Loading...
HomeMy WebLinkAboutAVAGO TECHNOLOGIES BLDG. 4 WEST EXPANSION - MJA/FDP - FDP130006 - CORRESPONDENCE -04/16/2013: Please correct the legal description. This does not match the current legal description shown on the Larimer County Assessor's webpage. We suggest that you check with the Larimer County Clerk & Recorder's office for a current deed. Department: Water -Wastewater Engineering Contact: Roger Buffington, 970-221-6854, rbuffington anfcgov.com Topic: General Comment Number: 1 Comment Originated: 04/16/2013 04/16/2013: No comments. that is not shown on the detail. Please provide more information on the grade break behind the proposed walk down to the irrigation ditch. Depending on the grade break additional curb behind the walk may be needed. Topic: Site Plan Comment Number: 7 Comment Originated: 06/04/2013 06/04/2013: Please include the bus stop and connecting sidewalk on the site plan Department: PFA .Contact: Jim Lynxwiler, 970-416-2869, iynxwiler .poudre-fire.org Topic: General Comment Number: 08 Comment Originated: 06/04/2013 06/04/2013: All prior comments from PFA have been satisfactorily resolved by representatives of AVAGO. No further comments required. Department: Stormwater Engineering Contact: Wes Lamarque, 970-416.2418, wlamargue(a)_fcgov.com Topic: General Comment Number: 5 Comment Originated: 06/04/2013 06/04/2013: The detail for the underdrain needs to be discussed. Wrapping the fabric with a Geo-membrane is not preferred. Department: Technical Services Contact: Jeff County, 970-221-6588, lcountv(a)fcgov.com Topic: Building Elevations Comment Number: 1 06/04/2013: No comments. 04/15/2013: No comments. Comment Originated: 04/15/2013 Topic: Construction Drawings Comment Number: 2 Comment Originated: 04/15/2013 06/04/2013: This has been addressed, but the spelling of "Ziegler" is incorrect. The description of benchmark 7-01 does not match our description. What is benchmark #1, and how will someone find the benchmarks? 04/15/2013: Please correct the elevations for the benchmarks shown on sheets C100, C101, C200, C201, C202, C203, C204, C300, C500, C600, C700 & C701. Comment Number: 3 Comment Originated: 04/15/2013 06/04/2013: There are still line over text issues on sheets C500 & C701. 04/15/2013: There are line over text issues on sheets C200, C201, C600 & C801. Topic: Site Plan Comment Number: 7 Comment Originated: 04/16/2013 06/04/2013: This has been addressed, but "Fort" needs to be spelled out. City.d Fort Collins Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax tcgov. com/de velopmentreview June 07, 2013 Angela Milewski BHA Design 1603 Oakridge Dr. Fort Collins, CO 80525 RE: Avago Technologies Building 4 West Expansion Major Amendment, FDP130006, Round Number 2 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Ted Shepard, at 970-221-6343 or tshepard@fcgov.com. Comment Summary: Department: Current Planning Contact: Ted Shepard, 970-221-6343, tshepard(@fcgov.com Topic: General Comment Number: 2 Comment Originated: 06/05/2013 06/05/2013: Be sure to add to the plans all the impact mitigation measures that were agreed to between Avago and the property owners to the north post public hearing. Department: Engineering Development Review Contact: Tyler Siegmund, 970 221-6501, tsieamund(a)fcgov.com Topic: General Comment Number: 5 Comment Originated: 06/04/2013 06/04/2013: An excavation permit for the bus stop construction in the right-of-way will need to be obtained prior to the start of installation. City acceptance of the bus pad and walk will be required prior to Certificate of Occupancy. Please contact me for more information about the permitting process. Comment Number: 6 Comment Originated: 06/04/2013 06/04/2013: The bus stop/connecting walk detail on sheet C701 shows curb and gutter along E Harmony. Is this proposed With the bus stop installation? It was discussed at the site meeting to incorporate a 6 inch curb at the back of the bus stop pad