Loading...
HomeMy WebLinkAboutAVAGO TECHNOLOGIES BLDG. 4 WEST EXPANSION - MJA/FDP - FDP130006 - CORRESPONDENCE - (5)The parking spaces that adjoin the new dryland seed landscape area will need to have either curb and gutter or wheel stops installed along the head of the stalls. Comment Number: 3 Comment Originated: 04/10/2013 04/10/2013: Please indicate the color of the cooling towers. Additional trees or screening are needed to screen the cooling towers and utility yard. Comment Number: 4 Comment Originated: 04/10/2013 04/10/2013: Where is the trash and recycling enclosure? How are the increased trash and recycling needs of the addition being handled? Department: Current Planning In preparation for the May 16, Planning and Zoning Board hearing, please provide a revised Site and Landscape Plan that indicates the height, length, width, slope and landscaping of the berm located north of the building. Department: Traffic Operation Contact: Ward Stanford, 970-221-6820, Topic: Construction Drawings Comment Number: 2 wsta nford(a)fcgov.com Comment Originated: 04/16/2013 04/16/2013: Where is the displaced parking being relocated? Concern is if the relocated parking is at a location that may cause access roadway issues spilling back. onto public roadways. Comment Number: 3 Comment Originated: 04/16/2013 04/16/2013: Traffic Op's has mild concern regarding traffic circulating around the "coveted" 84 spaces by the addition that might cause a blockage of entering traffic from Ziegler spilling back onto Ziegler. Highly doubtful but need to make note of the concern. Department: Transportation Planning Contact: Emma McArdle, 970.224.6197, emcardle(Mcgov.com Topic: General Comment Number: 1 Comment Originated: 04/16/2013 04/16/2013: According to LUC section 3.6.5, new development shall "adequately accomodate existing and planned transit service by integrating facilities designed and located appropriately for transit into the development plan." Transfort operates 2 routes on Harmony Road adjacent to this site. A bus stop is utilized at the northwest comer of Harmony Road and Technology Parkway, it is not ADA accessible and does not meet our transit design standards. In accordance with the LUC, this development shall upgrade this stop to at a minimum meet ADA accessibility. Because this is a challenging site, I think it would be best to plan a brief site visit to discuss how this can be accommodated. Please get in touch with me to plan a visit. Contact either 970-224-6197 or emcardle@fcgov.com. Department: Zoning Contact: Noah Beals, 970.416-2313, nbeals(a.fcgov.com Topic: General Comment Number: 1 Comment Originated: 04/10/2013 04/10/2013: Land Use Code (LUC) 3.2.4(C) Lighting levels for loading and unloading docks is minimum average of 5 foot-candles. Plans will need to be revised. Light fixture Z4 appears to be up -lighting. Please provide details that indicate that the light will be locked into a down directional position. Comment Number: 2 Comment Originated: 04/10/2013 04/10/2013: Based on the proposed plans it is expected that some asphalt that currently exists will be removed. Where the asphalt is removed these areas will no longer be allowed for any vehicle use or storage. Please indicate on the plans on vehicles use and storage will be restricted from the landscaped area. begins and ends ._ ,,de the campus and does not connect to a . Jlic road. As such, the Fire Marshal will accept this pre-existing condition with the understanding that the proposed access road to the north side of Bldg. 4 conform to current fire lane standards as previously discussed. Department: Stormwater Engineering Contact: Jesse Schlam, 970.218-2932, jschlarn(cUcgov.com Topic: Erosion Control Comment Number: 1 Comment Originated: 04/08/2013 04/08/2013: Please address all of the redlines in the Erosion Control Report (There are redlines on the plan drawings included in that report.), Please also attach a sequence chart (based off of the section C "Sequenced BMP Implementation")to the planset. If you need clarification concerning this, or if there are any questions please contact Jesse Schlam 970-218-2932 or email at jschlam@fcgov.com Comment Number: 2 Comment Originated: 04/0812013 04/08/2013: Please Supply an Erosion Control Calculation. If you need clarification concerning this, or if there are any questions please contact Jesse Schlam 970-218-2932 or email at jschlam@fcgov.com Department: Technical Services Contact: Jeff County, 970.221-6588, jcountyP-fcgov.com Topic: Building Elevations Comment Number: 1 04/15/2013: No comments. Topic: Construction Drawings Comment Number: 2 Comment Originated: 04/15/2013 Comment Originated: 04/15/2013 04/15/2013: Please correct the elevations for the benchmarks shown on sheets C100, C101, C200, C201, C202, C203, C204, C300, C500, C600, C700 & C701. Comment Number: 3 Comment Originated: 04/15/2013 04/15/2013: There are line over text issues on sheets C200, C201, C600 & C801. Comment Number: 4 Comment Originated: 04/15/2013 04/15/2013: There is a text over text issue on sheet C201. Topic: Lighting Plan Comment Number: 5 Comment Originated: 04/15/2013 04/15/2013: Please correct the address shown on sheets 1 & 2. Topic: Site Plan Comment Number: 6 Comment Originated: 04/16/2013 04/16/2013: Please correct the address shown on sheets 1 & 2. Comment Number: 7 Comment Originated: 04/16/2013 04/16/2013: Please correct the legal description. This does not match the current legal description shown on the Larimer County Assessor's webpage. We suggest that you check with the Larimer County Clerk & Recorder's office for a current deed. Please provide a tree planting detail for new and transplanted trees. Transplanted tree detail should incorporate recommendations from a qualified and experienced tree transplanting contractor. Comment Number: 4 Comment Originated: 04/17/2013 04/17/2013: Are there any other trees impacted by the proposed construction other than those shown to be transplanted? If so please schedule an on -site meeting with the City Forester to review and determine in any mitigation will be required. Department: Light And Power Contact: Doug Martine, 970-224-6152, dmartine(a)fcgov.com Topic: General Comment Number: 1 Comment Originated: 04/05/2013 04/05/2013: The builder or developer will need to coordinate the location of anew high voltage switch and a primary voltage electric meter with Jim Garcia in Light & Power Engineering (970)221-6817. Department: PFA Contact: Jim Lynxwiler, 970.416.2869, jlynxwiler(a)poudre-fire.orq Topic: General Comment Number: 01 Comment Originated: 04/16/2013 04/16/2013: ACCESS & WATER SUPPLY Fire department access and water supply concerns have been addressed and resolved by Avago representatives prior to FDP. Comment Number: 02 04/1612013: ROOF ACCESS Comment Originated: 04/16/2013 Per prior discussions with Avago representatives, a protected stairwell with roof access will be provided on the west side of the building. Stairway access to the roof shall be in accordance with IFC 1009,12. Such stairways shall be marked at street and floor levels with a sign indicating that the stairway continues to the roof. Comment Number: 04 Comment Originated: 04/16/2013 04/16/2013: FIRE.DEPARTMENT CONTROL PANEL The relocation of the control panel for Bldg. 4 shall be approved by the fire department. Comment Number: 05 Comment Originated: 04/16/2013 04/16/2013: KEY BOXES REQUIRED The location or relocation of Knox Boxes shall be approved by the fire department. Comment Number: 06 04/1612013: MISCELLANEOUS Comment Originated: 04/16/2013 BDA assessment, fire protection systems, fire detection & alarm systems, and hazardous materials concern shall be addressed at the time of building plan review. Comment Number: 07 Comment Originated: 04/18/2013 04/18/2013: EAE MAY BE ELIMINATED The proposed EAE on the north side of Bldg. 4 may be omitted from the plat as the EAE needed to dedica._ .iris easement by separate document. PIE_ . contact me and I can email additional information on this process. Topic: General Comment Number: 4 Comment Originated: 04/16/2013 04/17/2013: As discussed in the staff review meeting, no emergency access/fire access easement is needed per PFA. 04/16/2013: The proposed fire access easement needs to extend to a public street connection for PFA to have access to the property in the event of an emergency. On the current plat, ring road is not dedicated as emergency access. Department: Forestry Contact: Tim Buchanan, 970.221-6361, tbuchanan(a7fcaov.com Topic: Landscape Plans Comment Number: 1 04/17/2013: Comment Originated: 04/17/2013 Royal Raindrops Crabapple is a new cultivar. Recommend that this selection be reviewed with some local nursery professionals about their experience with its fire blight resistance. Scots Pine may require more insect control than other pines. Consider using some Austrian Pine to provide increased species diversity Topic: Landscape Plans Comment Number: 2 04/17/2013: Comment Originated:' 04/17/2013 Please identify species and size (DBH) of trees to be transplanted. Add a Landscape Note that that says in effect: Method of transplanting and after care for all transplanted trees to follow a qualified and experienced tree transplanting contractor's recommendations on all of the following items. Recommendations from the qualified and experienced tree transplanting contractor shall be provided to the City Forester prior to transplanting. Size of tree spade Time of year for transplanting Mulched water basin size and location Staking and guying Supplemental irrigation frequency and duration after transplanting Inspections for health and insect and disease problems during establishment Comment Number: 3 04/17/2013: Comment Originated: 04/17/2013 City of Flirt Collins Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov. com/developmentre view April 19, 2013 Angela Milewski BHA Design 1603 Oakridge Dr. Fort Collins, CO 80525 RE: Avago Technologies Building 4 West Expansion Major Amendment, FDP130006, Round Number 1 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Ted Shepard, at 970-221-6343 or tshepard@fcgov.com. Comment Summary: Department: Engineering Development Review Contact: Tyler Siegmund, 970.221-6501, tsiegmund(a fcgov.com Topic: Construction Drawings Comment Number: 1 Comment Originated: 04/16/2013 04/16/2013: Please add our General Notes (Appendix E-1 FC/Lar in LCUASS) to the cover sheet in addition to the construction notes. Contact me if you need a copy of our General Notes Appendix. Comment Number: 2 Comment Originated: 04/16/2013 04/16/2013: For final mylar submittal: remove planning submittal from the revisions box on the title block on all utility plan sheets. Topic: General Comment Number: 3 Comment Originated: 04/16/2013 04/17/2013: As discussed in the staff review meeting, no emergency access/fire access easement is needed per PFA 04/16/2013: There is a separate process to dedicate the fire access easement included with this submittal. A Transportation Development Review Fee of $250 plus recording costs are