Loading...
HomeMy WebLinkAboutAVAGO TECHNOLOGIES BLDG. 4 WEST EXPANSION - MJA/FDP - FDP130006 - CORRESPONDENCE - (6)3. Commercial and Multi .,mily 4 stories and taller: 2009 IECC Chaptb. Fort Collins Green Code Amendments effective starting 1-1-2012. A copy of these requirements can be obtained at the Building Office or contact the above phone number. City of Fort Collins Building Services, Plan Review, 416-2341. (LUC), including Article - general Development Standards. The ent,. _UC is available for your review on the web at http://www.colocode.com/ftcollins/landuse/begin.htm. 8. If this proposal is unable to satisfy any of the requirements set forth in the LUC, a Modification of Standard Request will need to be submitted with your formal development proposal. Please see Section 2.8.2 of the LUC for more information on criteria to apply for a Modification of Standard. 9. Please see the Submittal Requirements and Checklist at: http://www.fcgov.com/developmentreview/applications.php. 10. The request will be subject to the Development Review Fee Schedule that is available in the Community Development and Neighborhood Services office. The fees are due at the time of submittal of the required documents for the appropriate development review process by City staff and affected outside reviewing agencies. Also, the required Transportation Development Review Fee must be paid at time of submittal. 11. When you are ready to submit your formal plans, please make an appointment with Community Development and Neighborhood Services at (970)221-6750. Pre -Submittal Meetings for Building Permits Pre -Submittal meetings are offered to assist the designer/builder by assuring, early on in the design, that the new commercial or multi -family projects are on track to complying with all of the adopted City codes and Standards listed below. The proposed project should be in the early to mid -design stage for this meeting to be effective and is typically scheduled after the Current Planning conceptual review meeting. Applicants of new commercial or multi -family projects are advised to call 416-2341 to schedule a pre -submittal meeting. Applicants should be prepared to present site plans, floor plans, and elevations and be able to discuss code issues of occupancy, square footage and type of construction being proposed. Construction shall comply with the following adopted codes as amended: 2009 International Building Code (IBC) 2009 International Residential Code (IRC) 2009 International Energy Conservation Code (IECC) 2009 International Mechanical Code (IMC) 2009 International Fuel Gas Code (IFGC) 2009 International Plumbing Code (IPC) as amended by the State of Colorado 2011 National Electrical Code (NEC) as amended by the State of Colorado Accessibility: State Law CRS 9-5 & ICC/ANSI Al17.1-2003. Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF. Frost Depth: 30 inches. Wind Load: 100- MPH 3 Second Gust Exposure B, Seismic Design: Category B. Climate Zone: Zone 5 Energy Code Use 1. Single Family; Duplex; Townhomes: 2009 IRC Chapter 11 or 2009 IECC Chapter 4 2. Multi -family and Condominiums 3 stories max: 2009 IECC Chapter 4. 5. If utility plans are needeu due to design changes, grade changes, utility installations, etc any public improvements must be designed and built in accordance with the Larimer County Urban Area Street Standards (LCUASS). They are available online at: http://www.larimer.org/engineering/GMARdStds/UrbanSt.htm 6. This project is responsible for dedicating any right-of-way and easements that are necessary for this project. It was brought up at the conceptual meeting held on 1/14/13 that there may be a need for an emergency access easement per Poudre Fire Authority comments. This easement will need to be dedicated by separate document. Please contact me for information on this process. 7. Depending on the extent of construction proposed a Development Construction Permit (DCP) or an excavation permit may need to be obtained prior to starting any work on the site. Department: Electric Engineering Contact: Alan Rutz, 970.224.6153, arutz()fcgov.com 1. Contact Light and Power to discuss new load and primary metering requirements. Current Planning Contact: Ted Shepard, 970-221.6343, tshepard aofcgov.com 1. Since the request exceeds 80,000 in gross floor area, the review will be considered a Major Amendment and subject to review by the Planning and Zoning Board. A neighborhood meeting is required unless the Director determines that the development proposal would not have significant neighborhood impact. 2. As mentioned by Engineering, a consultation with the City's Traffic Engineer is recommended to determine the scope of the Transportation Impact Study, The T.I.S, can range from a comprehensive analysis, to a brief memo, or it may be waived. It may be helpful to establish a baseline as to number of employees, number of parking spaces and how the employees are distributed across the various shifts. Then, the new floor area and new number of employees can be projected on top of the baseline to help determine the impact. It would be helpful to know what hours are assigned to each shift and what is the extent of the shift overlap, if any. 3. The Major Amendment will include a revised Landscape Plan. Be sure to consider buffering the residential area to the north to mitigate any perceived impacts that may be associated with building height, mass, bulk, scale, noise, etc. 4. The revised Lighting Plan should also consider the residential area to the north so that there is no spillover of illumination north of your property line. 5. The proposed development project is subject to a Type 1 review and public hearing, the decision maker for Type 1 hearings is an Administrative Hearing Officer. The applicant for this development request is not required to hold a neighborhood meeting for a Type 1 hearing, but if you would like to have one to notify your neighbors of the proposal, please let me know and I can help you in setting a date, time and location fora meeting. Neighborhood Meetings are a great way to get public feedback and avoid potential issues that may occur later in the review process. 6. Please see the Development Review Guide at www.fcgov.com/drg. This online guide features a color coded flowchart with comprehensive, easy to read information on each step in the process. This guide includes links to just about every resource you need during development review. 7. This development proposal will be subject to all applicable standards of the Fort Collins Land Use Code 6. HMMP An updated HMMP shall be submitted to the Poudre Fire Authority for review and approval. Department: Environmental Planning Contact: Lindsay Ex, 970-224.6143, lex(a)fcgov.com 1. The natural resources on the site are largely on the eastern border, Fossil Creek Inlet Ditch. As the proposed expansion is in close proximity to Ziegler Road and almost 1/2 mile from the ditch, there are no natural resources concerns because of the proposed expansion. 2. The applicant should make note of Article 3.2.1(C) that requires developments to submit plans that "...(4) protects significant trees, natural systems, and habitat". Note that a significant tree is defined as a tree having DBH (Diameter at Breast Height) of six inches or more. If any trees on site have a DBH of greater than six inches, a review of the trees shall be conducted with Tim Buchanan, City Forester (221 6361) to determine the status of the existing trees and any mitigation requirements as the result of development impacts. It appears the proposed expansion will be north of any significant trees, but if this is not the case, then a site visit shall be scheduled with the City Forester. 3. With respect to landscaping and design, the City of Fort Collins Land Use Code, in Article 3.2.1 (E)(2)(3), requires that you use native plants and grasses in your landscaping or re landscaping and reduce bluegrass lawns as much as possible. Reveille Bluegrass is one option for having bluegrass lawns and using less water. 4. The City's green building program has many programs that may benefit your project. Resources are available at the Green Building web page: http://www.fcgov.com/greenbuilding/. Of particular interest may be the Integrated Design Assistance Program, which offers financial incentives and free technical support to those interested in delivering high performance buildings that exceed building code requirements for energy performance. Gary Schroeder (970 221 6395) is the contact person for this program. This is the direct link to the web page for this program: http://www.fcgov.com/conservation/biz idap.php, Department: Engineering Development Review Contact: Tyler Siegmund, 970-221-6501, tsiegmund(&fcgov.com 1. Larimer County Road Impact Fees and Street Oversizing Fees are due at the time of building permit. Please contact Matt Baker at 224-6108 if you have any questions. 2. The City's Transportation Development Review Fee (TDRF) is due at the time of submittal. For additional information on these fees, please see: http://www.fcgov.com/engineering/dev-review.php 3. Any damaged curb, gutter and sidewalk existing prior to construction, as well as streets, sidewalks, curbs and gutters, destroyed, damaged or removed due to construction of this project, shall be replaced or restored to City of Fort Collins standards at the Developer's expense prior to the acceptance of completed improvements and/or prior to the issuance of the first Certificate of Occupancy. 4. Please contact the City's Traffic Engineer, Joe Olson (224-6062) to schedule a scoping meeting and determine if a traffic study is needed for this project. In addition, please contact Transportation Planning for their requirements as well. required before the Dee_jpment Construction permit is issued. Thb _.,fount of the escrow is determined by the design engineer, and is based on the site disturbance area, cost of the measures, or a minimum amount in accordance with the Fort Collins Stormwater Design Criteria. 6. The design of this site must conform to the drainage basin design of the Fox Meadows Master Drainage Plan Update as well the City's Stormwater Design Criteria. Department: Fire Authority Contact: Jim Lynxwiler, 970-416-2869, oynxwiler poudre-fire.org FIRE LANES . Fire Lanes shall be provided for every facility, building or portion of a building when any portion of the facility or any portion of an exterior wall of the first story of the building is located more than 150 feet from fire apparatus access. The fire code official is authorized to increase the dimension of 150 feet if the building is equipped throughout with an approved, automatic fire -sprinkler system. 2006 International Fire Code 503.1.1 2. FIRE LANE SPECIFICATIONS A fire lane plan shall be submitted for approval prior to installation. In addition to the design criteria already contained in relevant standards and policies, any new fire lane must meet the following general requirements: > Shall be designated on the plat as an Emergency Access Easement. > Maintain the required 20 foot minimum unobstructed width* & 14 foot minimum overhead clearance. > Be designed as a flat, hard, all-weather driving surface capable of supporting 40 tons. > Be visible by painting and signage, and maintained unobstructed at all times. *STRUCTURES THREE OR MORE STORIES IN HEIGHT Required fire lanes shall be 30 foot wide minimum on at least one long side of the building. At least one of the required access routes meeting this condition shall be located within a minimum of 15 feet and a maximum of 30 feet from the building, and shall be positioned parallel to on entire side of the building. 2006 International Fire Code 503.2.3, 503.3, 503.4 and Appendix D 3. DEAD-END FIRE LANES Dead-end fire access roads in excess of 150 feet in length shall be provided with an approved area for turning around fire apparatus. Current fire access to the south side of Building 4 shall be maintained. FCLUC 3.6.2(B)2006; International Fire Code 503.2.5 and Appendix D 4. PUBLIC -SAFETY RADIO AMPLIFICATION SYSTEM When required, public -safety radio amplification systems shall be designed and installed in accordance with criteria established by the Poudre Fire Authority. Poudre Fire Authority Bureau Admin Policy #07-01 5. GROUP H-5 OCCUPANCIES REQUIREMENTS > Automatic sprinkler system > Manual fire alarm system > Emergency alarms for notification of an emergency condition in HPM facility > Continuous gas detection system provided for HPM gases > Explosion control if applicable 2006 International Fire Code 903.2.4.2; 907.2.5; 908.2; 911 the main service gate a,.., located on a concrete pad at least 20ft from... public sidewalk. Department: Water -Wastewater Engineering Contact: Roger Buffington, , rbuffin ton fc ov.com 1. The City provides water and wastewater services for the Avago/HP site; however, Avago and HP maintain the water distribution and wastewater collection systems within the Avago/HP campus. The terms under which the City provides these services are outlined in an agreement dater August 9, 2012. 2. The City provides water and wastewater services for the Avago/HP site; however, Avago and HP maintain the water distribution and wastewater collection systems within the Avago/HP campus. The terms under which the City provides these services are outlined in an agreement dater August 9, 2012. 3. The water conservation standards for landscape and irrigation will apply. Information on these requirements can be found at: http://www.fcgov.com/standards 4. The water conservation standards for landscape and irrigation will apply. Information on these requirements can be found at: http://www.fcgov.com/standards Department: Stormwater Engineering Contact: Glen Schlueter, 970-224-6065, gschluetera()fcgov.com 1. The addition to building 4 and the parking lot reconfiguration will affect the amount of impervious area on the site. The drainage engineer will need to evaluate the effects of these changes and their impact to the overall drainage system. A drainage letter prepared by a Professional Engineer registered in Colorado is sufficient instead of a full drainage report. A grading plan is required as well. 2. When improvements are proposed to an existing developed site and there is an increase in impervious area greater than 1000 square feet, additional onsite detention is required with a 2 year historic release rate or a release rate not to exceed 0.23 cfs/acre for water quantity. Parking lot detention for water quantity is allowed as long as it is not deeper than one foot. If there is less than 1000 but more than 350 square feet of new impervious area, a site grading plan is required along with the impervious area documentation. 3. Additional water quality treatment may also be required as described in the Urban Storm Drainage Criteria Manual, Volume 3 - Best Management Practices (BMPs). (hftp://www. udfcd.org/downloads/down_critman ual_vol I I I.htm) 4. The Stormwater Utility anticipates that City Council will be approving new Low Impact Development (LID) requirements that will go into effect in mid February 2013. Please contact Basil Harridan at 224-6035 or bhamdan@fcgov.com for more information. The present draft requires that 50% of the new impervious area must be treated by an LID method and 25% of new parking lots must be pervious. Once the impervious area change has been calculated please contact Basil to determine the LID requirements. (224-6035) 5. The city wide Stormwater development fee (PIF) is $6,390.00lacre ($0.1467/sq.ft.) for new impervious area over 350 sq.-ft., and there is a $1,045.00/acre ($0.024/sq.ft.) review fee. No fee is charged for existing impervious area. These fees are to be paid at the time each building permit is issued. Information on fees can be found on the City's web site at hftp://www.fcgov.com/utilities/business/builders-and-developers/plant-investment-development-fees or contact Jean Pakech at 221- 6375 for questions on fees. There is also an erosion control escrow City of F6ft C611ins Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins. CO 80522 970.221.6750 970.224.6134 - fax fcgov. com January 17, 2013 PaulTanguay Avago Technologies 4380 Ziegler Rd Fort Collins, CO 80525 Re: 4380 Ziegler Rd - Avago Building 4 West Annex Description of project: This is a request to construct a 235,000 sq. ft., 3-story addition to the west side of Building 4 located at 4380 Ziegler Road (Parcel# 87333-27-002). The addition will include fabrication space, clean room and support functions. The site is part of the Avago campus and located in the Harmony Corridor Zoning District (H-C). Please see the following summary of comments regarding the project request referenced above. The comments offered informally by staff during the Conceptual Review will assist you in preparing the detailed components of the project application. Modifications and additions to these comments may be made at the time of formal review of this project. If you have any questions regarding these comments or the next steps in the review process, you may contact the individual commenter or direct your questions through the Project Planner, Ted Shepard, at 221-6343 or tshepard@fcgov.com. Comment Summary: Department: Zoning Contact: Noah Beals, 970.416.2313, nbealsOfcuov.com 1. In the Harmony Corridor (HC) zone district development projects over 80,000 square feet require a Type 2 review. 2. We will need a detailed site plan, an updated landscape plan, an updated lighting plan, and elevations. New Mechanical/Utility equipment locations need to be identified on the above mentioned plans with notes on how such equipment is to be screened/painted 3. Land Use Code 3.2.2(C)(4) This section requires bicycle parking spaces, these will need to be identified on the plans and shall be located near primary pedestrian entrances. 4. This new addition will need to accommodate for an increase in trash/recycling needs with new enclosures. Such enclosures are required to be designed with walk-in access without having to open