursuant to Section 3.5.2(D)(4) of the Land Use Code.
Department: Engineering Development Review
Contact: Andrew Gingerich, 970.221.6603, aaingerichPfcaov.com
Topic: Construction Drawings
Comment Number: 6
Comment Originated: 04/21/2013
05/28/2013: Please remove the Parking designation from the Wood Street cross section and
show two 15' travel lanes instead. 04/21/2013: CS1 - The cross section of Wood Street
appears to be shown "looking south", please revise to "look north". Addtionally please show
all the dimensions for the Connector local on the cross section and feel free to add additional
"existing" or "varies" comments to the cross section.
Comment Number: 8
Comment Originated: 04/21/2013
05/28/2013: 1 did not see any additional language regarding the sanitary easement for the lots
that back up to it. Did you include language or discuss with Roger? 04/21/2013: U1 - Fences
and Decks are not permitted within the existing sanitary sewer easement in lots 14 - 21. Please
coordinate with Water Wastewater and additional language may need to be added to the site
plan, plat and development agreement.
Comment Number: 11 Comment Originated: 04/24/2013
05/2812013: The letter of intent has been recieved from Helen Matson in Real Estate services.
04/24/2013: U1 - Easement/Right of Way will be required from City of Fort Collins for end of
sidewalk on the north side of Harts Farm where it ties to Wood Street. Please contact Helen
Matson in real estate services for a letter of intent.
Comment Number: 14 Comment Originated: 04/24/2013
Comment Number: 2 Comment Originated: 04/19/2013
05/28/2013: Thank you for the updated modification request. In general, staff is supportive of
the request as the consistency of the streetscape is still preserved. However, the project does
not appear to comply with Section 3.5.2(D)(2)(b) which requires that driveway width not exceed
10' in width. In the modification request, you say the widths will be 10' or more. Please
reconcile this difference to gain staff support for this modification.
Also, each of the commitments regarding picket fence height, opacity, porch floor area, etc.
must be explicit on the site plans. Please add notes on the plans to reflect the commitments
addressed in the modification. Please also add a note that in addition to being 20' from back of
ROW, the garages must also be a minimum of 4' behind the house.
04/19/2013: Modification request - as per my discussion with the applicant, staff will need to
see a revised modification justification that addresses the standards in Section 3.5.2(D)(2) of the
Land Use code regarding front porches that encroach into the setback. Images/sketches that
illustrate how the project would appear if the standard were met and how the project would
appear as proposed shall also be provided. The plans will also need to illustrate where the
driveways are to comply with this standard as well as with Section 3.5.2(E).
Comment Number: 3 Comment Originated: 04/19/2013
Cityof
F&tCollins,
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov. com/developmentreview
May 31, 2013
Craig Russell
Russell Mills Studios
141 S. College Ave. Ste. 104
Fort Collins, CO 80524
RE: Pateros Creek, PDP130011, Round Number 2
Please see the following summary of comments from City staff and outside reviewing agencies for your
submittal of the above referenced project. If you have questions about any comments, you may contact the
individual commenter or direct your questions through the Project Planner, Lindsay Ex, at 970-224-6143 or
lex@fcgov.com.
Comment Summary:
Department: Current Planning
Contact: Lindsay Ex, 970-224-6143, lex()fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 04/19/2013
05/28/2013: Thank you for the revised set of planning objectives. When I asked for adding the
LIE standards, I meant the policies outlined in City Plan, not the specific code standards. I also
did not see a construction schedule. Please update and resend.
04/19/2013: In the Statement of Planning Objectives, please also address the Poudre River
Corridor Overlay principles in City Plan. The Statement should also address the U-E
Neighborhood standards. How does the project comport with the Northwest Subarea Plan as
well? Also, I did not see the development schedule in the written statement; please provide.