Planning & Zoning Hearing May 16, 2013
Page 8
C. The quality of the air emissions emanating from the existing and proposed
industrial buildings was a topic of concern. In response, the applicant explained
that Avago is governed by an air quality,emissions permit from the State of
Colorado which establishes a maximum amount of emissions. Avago cannot
exceed this specified amount of emissions or otherwise risk a violation from
Colorado Department of Health and the Environment. Avago does not plan on
exceeding the allowances on its existing permit. In fact, the desire is to reduce
current levels.
D. Noise and illumination were concerns raised by those in attendance. In
response, the aforementioned berm will provide a buffer so that the decibels at
the receiving property line will comply with City Code. Lighting will be setback
from the north property line by a sufficient distance such that there will be no light
spilling across the property line.
5. Findings of Fact/Conclusion:
•
A. The proposed use is permitted in the H-C zone district and since the building
exceeds 80,000 square feet, the use is subject to review by the Planning and
Zoning Board. •
B. The Major Amendment complies with the applicable standards of the H-C zone
district of Article Four.
C. The Major Amendment complies with the applicable General Development
standards of Article Three.
RECOMMENDATION
Staff recommends approval of Avago Technologies Building Four Expansion, Major
Amendment, #FDP 130006.
0
Project Name, Project #FDP130006
Planning & Zoning Hearing May 16, 2013
• Page 7
Q. Section 3.6.4 — Transportation Impact Study
The requirement to submit a Transportation Impact Study was waived due to the
proposed use being an extension of the on
operation. Also, the estimated number
of additional employees is considered minimal due to shift schedules and relative to the
minor impact.on the surrounding streets during peak times. This means that all through
traffic and turning movements at the intersections of Harmony Road / Ziegler Road and
at Ziegler Road / Council Tree Avenue will remain within the range of acceptable Levels
of Service without the need for additional improvements.
The anticipated number of deliveries is not expected to exceed the present level.
Harmony Road, Ziegler Road and Council Tree Avenue are fully improved and include
bike lanes. Transfort Routes 16 and 17 serve Harmony Road. In order to improve the
Transfort bus stop, a new concrete pad will be provided including a connecting
walkway.
4. Neighborhood Input:
A neighborhood information meeting was held March 25, 2013. A summary of this
meeting is attached. The main concerns, and their resolution, are summarized as
• follows:
A. The primary concern is the extent of the buffering between the proposed addition
and the north property line. The concern was expressed that with the addition,
now would also be an opportune time to enhance the screening of the existing
building. In response, the applicant has provided the upgraded berm which will
include additional landscaping, particularly evergreen trees. With a length of 800
feet and a height mostly at ten feet, and topped with landscaping, the screening
of both the addition and the existing building will be more effective and will soften
the appearance of the industrial buildings as viewed from the neighborhoods to
the north.
B. Traffic on Ziegler Road was raised specifically the difficulty for the residents of
the two neighborhoods to the north in gaining access onto Ziegler Road. In
response, the City Traffic Operations Department is aware of these issues,
particularly making left turns to go southbound on Ziegler Road. There is a
reluctance, at this time, on the City's part to locate and install a traffic signal while
there are still large tracts of vacant land on the west side of Ziegler Road. Until
these tracts develop, the necessary warrants for installing a traffic signal may not
be met. As mentioned, the new users of the proposed Avago addition will gain
access from the existing traffic signal at Ziegler Road and Council Tree Avenue
and does not, by itself, generate traffic in sufficient numbers to justify any further
traffic signals on Ziegler Road.
Project Name, Project #FDP130006
Planning & Zoning Hearing May 16, 2013
Page 6 •
N. Section 3.5.1(G) — Building Height Review
The building will be three stories and 59 feet high. Buildings over 40 feet in height are
subject to this standard. Although the addition includes three exhaust stacks that are
ten feet high, they are exempt from height considerations per Section 3.8.17(C), which
states that cooling towers and ventilators and other similar rooftop equipment that cover
no more than 5% of the horizontal surface of the roof are exempt from height review.
(1.)Views. With regard to views, the proposed addition does not substantially
alter the opportunity for, and quality of, desirable views from public places,
streets, and parks within the community.
(2.)Light and Shadow. The shadow analysis reveals that at 9:00 a.m. and 3:00
p.m. on December 21st, the length of the shadows do not cross the north
property line.
(3.)Privacy. The proposed height of 59 feet for the addition avoids infringing on
the privacy of adjacent public and private property, particularly adjacent
residential areas and parks.
(4.)Neighborhood Scale. The proposed addition is compatible with the scale of
the Hewlett-Packard / Avago 160-acre campus relative to the existing six •
buildings in terms of height, mass, length -to -mass and the human scale.
O. Section 3.5.1(J) — Operational/Physical Compatibility
All operations take place within the buildings. Loading docks and trash enclosures are
located on the south side of the building. Based on existing operations, the potential
noise generated by the mechanical equipment will be attenuated by a combination of
distance, earthen berm and landscaping such that there will be no violation of the City
Code as to decibels at the receiving property line. As noted, illumination does not spill
off -site. The parking lot setback from the north property line by 900 feet and there is
sufficient parking all Avago employees, customers, vendors and visitors.
P. Section 3.5.3(D) — Character and Image
As mentioned, the proposed addition is designed with sufficient detail and provides a
distinct base, middle and top so as to comply with the standard. There is more detail at
the lower level for pedestrian interest and more expansive use of materials on the upper
portions. The sloping roof at the top breaks the vertical plane. For a large-scale
industrial building, the proportions of length, width and height are balanced.
Project Name, Project #FDP130006
Planning & Zoning Hearing May 16, 2013
• Page 5
I. Section 3.2.2(D) — Access and Parking Lot Design
This standard requires that all vehicular use areas be designed to be safe, efficient,
convenient and attractive, considering all modes of transportation that will use the
system (cars, trucks, buses, bicycles and emergency vehicles.) The fundamental
component of the campus circulation system is the established loop road which
circumnavigates the six buildings and their parking lots. Within this circulator are the
buildings and parking lots, while outside are the earthen berms, mature landscaped
areas and perimeter fencing that define the quality and character of the campus.
Access to the campus is limited at the entry points; two off Harmony Road and one off
Ziegler Road. While the manned guard houses have been removed, the campus does
not invite the public as there are no goods or services that are offered to the general
public. The primary users of the system are the employees and customers as well as
the shipping and receiving operations. The semi -open campus is feasible due to
security being provided at each building entrance. This is comparable to other large-
scale industries throughout the community.
J. Section 3.2.2(J) - Setbacks
The demolition and reconstruction of a portion of the parking lot is within the boundary
• of the perimeter loop road and would be no closer to Ziegler Road than existing
improvements.
K. Section 3.2.2(K)(5) — Handicap Parking
This standard requires that for a parking lot providing between 76 and 100 spaces,
there shall be a minimum of four handicap accessible spaces. There are four such
spaces located as close to the connecting walkway as possible.
L. Section 3.2.4 — Site Lighting
The new parking lot light fixtures will match the existing fixtures and remain in
compliance of being fully -shielded down -directional. Because the parking lot serves a
campus framework, and is separated from the public roadways by a significant
landscaped area, there is no spillage of illumination off the property.
M. Section 3.5.1 — Building and Project Compatibility
The proposed addition is specifically designed to match the existing building. There will
be matching split -face concrete block at the lower one-third of the building with
horizontal accent bands of smooth -face concrete block to provide vertical relief. The
upper two-thirds will be a combination of metal panels and synthetic stucco in a pattern
that matches the existing building. The addition will be topped with a standing seam
• metal roof, color gray, to match the existing roof.
Project Name, Project #FDP130006
Planning & Zoning Hearing May 16, 2013
Page 4
•
C. Section 3.2.1(E)(4) — Parking Lot Perimeter Landscaping
The 84-space parking lot is located internally to the campus and not along a public
street. It is approximately 900 feet south of the north property line and 265 feet from the
west property line. While there will be 13 new trees planted along the north edge, the
primary screening is provided by the existing landscaping along the north and west
property lines that contribute to the overall aesthetics of the entire campus. The
combination of distance and existing and proposed landscaping allows this parking lot
to be sufficiently mitigated in accordance with the intent of the standard.
D. Section 3.2.1(E)(5) — Parking Lot Interior Landscaping
With 84 spaces, the parking lot is required to have 6% interior landscaping. The parking
lot landscaping, primarily due to the prominent entry treatment, exceeds this minimum
requirement.
E. Section 3.2.1(F) — Tree Protection and Replacement
The new addition involves the relocation of five evergreen trees. These trees will be
transplanted to the north of the addition in the area of the earthen berm where their
location and maturity will contribute to the buffering.
F. Section 3.2.2(B) — Access, Circulation and Parking — General Standard •
The site of the expansion is presently a temporary outside storage yard and a parking
lot containing 393 parking spaces. Of these 393 spaces, 309 will be eliminated with 84
remaining. At full build -out, the estimated number of new employees is 100 who will be
divided among three shifts. This 84-space parking lot; combined with the existing
parking lots to the south and west of Building One, are sufficient to accommodate the
number of existing and future employees and customers.
G. Section 3.2.2(C)(4) — Bicycle Facilities
As an industrial use, the facility is required to provide four bicycle parking spaces in
fixed racks. Building Four West Annex will provide 30 bicycle parking spaces.
H. Section 3.2.2(C)(5)(6) —Walkways and Pedestrian /Bicycle Destinations
The campus as a whole is well -served by a network of private drives which allow for
bicycles and pedestrians to gain access at all entry points. Walkways are provided
between the public sidewalks and the loop road. As part of this project, Avago will
install a new eight -by -eight -foot concrete pad for the Transfort bus stop and a five-foot
wide walkway connecting the main driveway. This walk will be 50-feet in length and tie
into the existing public sidewalk ramp.
•
Project Name, Project #FDP130006
Planning & Zoning Hearing May 16, 2013
• Page 3
B. Section 4.26(E)(3)(a) — Height
The proposed addition will be three stories in height thus under the maximum allowable
height of six stories for nonresidential buildings.
C. Section 4.26(E)(3)(b) — Campus Exception
The campus has been established and is defined by the placement of the existing six
buildings all served by a perimeter loop road. All six buildings are clustered in the
middle of the campus with parking lots located outside the cluster. In fact, Building Four
is connected to Building Two and all buildings are loosely connected by courtyards.
Since the proposed addition is considered to be part of an established campus, and is
oriented internally to the campus framework, the proposed addition is exempted from
having to front on a public street.
3. Article Three — Applicable General Development Standards:
A. Section 3.2.1(C)(D) — Landscaping and Tree Planting Standards
The primary change in the landscaping is north of both the existing building and the
• proposed addition where the existing earthen berm will be significantly enhanced. In
order to provide buffering to the north to the maximum extent feasible, the new berm will
be lengthened to 800 feet which exceeds the width of the north elevation of the existing
building and proposed addition by 200 feet.
The berm will undulate with the height ranging from 10 to 12 feet. For no less than 500
feet, the berm will maintain the height of ten feet with two peaks reaching 12 feet. In
addition, new trees and shrubs, with an emphasis on evergreens, will be planted along
the earthen berm to further the buffering benefit for the neighborhoods to the north.
New landscaping also includes foundation shrubs along the west elevation featuring a
meandering double row of shrubs. The north side of the 84-space parking lot will be
screened by 13 new trees.
B. Section 3.2.1(E)(6) - Screening
There will be six cooling towers along the north elevation. In terms of height, two of
these towers will be 22 feet, three will be 19 feet, and one will be 15 feet. These towers
will be mitigated by the aforementioned earthen berm and landscaping. The loading
dock is located on the south side and will not be visible from the north.
0
Project Name, Project #FDP130006
Planning & Zoning Hearing May 16, 2013
Page 2 •
COMMENTS:
1. Background:
The surrounding zoning and land uses are as follows:
N: R-L; Woodland Park Estates
N: U-E; Hidden Pond Estates
S: H-C; Harmony Technology Park, Filing One, (Intel)
E: H-C; Preston Kelly 2"d Filing, Lot One (Hewlett-Packard)
W: H-C; Symbios Logic Subdivision (A.M.D.)
W: H-C; Front Range Village First Filing (Regional Shopping Center, Office and Public
Library)
The 160 acre campus was annexed in 1977 in a series of annexations called Harmony
Annexations Three and Four. It was platted as the Preston -Kelley Subdivision in 1978.
Buildings One, Two and Three were approved in 1978 and constructed as a single
phase. These were followed by individual phases for each subsequent building. In
order, the next three buildings constructed were Buildings Six, Five and Four. A total of
seven buildings were anticipated on the Master Plan. Prior to adoption of the Land Use
Code, all approvals were processed administratively as an I-L (Limited Industrial) Site
Plan Review. •
s
Building Four is referred to as ICBD Genesis IV and was submitted after the adoption of
the Land Use Code. It was approved by the Planning and Zoning Board in 1998 as a
315,000 square foot building for the testing and manufacture of micro silicon chips and
integrated circuits.
In 1999, the campus was divided into two lots by the Preston Kelley Filing Two
Subdivision for the purpose of creating two distinct companies, Hewlett-Packard (94
acres) and Agilent, which has now become Avago, (70 acres).
2. Article Four — Applicable Harmony Corridor District Standards:
A. Section 4.17(B)(2)(c)1. - Permitted Use and Section 4.17(D)(3)(b) — Dimensional
Standards
The proposed land use, research laboratories and light industrial, are permitted subject
to administrative review. However, all new structures greater than 80,000 square feet in
gross leasable area are subject to Planning and Zoning Board review.
0
� FarOCollins
ITEM NO
MEETING DATE
STAFF
3
6/16113
SHEPARD
PLANNING & ZONING BOARD
PROJECT: Avago Technologies Building Four Expansion, Major Amendment,
#FDP 130006
APPLICANT: Avago Technologies Wireless USA, Inc.
c/o BHA Design
1603 Oakridge Drive
Fort Collins, CO 80525
OWNER: Avago Technologies Wireless USA, Inc.
4380 Ziegler Road
Fort Collins, CO 80525
• PROJECT DESCRIPTION:
4
This is a request to expand Avago Technologies Building Four which is the most
northwesterly building on their campus located at 4380 Ziegler Road. The proposed
addition would contain 138,800 square feet and be three stories in height. The addition
would be placed on the west side of the existing building. The addition would allow
more space for the current operations which include fabrication for wafer manufacturing,
clean room operations and testing and other support functions. The total Avago site
contains 70 acres and is zoned H-C, Harmony Corridor.
S I'i D Cr , is 6'J I
RECOMMENDATION: Approval ivc�o'H PX 0-pt-& r- c , wE-
"oc.,v6 'Tdwe7t.i i4^ r' �i3:' Fes•r
EXECUTIVE SUMMARY: Nax-vol P, c.
The land use is permitted in the H-C zone and because the building exceeds 80,000
square feet, it is subject to Planning and Zoning Board review. The request complies
with the applicable standards of the Harmony Corridor zone and the General
Development standards of Article Three. The location of the proposed 138,800 square
foot addition is on the west side of the existing Building Four and is buffered to the north
with an earthen berm. The existing parking lot will be reduced from 393 spaces to 84
spaces which remain sufficient to serve the addition. The architecture of the proposed
• addition is specifically designed to match the existing building.