Loading...
HomeMy WebLinkAboutRIVER DISTRICT BLOCK ONE MIXED-USE (ENCOMPASS) - PDP - PDP120020 - REPORTS - RECOMMENDATION/REPORTDELICH ASSOCIATES Traffic & Transportation Engineering 2272 Glen Haven Drive Loveland, Colorado 80538 Phone: (970) 669-2061 Fax: (970) 669-5034 �71111r MEMORANDUM TO: Ted Shepard, Fort Collins Planning Aaron Iverson, Fort Collins Transportation Planning FROM: Matt Delich DATE: March 4, 2013 SUBJECT: Nine Fish (Encompass) Transportation Impact Study — Pedestrian Level of Service (File:.1234ME01) The pedestrian level of service (LOS) evaluation provided in the "Nine Fish Transportation Impact Study' (TIS), dated July 2012, indicated that two factors would not meet the minimum LOS criteria. When our pedestrian evaluation was conducted there were some gaps in the sidewalk system in the area of the site. However, I reviewed Google aerial photographs, taken in late 2012, and determined that there have been improvements to the sidewalk system on both sides of Linden Street. As a result of this review, both the Visual Interest & Amenities factor and the Security factor will be at LOS A, which is acceptable. Do not hesitate to contact me if you have questions or desire additional information. POUDRE PRE -MIX FISH LE GE. ROCK TO BURIED ROCK REVEGETATIO FEATURES -VEGETATED ARMORED S/W BANK -EXTENSIVE RIPARIAN HABITATAND EMERGENT WETLANDS -ISOLATED HABITAT AREA -WIDENED CHANNEL -SECONDARY CHANNEL IN HIGH FLOWS -THREE RIFFLE DROPS W/ FISH LEDGES -OVERLOOK @ RIVER ACCESS POINT W/ INTERPRETIVE SIGNAGE -COST $4.2 MILLION RETAINING WALL ROCK TOE PROTECTION RIVER CHANNEL ° Additional Enhancements • Three low, boulder drop structures added that span the river channel and alter the low - flow hydraulic conditions to enhance aquatic habitat • Fish ledges or overhangs created along the west bank toe at the elevation of the low - flow water surface • City recreation trail realigned to follow the top of the proposed levee alignment • New access points from the trail to the river Existing land use policies strive for the balance of recreational uses along the river with minimized impacts to sensitive natural communities. The primary objective for the upper reach, between College Avenue and the BNSF Railroad Bridge, is to expand the existing drop structures to create recreational opportunities for boaters and at the same time minimize impacts to the river's natural ecological system. Recreational improvements were limited in the lower reach and enhanced in the upper reach to avoid ecological impacts along the lower reach to the extent possible. Additional recreational opportunities will result in increased river use and spectators. The upper project reach is more conducive to this type of use as it currently includes a river overlook and open bank areas used for access and spectator viewing. However, due to the significance of the natural areas upstream, downstream and across from the site, management and monitoring of the site is necessary to minimize the impacts as much as practical. The Plan for this reach, shown in the attached figure labeled "Preferred Plan — College to BNSF Railroad," incorporates the following components: • Two new boulder drop structures, just upstream of the BNSF Railroad bridge, creating "boat chutes" and play waves for paddlers • Trail and access enhancements along the right bank • Develop a monitoring and management plan to minimize the use and impacts to the surrounding natural areas This is the only alternative evaluated for the upstream reach, and it is considered to be part of the preferred project plan. The preferred plan for the project provides bank stabilization and stream stability of the Poudre River between Linden Street and Lincoln Avenue. The plan also provides significant ecological enhancements by creating and enhancing aquatic habitat and by providing significant on -site revegetation and expansion of existing riparian habitat. The newly aligned levee provides flood control and removes the Buckingham neighborhood from the 100-year floodplain. New recreational opportunities are created in the reach between College Avenue and the BNSF Railroad Bridge with the addition of two boatable drop structures and trail/access enhancements. The total project cost is approximately $4,540,000, which includes $4,260,000 for the improvements between Linden Street and Lincoln Avenue and $280,000 for the improvements between College Avenue and the BNSF Railroad Bridge. While each of the alternatives analyzed provides the same level of channel stabilization and flood protection to the project reach, they do not provide the same degree of enhancement to the reach. The ecological, recreational and aesthetic enhancements provided by the preferred plan are significantly greater than the other two alternatives. v Ayres Associates Three alternatives were developed for stabilizing the reach of the river between Linden Street and Lincoln Avenue. The design alternatives were formulated based on the primary project objectives, which include: • Reach stabilization • Ecological enhancement • Improvement to or creation of new recreational features in the reach • Flood control for Buckingham Neighborhood (remove from 100-year floodplain) The alternatives were developed based on contributions from the River Team and the various boards, commissions, and interest groups. To the extent feasible, the design alternatives also incorporated themes and concepts proposed in the DRCIP. Each of the three alternatives provide the same level of channel stabilization and flood protection to the project reach. They do not, however, all provide the same degree of ecological, recreational, and aesthetic enhancement to the reach. Hydraulic and ecological analyses were conducted to evaluate and compare the alternatives. Cost estimates were also developed for each alternative to assist in the evaluation. The preferred plan was ultimately selected by the River Team. The decision considered project costs, level of protection, and enhancement provided by the project. The River Team also took into consideration public comment taken during the open houses. The preferred plan for the project reach from Linden Street to Lincoln Avenue, as shown in the attached figure, labeled "Preferred Plan- Linden to Lincoln," includes the following components: West Bank • A reconstructed 2H:1V bank slope covered with riprap protection up to the 100-year water surface level • Riprap covered with layer of topsoil above the 2-year water surface elevation and then planted with various tree and shrub species • A retaining wall along sections of the bank to avoid encroachment of existing buildings and property • Revegetation of soils above riprap • Boulder toe protection • Low rock bench along bank at elevation of 2-year water surface, creating shoreline variability and a planting surface for establishing vegetation near the low -flow water level East Bank Expanded left overbank area to increase conveyance and create space for development of riparian habitat Secondary channel added to the expanded overbank that increases conveyance and creates backwater habitat Levee A set -back levee to allow for channel and ecological enhancement 100-year flood protection Buried riprap placed along toe of levee to protect against erosion and channel migration iv Ayres Associates EXECUTIVE SUMMARY The Poudre River Enhancement Project (PREP) is aimed at stabilizing two segments of the Poudre River channel in downtown Fort Collins while providing ecological and recreational enhancements. The project addresses two reaches between College and Lincoln Avenues. The downstream project reach extends from Linden Street to Lincoln Avenue and incorporates primarily channel stabilization and ecological enhancements. The upstream project reach is bound by College Avenue at the upstream end and the Burlington Northern Santa Fe (BNSF) Railroad bridge at the downstream end. Recreational enhancements are the main improvements in this upper reach. The project has been identified by the Poudre River Master Drainageway Plan (Ayres Associates 2002-Draft) for the Poudre River corridor through Fort Collins and the City's Downtown River Corridor Implementation Program (DRCIP) summary report (City of Fort Collins 2000). The Master Plan identified the reach between Linden Street and Lincoln Avenue as an area subject to flooding and flood damage. During the 100-year flood event, water overtops the left'(east) bank and flows through the Buckingham subdivision and also floods several businesses between Buckingham and Lemay Avenues. Damages associated with these overtopping flows were estimated at nearly 0.5 million dollars for the 100-year event. As a result, several alternatives were proposed for mitigating the flooding potential in the reach. The Master Plan also identified the right bank between Linden and Lincoln as an area of channel instability. Due to the presence of buildings on the right bank and the potential for significant damage if erosion continues, the site was given the highest priority ranking. The DRCIP seeks to coordinate the implementation of existing and new projects, such as the PREP, involving natural features, recreation, public infrastructure, historic resources, flood mitigation, and development. Various projects were reviewed in the DRCIP study and prioritized through community involvement and comment from City officials. Several of the highest priority items pertain directly to the project reach from Linden Street to Lincoln Avenue. The PREP was initiated by the City Utilities staff and directed by members of the Stormwater, Parks and Recreation, Advance Planning, and Natural Resources departments. The Design Team is composed of representatives of the consulting firms of Ayres Associates and EDAW. Additional comment and review was provided by "The River Team," which is composed of several City departments and individual City staff members who have an interest in the Poudre River. Historically, the Poudre River channel between Linden Street and Lincoln Avenue followed a large meander to the east of its current alignment. The oxbow from this earlier alignment is still visible in aerial photos. During the 1960s, the oxbow was bypassed creating the direct channel between Linden Street and Lincoln Avenue. The relocation of the main river channel caused the channel length between Linden Street and Lincoln Avenue to shorten by approximately 1,200 feet. It also caused an increase in the channel slope to approximately 0.5 percent. These changes in channel planform and slope have resulted in increased velocities and shear stress conditions through the project reach. Both banks have been subject to erosion and the channel bed has degraded down to bedrock along most of the reach. In an attempt to arrest the erosion and protect the adjacent land, large amounts of concrete rubble and debris have been dumped along both banks. Riparian vegetation is limited and its growth inhibited by the rubble and near -vertical banks. Ayres Associates POUDRE RIVER ENHANCEMENT PROJECT Linden Street to Lincoln Avenue and College Avenue to BNSF Railroad Bridge Prepared for City of Fort Collins P.O. Box 580 Fort Collins, Colorado 80522 AWES ASSOCIATES P.O. Box 270460 Fort Collins, Colorado 80527 (970) 223-5556, FAX (970) 223-5578 Ayres Project No. 32-0509.01 P-RV10-TX.DOC October 2003 P W, opp-, Ab, 4� qs, EDAW Encompass, River District Block One F W�e:wMFM�n iTti^�swmqrYYdM�F11NY.1�wMF�iInMFF.YeA�MYgVwUNYRiFY.waww Y City o{ Fort Collins .YY wP.Y11O�.NYY.�YVtltltN.FgL�1{bR Fl.wt��iiiN'IFWIw%�CMr���NFwYM1FGbl� N � ! �F.YT��ti�Ya.Y1'Mti�r•.FF��.1's�wM.mtlFM�MF�YMFnw1tY Y.�yI.MrtIFIYY s1w-sYwtlYY1MMMNN�nM1�Irt1Y I.tl.MVW i1.Ch Mwn.YwAM�.Oww4.Xwa�IbnT.�n..YY1.Ma�N6 it rtp.s�V.W Y.T.�..F.FFn F. �'FM sFrF�.IN.Y�.si.�nlry b ATTACHMENTS Aerial Map Poudre River Enhancement Project — Executive Summary Memorandum from Matt Delich, Delich and Associates, Consultant for the Applicant — Transportation Impact Study — Pedestrian Level of Service Clarification Letters Received from Public Memorandum from Lucia A. Liley, Liley, Rogers and Martel, Legal Counsel for the Applicant — Table of Contents describing the list of documents included as Evidence of Record Evidence of Record F. Staff recommends a condition of approval regarding the proper completion, as prescribed by the Federal Emergency Management Agency, of the (1.) Conditional Letter of Map Revision prior to approval of a Final Plan and (2.) the Letter of Map Revision which must be approved by the City of Fort Collins and then properly submitted to the Federal Emergency Management Agency prior to issuance of the Certificate of Occupancy of the building. G. Staff recommends a condition of approval regarding the proper completion of an Easement that is necessary to be granted by the City Council for the placement of permanent building components within the Linden Street right-of-way prior to approval of a Final Plan. RECOMMENDATION: Staff recommends approval of Encompass, River District Block One, #P.D.P.120020, subject to the following two conditions: 1. Staff recommends a condition of approval regarding the proper completion, as prescribed by the Federal Emergency Management Agency, of the (1.) Conditional Letter of Map Revision prior to approval of a Final Plan and (2.) the Letter of Map Revision which must be approved by the City of Fort Collins and then properly submitted to the Federal Emergency Management Agency prior to issuance of the Certificate of Occupancy of the building. 2. Staff recommends a condition of approval regarding the proper completion of an Easement that is necessary to be granted by the City Council for the placement of permanent building components within the Linden Street right-of-way prior to approval of a Final Plan. 22 Jefferson/Linden and the Willow/Linden intersections will operate acceptably with existing control and geometry. 4. In the long range (2035), given development of the proposed P.D.P., and increase in background traffic, the College/Jefferson-Maple, Jefferson/Linden and the Willow/Linden intersections will operate acceptably with existing control and geometry. 5. Acceptable Level of Service is achieved for bicycle and transit modes based upon the measures in the multi -modal transportation guidelines. 6. For pedestrians, Levels of Service are achieved for directness, continuity, street crossings, visual interest and amenities and security. 6. Conclusion and Findings of Fact: In evaluating the request for a P.D.P for Encompass, River District Block One, Staff makes the following findings of fact: A. The P.D.P. is in compliance with the Downtown Plan as adopted in 1989 and as amended in 2006, and City Plan as adopted in 2011. B. The three proposed land uses, mixed -use dwellings, general office and standard restaurant, are permitted in the R-D-R zone, subject to administrative review per Section 4.17(B). C. The P.D.P. complies with the applicable development standards of the R- D-R zone per Section 4.17(D). D. The P.D.P. complies with the applicable general development standards of Article Three. E. With regard to site lighting the reduced illumination in the parking lot after 10:00 p.m, the P.D.P. complies with the Alternative Compliance provision of Section 3.2.4(E). The reduction in lighting accomplishes the purpose of the equally well because the after 10:00 the usage of the parking diminishes and the location behind the building, with limited public access, is more protected than most other commercial parking lots. The proposed illumination after 10:00 p.m. will contribute to protecting the natural area from light intrusion. There would be no detriment to neighborhood continuity and connectivity. Opportunities for non -vehicular access are not impacted. The proposed design is innovative by reducing energy usage. 21 Y. Section 3.5.1(G) — Building Height Review The building is 64 feet in height, to the top of the sloped roof of the fifth floor penthouse which houses a loft for the fourth floor unit. There are no views that are impacted by the height of the proposed building. The shadow analysis indicates that there are no substantial adverse impacts on the distribution of natural and artificial light on adjacent public and private property. There is no infringement on the privacy of adjacent public and private property. Finally, height of the building is compatible with the scale of the neighborhood in terms of relative height, height -to -mass, length -to -mass and building -scale to human - scale. Tall buildings in the vicinity include Ranch -Way Feeds, Northside Aztlan Center, Willow Street Lofts, New Belgium Brewery and the Colorado State University Engines and Energy Conversion Lab. A building under construction across Linden Street, Legacy Apartments, will be four stories upon completion. Z. Section 3.6.4 — Transportation Impact Study A Transportation Impact Study was prepared for this P.D.P. The study includes an impact analysis for both the short term (2017) and the long term (2035) timeframes. The study also includes an analysis for both pedestrian and bicycle Level of Service. Estimated trip generation was based on three proposed uses: • General Office — 19,874 square feet • Standard Restaurant— 5,639 square feet • Apartments — 12 dwelling units Four intersections were evaluated for Level of Service analysis: • College/Jefferson-Maple • Jefferson/Linden • Willow/Linden • Linden/Encompass Driveway The following conclusions have been reviewed and accepted by the Traffic Operations Department: 1. Current operation at the College/Jefferson-Maple, Jefferson/Linden and Willow/Linden intersections is acceptable. 2. The College/Jefferson-Maple and Jefferson/Linden intersections are currently signalized. The Willow/Linden intersection does not meet the signal spacing criteria and, therefore, will not be signalized and remain a four-way stop. 3. In the short range (2017), given development of the proposed P.D.P., and an increase in background traffic, the College/Jefferson-Maple, 20 T. Section 3.4.1(G)(2) — Streambank Stabilization As mentioned in the previous section under R-D-R zone district standard 4.17(D)(1)(a)1.2., streambank stabilization will utilize native vegetation and not exposed rip rap. U. Section 3.4.1(l) — Design and Aesthetics The predominant building material facing the Poudre River is native stone. Native landscaping will be planted on both the subject site and on the city -owned embankment with permission to be granted by an easement. For persons using the Poudre River Trail, the views to the subject parcel will continue to be obscured by existing and proposed plant material. V. Section 3.4.1(L) — Compatibility with Public Natural Areas or Conserved Land The area along the Poudre River is owned and managed by the City's Parks and Recreation Department. The proposed project will be compatible with the management of this area. The proposed continuous landscape buffer minimizes wildlife conflicts and establishes a setback thereby providing a transition between the development and the publicly owned conserved land. W. Section 3.4.3 Water Quality The stormwater runoff associated with the new additional impervious area will be conveyed, treated, detained and released in accordance with the requirements of Stormwater Utility. X. Section 3.4.7 — Historic and Cultural Resources No historic structures exist on the site or on adjacent sites. Nor is the site within a historic district. There are also no historic designated structures or properties on this block face on either side of Linden Street. There are, however, three residential properties on this block on the opposite side of Linden Street which contain buildings that were determined to be eligible for Local Landmark Designation in a 2002 study conducted by the City. The architectural elevations for the proposed building indicate a two-story element along Linden Street with the third and fourth stories and fifth level penthouse stepped back. This stepping back of the upper floor mass provides relief to the surrounding eligible properties. The added articulation, horizontality and placement of the taller components within the site's interior, contribute to preserving the established character along Linden Street. Finally, the use of native stone and brick complement the existing structures. ILI compliance with the standard, all new pole and building -mounted light fixtures will be fully shielded and down directional. The proposed reduction in illumination after 10:00 p.m. satisfies the Alternative Compliance provision that the proposed illumination accomplishes the purposes of this Section equally well or better than would a lighting plan which complies with the standards of this Section. This is because after 10:00 p.m., there will be fewer customers using the parking lot. Further, the parking lot is safer than normal by being located and protected behind the building with limited public access. The proposed illumination after 10:00 p.m. will contribute to protecting the natural area from light intrusion. There would be no detriment to neighborhood continuity and connectivity. Opportunities for non -vehicular access are not impacted. The proposed design is innovative by reducing energy usage. P. Section 3.2.5 — Trash and Recycling Enclosures The trash and recycling enclosure is located on the southwest side of the building and screened from Linden Street by gates. The area is of sufficient size to accommodate the needs of all users. In order to protect the residences from disturbance, the pick up times have been voluntarily limited to business hours only, Monday through Friday, and between Noon and 5:00 p.m. on Saturdays and Sundays. Q. Section 3.3.1— Plat Standards The plat, titled River District Block One Mixed -Use, complies with the requirements for a legal subdivision of land. The lot fronts on a public street with the proper dedication of public right-of-way and easements for utilities. Also, drainage and emergency access easements have been provided as required by the City's Stormwater Utility and the Poudre Fire Authority. R. Section 3.4.1— Natural Habitats and Features As noted in the previous section, the buffer provisions contained in Section 3.4.1(E) are specifically exempted per R-D-R zone district standard Section 4.17(D)(1)(a) which calls for a continuous landscape buffer but does not prescribe a distance. This continuous landscape buffer would be provided as described in the preceding evaluation of Section 4.17(D)(1)(a). S. Section 3.4.1(F) — Protection of Wildlife Habitat and Ecological Character The E.C.S. does not show the existence of a plant or wildlife species identified by the City as a Sensitive or Specially Valued Species, or by state or federal agencies as "threatened," "endangered," "species of concern," or "sensitive natural community." 18 K. Section 3.2.2(C)(5) — Walkways In addition to the public sidewalk on Linden Street, there is a pathway along the River. This path will be constructed out of crusher fines as opposed to concrete to better integrate with the riparian character. L. Section 3.2.2(D)(E)(J) — Parking Lot Design As mentioned, the off-street parking is divided between 31 spaces under the structure and 34 surface spaces to the rear of the structure. Both lots gain access to Linden Street in a safe and efficient manner. There is proper separation between vehicles and bicycles and pedestrians. The surface parking design exceeds the required minimum side lot line setback of five feet. M. Section 3.2.2(K) (1) (a) 1. — Residential Parking Requirements This standard allows mixed -use dwellings within the Transit -Oriented Development (TOD) Overlay Zone to be relieved from having to provide a required minimum number of parking spaces. While not being subject to a minimum number, the P.D.P. provides 31 spaces under the structure that may be allocated, at the developer's discretion, for the 12 dwelling units. N. Section 3.2.2(K)(2) — Non -Residential Parking Requirements The number of spaces must not exceed a prescribed maximum ratio. Use Size Maximum Ratio Quantity Office 20,000 s .ft. 3/1,000 s .ft 60 Restaurant 4,400 s .ft. 10/1,000 s .ft. 44 Total Max Allowed 104 As can be seen, the P.D.P. is 39 spaces below the maximum allowed. O. Section 3.2.4 — Site Lighting The standard specifies that minimum lighting levels for parking and non- residential building surrounds are one foot-candle. This illumination level is provided with one exception. Parking lot lighting will be reduced by one-half beginning at 10:00 p.m. in consideration of both the River corridor and the residents living in close proximity to the proposed restaurant. Such reduction is allowed per the Alternative Compliance option in Section 3.2.4(E)(2). Also due to the unique location next to the River, illumination has been specifically designed not to spill over into the buffer zone. Finally, in further 17 G. Section 3.2.1(F) — Tree Protection and Replacement A Tree Mitigation Plan has been evaluated as four existing, non-native trees (Siberian Elm) would be removed. In compliance with the standard, two of the proposed street trees along Linden Street would be up -sized from two to three - inches in caliper. All other trees along the River would be preserved. A pruning schedule has been established that will allow for the following objectives: • Allow for clearance for the proposed pedestrian path; • Improve safety by removing dead and weak branches; • Removal of selected lower branches allowing for partial/filtered views; • Light thinning to improve health of the tree and improve aesthetics; • No pruning over the River. Standard tree protection notes have been added to the Landscape Plan H. Section 3.2.2(B) — Access, Circulation and Parking — General Standard In compliance with the standard, the parking and circulation system is designed to fully integrate the proposed private improvements with the public street and sidewalk system. For example, the storefronts and building entrances directly face onto the public sidewalk matching the context of the Downtown. A plaza identifies the office and proposed restaurant entrance. An outdoor dining patio is provided. A pedestrian path intersects with Linden Street. A bus stop and bench are proposed serving Transfort Routes #8 and #81. The Poudre River Trail is located on the other side of the bridge. In general, there is an emphasis on prioritizing bicycles and pedestrians by placing the parking lot under the building and in the rear of the building. Section 3.2.2(C) — Development Standards The public sidewalk along Linden Street ranges in width from 5'8" where it becomes attached to the street at the bridge to 9'9" feet not including the plaza. The sidewalk features street trees in grates, raised planters, planter pots and pedestrian lighting. J. Section 3.2.2(C)(4) — Bicycle Facilities The standard in place at the time the project was submitted (July 17, 2012) required that the minimum number of bicycle parking spaces be no less than 10% of the vehicle spaces. With 65 vehicle spaces, 7 bike parking spaces are required. The P.D.P. provides 26 bike parking spaces thus exceeding the standard. Of this total, 22 are located within the parking garage and four are in fixed racks along Linden Street. 16 that will form a continuous buffer at maturity. The plants selected exceed the minimum species diversity requirement and meet or exceed minimum size standards. B. Section 3.2.1(E)(1) — Buffering Between Incompatible Uses and Activities Based on the requirements of the R-D-R zone district standards and the recommendations of the E.C.S., the landscape plan emphasizes the transition from the established urban character along Linden Street to riparian character along the River. As mentioned, the formal row of street trees transition into naturalistic plantings beginning at the edge of the garage entrance. Along the River, the plants are specifically selected to complement and enhance the riparian character. The species, size, quantity and location are intended to create an extension of the existing ecology so that the proposed development blends in with native landscaping thereby contributing to the buffering and the natural feel along the embankment. C. Section 3.2.1(E)(3) — Water Conservation The site has been divided among three hydrozones and, per the standard; the overall annual water use does not exceed 15 gallons per square foot over the course of one growing season. D. Section 3.2.1(E)(4) — Parking Lot Perimeter Landscaping The surface parking lot contains 34 spaces, is located to the rear of the building and will not be visible from Linden Street. The 13 spaces that face the River are screened by a continuous row of trees and shrubs all of which exceed 30-inches in height and extend 100% of the length. The 13 spaces that face Ranch -Way Feeds are at a lower topographical elevation, built into the grade and are screened with a retaining wall and combined with a continuous row of trees and shrubs for 100% of the length. E. Section 3.2.1(E) (5) — Parking Lot Interior Landscaping The parking lot landscaping provides 14% interior landscaping in the form of islands thus exceeding the standard of 6%. In addition, there are 12 canopy shade'trees which exceed the standard by one. F. Section 3.2.1(E)(6) - Screening The trash and recycling enclosure and electrical transformer are located along the southwest edge of the building and are screened by a solid decorative fence. 15 T. Section 4.17(D)(4)(a) — Site Design — Naturalistic Landscaping The natural qualities of the River landscape shall be maintained and enhanced, using plants and landscape materials native to the River corridor in the design of site and landscape improvements. The selection of plant material along the river has been carefully evaluated to complement the native vegetation, create a variety of heights and to enhance wildlife habitat. In compliance with the standard, the following plants would be placed along the Poudre River: Trees: Lanceleaf Cottonwood, Autumn Brilliance Serviceberry, American Plum. Shrubs: Chokecherry, Golden Currant, Crandall Clove Currant, Wax Currant, Potentilla, Rabbitbrush, Sandcherry, Serviceberry, Snowberry, Grasses: Blue Gama, Prairie Dropseed, Switchgrass, native seed. These trees, shrubs and grasses are classified as being in the moderate hydrozone. They are drought -tolerant, native plants that will maintain and enhance the River corridor. U. Section 4.17(D)(4)(b) — Site Design — Walls, Fences and Planters Walls, fences and planters shall be designed to match or be consistent with the quality of materials, the style and colors of nearby buildings. Brick, stone or other masonry may be required for walls or fence columns. Along the river, there is a planter attached to the building and a portion of the building's exterior that would be constructed of native stone (Masonville Sandstone). Along the south elevation, there is a wall that would be constructed of brick that screens the trash and recycling enclosure and mechanical equipment. There are no fences associated with the project. 5. Article Three Applicable General Development Criteria: A. Section 3.2.1(D) — Tree Planting Standards Four street trees placed in grates are provided in the public right-of-way along Linden Street spaced on roughly 40-foot intervals. Along the River, the formal row of street trees gives way to naturalistic plants that complement the native ecology. The River will be buffered by native deciduous trees, shrubs and native seed to create a riparian and upland riparian habitat as recommended by the Ecological Characterization Study (E.C.S.). Along Ranch -Way Feeds., the parking lot is screened by existing grade and a combination of trees and shrubs 14 commercial, there are street -facing store -front windows. For the residential, there are aluminum clad wood windows with transoms at the fourth story. R. Section 4.17(D)(3)(d)4. — Character and Image — Rooflines A minimum pitch of 8:12 shall be used for gable and hip roofs to the maximum extent feasible. Where hipped roofs are used alone, the minimum pitch shall be 6:12. Flat -roofed buildings shall feature three-dimensional cornice treatment on all walls facing streets, the river or connecting walkways, unless they are stepped and terraced back to form a usable roof terrace area(s). A single continuous horizontal roofline shall not be used on one-story buildings except as part of a design style that emulates nearby landmarks (or structures eligible for landmark designation). There are a variety of roof forms associated with the building. For the standard restaurant, there is a flat roof that supports an outdoor terrace. For the restaurant and office combined, there is a sloping roof that allows for day -lighting and screening of mechanical equipment. For the residential, there is predominantly a flat roof at the fourth story, which is punctuated by a fifth floor penthouse (loft space for the fourth floor unit) featuring a pitched roof. S. Section 4.17(D)(3)(e) - Materials Textured materials with native and historic characteristics such as brick, stone and wood, and materials with similar characteristics and proportions shall be used in a repeating pattern as integral parts of the exterior building fabric, to the maximum extent feasible. Other exterior materials, if any, shall be used as integral parts of the overall building fabric, in repeating modules, proportioned both horizontally and vertically to relate to human scale, and with enough depth at joints between architectural elements to cast shadows, in order to better ensure that the character and image of new buildings are visually related to the Downtown and River context. The building would incorporate a variety of materials that are intended to establish a complementary relationship to both the Downtown and River context. For example, along Linden Street, the Downtown character is continued by use of native stone, traditional store -fronts with entrances accented by use of steel canopies. Structural steel columns are exposed to complement the canopies and to reflect the industrial historic character of the area. The second floor features a brick exterior combined with painted hardee board siding with aluminum reveals and fiber cement panels. The third and fourth floors feature fiber cement panels and balconies. Along the river, the exterior materials would include native stone, board formed concrete and store front glazing. In general, the building positively relates to the established context of both the Downtown and R-D-R zone. 13 • Along Linden Street, the building features store -front architecture which contributes to pedestrian interest and an inviting streetscape. • For vertical relief, there is native stone and storefront glass at the base, a brick field with balconies in the middle, and fiber cement panels on the upper floors. • For horizontal relief, there is a large glass area on the left, native stone and two entrances in the middle and the residential entrances on the right. • Overall, the building is divided into three distinct functions — office, commercial and residential with each function having its own distinct features. • In summary, the building provides for both vertical and horizontal relief and there is a clear distinction among the base, middle and top of the structure. P. Section 4.17(D)(3)(d)2. — Character and Image — Outdoor Spaces Buildings and extensions of buildings shall be designed to form outdoor spaces such as balconies, arcades, terraces, decks or courtyards, and to integrate development with the landscape to the extent reasonably feasible. Along Linden Street, the building entrances and walkway are elevated above the street in a terrace -like manner and highlighted by a plaza. Along the river, there is a deck above the one-story building component. In the rear, there is a terrace facing south. For the upper residential stories, there are a variety of balconies creating private outdoor space. Q. Section 4.17(D)(3)(d)3. — Character and Image — Windows Windows shall be individually defined with detail elements such as frames, sills and lintels, and placed so as to visually establish and define the building stories and establish human scale and proportion. Glass curtain walls and spandrel - glass strip windows shall not be used as the predominant style of fenestration for buildings in this District. This requirement shall not serve to restrict the use of atrium, lobby or greenhouse -type accent features used as embellishments to the principal building. There are three types of windows each associated with the primary function of the three uses within the building; office, commercial and residential. For the office component, there are traditional windows combined with day -lighting windows at the upper portions of the north -facing second story. For the 12 Of the 65 total parking spaces, 31 are located below the structure in a parking garage. The remaining 34 spaces are in a surface lot at the rear of the building. Access to the surface lot can only be gained from the parking garage. M. Section 4.17(D)(3)(c)3. — Massing and Placement — Street Frontage Proposed parking lots and/or vehicular use areas located within fifty (50) feet of any street right-of-way shall not exceed fifty (50) percent of the street frontage of the parcel upon which the parking lot or vehicular use area is proposed. Since all parking is either within the garage or to the rear of the building, there is no private parking lot along Linden Street. (There is on -street diagonal parking in the public right-of-way.) The entrance to the garage is considered a vehicular use area and is 20 feet wide which is only 9.3% of the total lot frontage of 214 feet. N. Section 4.17(D)(3)(c)4. — Massing/Placement— Frequent Views/Access No building wall shall exceed one hundred twenty-five (125) feet on the axis along the River. The proposed building is 97 feet in length on the axis along the river. O. Section 4.17(D)(3)(d)1. — Character and Image — Articulation Exterior building walls shall be subdivided and proportioned to human scale, using offsets, projections, overhangs and recesses, in order to add architectural interest and variety and avoid the effect of a single, massive wall with no relation to human size. The proposed building includes articulated features that break up the mass and add character to the area. The building features four-sided architecture so there is no back -side where inferior materials are used. Along Linden Street, the building is characterized by the following: • The building is divided into two distinct modules connected by a first floor lobby and a second floor bridge. • The westerly module is four stories in height as viewed from Linden Street on the front and five stories as viewed from the parking on the rear. The third and fourth stories of the western module are stepped back from the first and second stories helping to reduce the mass along the street. • The easterly module includes a two story element that slopes down to a one story element along the river. (3.) Section (C)(2) — Entrances relate to the organization of interior space and are not cosmetic. There are no false fronts or parapets. (4.) Section 3.5.3(D) — The building includes articulated facades on all four sides. There is no blank wall along the street. (5.) There are steel canopies over the entrances and no awning is longer than a single storefront. (6.) The building features a recognizable base of native stone and storefront glazing and entrances. There is a recognizable top with a sloping roof on the east side and a flat roof with penthouse on the west side. K. Section 4.17(D)(3)(c)1. — Massing and Placement — Height/ Mass Multiple story buildings of up to five (5) stories are permitted, however, massing shall be terraced back from the River and from streets as follows: (1) buildings or parts of buildings shall step down to one (1) story abutting the River landscape frontage; and (2) buildings or parts of buildings shall step down to three (3) stories or less abutting any street frontage. The building is terraced in the following manner: • Along the river, along a portion of the east side of the building, there is a one-story component at grade level. The site slopes down from the front along Linden Street into the parking garage and out to the rear of the parcel featuring the surface parking lot. The one-story building along the river is gradually revealed the further it moves_away from Linden Street much like a walk -out basement as viewed from the side property line. This one-story houses an office and bicycle storage room. On top of this one-story building is a small terrace which is not considered a story. • Along Linden Street, the building is five stories. The fifth story is a loft for the fourth floor unit. Floors three and four stepped back from floor two by eight feet. L. Section 4.17(D)(3)(c)2. — Massing and Placement— Parking Lots Buildings shall be sited so that any new parking lots and vehicle use areas are located in either: (1) interior block locations between buildings that face the street and buildings that face the River, or (2) side yards. 10 The P.D.P. would complete the public street improvements as well as the enhanced streetscape features that were installed in 2012 by the City of Fort Collins and the Downtown Development Authority. These improvements were intentionally terminated at the west property line of the subject parcel due to the anticipation of pending redevelopment of the subject parcel. H. Section 4.17(D)(2)(c) — Jefferson Streetscape Improvement Details Redevelopment activity along the Jefferson Street frontage shall provide formal streetscape improvements including street trees in sidewalk cutouts with tree grates and planters to screen parking. Planters to screen parking shall be designed and constructed to appear as integral extensions of the building design. Materials used shall not be inferior to those used in the construction of the principal building. The P.D.P. does not front on Jefferson Street but incorporates the design attributes of the public capital project (completed in 2011) along Linden Street by including decorative pavements, benches, street trees in protective grates, planters and trash and recycling receptacles that are consistent and of equal quality. Section 4.17(D)(3)(a) — Buildings — Landmarks Exception Changes or additions to structures or properties designated (or determined by the Landmark Preservation Commission to be eligible for designation) as landmarks in accordance with Chapter 14 of the City Code shall be permitted to emulate the shapes, sizes, proportions, heights, patterns and materials of the landmark (or eligible) structure(s) rather than being required to conform to the standards for buildings contained in this subsection (3). The P.D.P. proposes to construct a new building. The existing warehouse would be removed and is not eligible for local landmark designation. J. Section 4.17(D)(3)(b) — Industrial and New Non-residential Buildings Except as otherwise provided in this subsection (3), all new nonresidential buildings, including industrial buildings, shall comply with the standards for Mixed -use and Commercial Buildings contained in Section 3.5.3. (1.) Section 3.5.3(13)(2)(b) — The building is located at the property line thus complying with the standard that it be placed no further back than 15 feet. (2.) Section 3.5.3(C)(1) — The building is varied in height and includes projecting and recessed elements that break up the mass. 9 The primary elements of the bank stabilization are stone, buried riprap, backfill and geotextile fabric, mechanically stabilized earth and vegetated reinforced soil slopes. No new trees are planned for the stabilization program as they would threaten the stability of the bank. Instead, a mix of willows, grasses and sedges will be planted as groundcover that promotes the riparian habitat. There are no concrete or blank walls associated with the stabilization plan. E. Section 4.17(D)(1)(b) — Outdoor Spaces and Continuous Walkway On sites that have River frontage between Linden Street and Lincoln Avenue, buildings or clusters of buildings shall be located and designed to form outdoor spaces (such as balconies, arcades, terraces, decks or courtyards) on the River side of the buildings and/or between buildings, as integral parts of a transition between development and the River. A continuous connecting walkway (or walkway system) linking such spaces shall be developed, including coordinated linkages between separate development projects. The P.D.P. provides the following features in compliance with the standard: • Outdoor plazas and seating areas at grade; • Terrace seating on deck above grade -level one-story; • Courtyard spaces; • Soft walking path by the river connecting to Linden Street; • All elements are interconnected. F. Section 4.17(D)(2)(a) — Street Connections — Maintain Existing Block Grid System Redevelopment shall maintain the existing block grid system of streets and alleys. To the extent reasonably feasible, the system shall be augmented with additional connections, including new walkway spines in substitution of streets and/or alleys. The P.D.P. does not include any new streets or alleys. As mentioned, a soft path would be provided along the river at the top of the embankment. G. Section 4.17(D)(2)(b) — Linden Streetscape Improvements Redevelopment activity along the Linden Street frontage shall be designed to provide for the extension of the streetscape improvements found between Walnut Street and Jefferson Street, including on -street parking defined by landscaped curb extensions, wide sidewalks with trees in cutouts and tree grates, and pedestrian light fixtures. Specific design details are subject -to approval by the City Engineer in accordance with the design criteria for streets. 8 The landscape buffer protects the ecological character of the natural habitat of the Poudre River from the impacts of the proposed development. Overall, in the area along the river, four existing trees will be removed and 12 new trees and 213 plants, divided among shrubs, ornamental grasses, perennials, groundcovers and vines, will be added. This will result in a wider riparian corridor and enhance the habitat and opportunities for wildlife. C. Section 4.17(D)(1)(a)1. — Bank Stabilization Improvements Any bank stabilization improvements shall consist of native plants and stone to the extent reasonably feasible. If any structural materials such as concrete are required, such materials shall be designed to emphasize characteristics of the native landscape such as color, texture, patterns and proportions, in order to minimize contrast with the River landscape. The design of the bank and slope stabilization is based on the Cache La Poudre River Bank Stability Evaluation prepared by the applicant. (Summary attached.) The recommendations, working from the toe to the top of the bank include: • Re -grading the embankment to a flatter slope; • Removal of old concrete spoils; • Toe stabilization using appropriately sized large rock boulders anchored into bedrock; • Adding boulders in a dry stack, combined with geotextile fabric and backfill, to further enhance toe stabilization, including using mechanically stabilized earth and vegetated reinforced soil slopes; • Hard armoring with buried riprap; • Single or stacked boulders combined with backfill; • Willow plantings. The stream bank stabilization program is in accordance with Poudre River Enhancement Project, an addendum to the Poudre River Drainage Master Plan, which documents the stabilization improvements as well as describing ecological and recreational enhancements, adopted in 2003. (Please see attached.) Further, all proposed improvements have been specifically designed to withstand the 100-year flood (a flood event that has a 1 % chance of occurring in any one year, and for this reach of the Poudre River, capable of conveying carrying approximately 13,300 cubic feet per second.) D. Section 4.17(D)(1)(a)2. — Bank Stabilization Visual Elements The predominant visual elements in any bank stabilization improvements shall be native vegetation and stone, notwithstanding the use of any integrated structural elements. Blank walls shall not be used to retain the slope of the River bank. and unique relationship between the waterway and surrounding urban environment, and maintaining those natural elements of the river as it passes through Downtown." In fulfillment of City Plan, the proposed P.D.P. redevelops a former concrete batch plant and enhances the relationship to the River with a continuous landscape buffer. The site is located within the Targeted Infill and Redevelopment Area and the P.D.P. would strengthen the connection between the Downtown and the River. 4. Article Four — Applicable R-D-R Zone District Standards: A. Section 4.17(B)(2) — Permitted Uses The residential dwelling units are classified as Mixed -Use Dwellings because they are located within a building containing two distinct uses, and are permitted in the zone, subject to administrative review. Similarly, Office and Standard Restaurant are also permitted subject to administrative review. B. Section 4.17(D)(1)(a) — Transition between the River and Development — River Landscape Buffer In substitution for the provisions contained in Section 3.4.1(C) (Natural Habitats and Features) requiring the establishment of "natural area buffer zones, " the applicant shall establish, preserve or improve a continuous landscape buffer along the River as an integral part of a transition between development and the River. To the maximum extent feasible, the landscape buffer shall consist predominantly of native tree and shrub cover. (See Figure 20.) The landscape buffer shall be designed to prevent bank erosion and to stabilize the River bank in a manner adequate to withstand the hydraulic force of a 100-year flood event. As stated in the Phase I Environmental Assessment, the property contains one building and consists of graded, unimproved land with a remnant concrete parking lot located on the eastern portion of the Property. Presently, there is minimal habitat value because of surrounding development and lack of a wide riparian corridor. No raptor or songbird nests have been found on the site. In compliance with the Code, there is a continuous landscape buffer along the river on both the subject property and the City -owned embankment (within a pending easement to be granted by the City). Plant selection was based on qualities that promote native landscaping, habitat cover and bank stabilization features. The quality and extent of site improvements are based on the results of the Ecological Characterization Study, prepared by the applicant. (Please see attached). For example, the trees and shrubs will be provided in sufficient quantity along with a variety of plant heights thereby enhancing habitat diversity. 6 The intent is to bring patrons downtown with development that reinforces the unique historic and environmental character." "2.2.5 Encourage apartments, loft units, and/or offices on upper floors of buildings." "a. Any additional housing and jobs will help support the core by adding to a critical mass of people living, working, and investing in downtown." In fulfillment of the vision for Downtown, the proposed P.D.P. would contribute to establishing a pedestrian and visual connection between the River and the Downtown along Linden Street. The proposed treatment along the river would provide additional landscaping and be compatible with the scenic, natural, recreational values of the river. The proposed land uses would add to the mix of activities associated with Downtown. Further, the P.D.P. represents a re -development opportunity that offers a mix of core -supportive uses. The addition of housing and jobs will contribute to the critical mass of people living and working and investing in downtown. 3. City Plan Fort Collins — 2011: The comprehensive plan was updated in 2011. While the proposed project furthers the objectives of numerous policies, three are highlighted for emphasis: "Policy ENV 24.4 Restore or enhance degraded or disturbed areas of the Poudre Rive Corridor to improve natural habitat conditions, biodiversity, and aesthetic and recreational values. Restoration and enhancement projects may be performed cooperatively with adjacent private landowners and.volunteer community groups." "Policy LIV 5.1 Encourage redevelopment and Infill in Activity Centers and Targeted Infill and Redevelopment Areas. Areas identified on the Targeted Infill and Redevelopment Areas Map are parts of the city where general agreement exists that redevelopment and infill would be beneficial. " "Policy LIV 45.3 The Poudre River Corridor has distinct segments containing unique characteristics, opportunities, and constraints. The Historic and Cultural Core Segment (College Avenue to Lemay Avenue) segment of the river includes many of the community's oldest and most significant historic and cultural features. Land uses in the area should be more flexible than in other river segments and emphasize connecting the river to Downtown, providing multi -purpose spaces that celebrate the historic relevance of the river to the community, continuing the important 5 addition, special treatment of the riverfront is suggested that enhances the attractiveness of the river and Downtown. The plan offers some specific activities for the riverfront area, including a new performing arts theatre, an open air amphitheater, botanical gardens, preservation of important natural areas, quality hotel, active and passive open space areas and limited retail activities." (Page 58.) Under the section titled Policy 2, Land Use: "Permit destination retail uses, light manufacturing, research and scientific laboratories and similar uses in locations within the Poudre River Corridor District that are compatible with the scenic, natural, recreational values of the river." (Page 69.) "Encourage the development of a special riverfront area that mixes hospitality, hotel, recreation, entertainment, culture, and some limited retail land uses in the Poudre River Corridor District and being especially sensitive to the natural area features of the river. Specific activities which should be encouraged in this area include a new performing arts theatre, an open air amphitheater, botanical gardens, preservation of important wetlands and vegetation, and water related recreation." (Page 70.) Under the section titled Policy 3, Special Land Use Opportunities, Major Policy: "Aggressively explore, develop and take action to attract major retail, government, cultural, educational, entertainment, recreation and employment anchors including new housing development, that enhance the Downtown as the preeminent business, retailing and cultural center of region." (Page 72.) The Downtown Strategic Plan, 2006, states the following: "2.1.2 Relative to the west side, the river corridor area presents a different, additional set of opportunities for supportive redevelopment, which the City and DDA should remain equally prepared to pursue or support if an initiative arises. Redevelopment projects in the river area could strengthen the commercial health of downtown as well, and if a core - supportive development project or public works stimulus project emerges, it should be supported." "2. Particular core -supportive uses include housing, employment, mixed live/work buildings, special attractions and architecture unique to the river environment and historic setting(e.g. cultural/arts venues, a restaurant with windows and outdoor spaces oriented to the river landscape, educational institutes) and small neighborhood -serving commercial uses. 4 warehouse building located on the southern portion, and a parking area located on the northern and eastern portions of the Property." "The warehouse building was historically utilized for vehicle maintenance activities with fueling operations conducted along the northwestern exterior of the subject building. According to historical city directories, the Property was occupied by the Poudre Pre -Mix Inc. from at least 1962 through 2009. According to an interview conducted with the Property Owner, Mr. Tom Chandler, Poudre Pre -Mix, Inc. began operation at the Property in 1959. Based on the review of City of Fort Collins Building Department records, the office building, sheds, railcar, and cement manufacturing equipment were removed from the Property in 2011." "The subject building is currently utilized by Ranch -Way Feeds for the storage of livestock feed supplies. The remainder of the Property consists of graded, unimproved land with a remnant concrete parking lot located on the eastern portion of the Property." The site was originally zoned I-G, General Industrial. In 1996, the site was included in a larger rezoning that downzoned the general area bounded by North College Avenue, Jefferson Street, Lincoln Avenue and the Poudre River from I-G, General Industrial to R-C, River Corridor as part of the implementation of the Downtown Plan. In 1997, the site was rezoned R-D-R, River Downtown Redevelopment as part of the overall implementation of City Plan, the City's comprehensive plan. The site was placed into the Transit -Oriented Development Overlay District (T.O.D.) upon the original adoption of the District in 2007. 2. Downtown Plan: Although not zoned D, Downtown, the site is located within the boundary of the Downtown Plan originally adopted in 1989 and amended in 2006. The parcel is also located within the area covered by the Downtown River Corridor Implementation Program, approved in 2000. The subject parcel is located within a larger area identified as a Special River Area on the fringe of the Downtown. The Downtown Plan (1986) Concept Plan states the following: "The Downtown Corridor of the Poudre River is viewed in the plan as a fragile, valuable and irreplaceable resource. Major pedestrian and visual connections between the River and the Downtown are recommended. In 3 Staff is recommending two conditions of approval. The first condition addresses the requirement that should the P.D.P. and Final Plan be approved, the applicant must obtain from the Federal Emergency Management Agency approval of a Conditional Letter of Map Revision and a Letter of Map Revision in order to update the floodplain maps to reflect the results of the proposed bank stabilization project. Y4 The se�fcond condition addresses the proper timing and processing of the City Council granting an easement for the building encroachment into the public right- of-way. COMMENTS: 1. Background: The surrounding zoning and land uses are as follows: N: P-O-L, Public Open Lands; Heritage Park; N.E.: P-O-L, Public Open Lands; Gustav Swanson Nature Area; N.W.: R-D-R, River Downtown Redevelopment; Multi -family (Legacy Senior Apartments — under construction); S: R-D-R, River Downtown Redevelopment; Existing Industrial (Ranch -Way Feeds); E: C-C-R, Community Commercial — Poudre River District; Poudre River, Bike Trail and Vacant (approximately 20 acres commonly referred to as the "Oxbow"); W: R-D-R, River Downtown Redevelopment; Existing Industrial (Ranch -Way Feeds). According to the Phase I Environmental Assessment, prepared by National Inspection Services: "According to the Larimer County Assessor, the current warehouse building was improved on the Property in 1948. According to historical aerial photographs, the Property was improved as early as 1956 and consisted of a concrete manufacturing facility through at least 2009. The facility consisted of the cement manufacturing operation with associated equipment and an aboveground storage tank containing calcium chloride (concrete accelerator) located on the northern portion, an office building and railcar located on the central and southern portions, the current 2 of Frt� Collins .1EMNO 2 MEETING DATE tI A&c%ta-1 010.3 STAFF -TEn _S ftre,4t_p HEARING OFFICER PROJECT: Encompass, River District Block One, 418 Linden Street, P.D.P, #PDP120020 APPLICANT: Nine Fish, LLC c/o Encompass c/o BHA Design 1603 Oakridge Drive Fort Collins, CO 80525 OWNER: Nine Fish, LLC 324 Jefferson Street Fort Collins, CO 80524 PROJECT DESCRIPTION: This is a request to redevelop a former industrial site adjoining the Poudre River for a mixed -use project consisting of general office, standard restaurant and multi -family residential containing a total of 36,990 square feet. The building would contain 20,000 square feet of general office, 4,400 square feet of standard restaurant and 12 dwelling units. Parking is divided between a surface lot and under the structure with a total of 65 spaces. The parcel is located at 418 Linden Street on the west side of the river. The site contains 1.03 acres, is zoned R-D- R, River Downtown Redevelopment District, and is within the Transit -Oriented Development Overlay Zone. RECOMMENDATION: Approval with two conditions. EXECUTIVE SUMMARY: The P.D.P. complies with the Downtown Plan as adopted in 1986, and as amended in 2006, and City Plan as adopted in 2011. The P.D.P. also complies with the permitted uses and development standards of the R-D-R zone. Further, the P.D.P. complies with the general development standards of Article Three. Current Planning 281 N College Av PO Box 580 Fort Collins, CO 80522-0580 fcgov.com/currentplanning 970.221.6750