HomeMy WebLinkAboutPOUDRE FIRE AUTHORITY STATION FOUR - PDP - 33-08 - CORRESPONDENCE - (6)Respectfully,
Pat, 0 Oak,
Patti Watkins
Belford Watkins Group Architects
Cc Bob Poncelow
Ron Kechter
Bob Ahnirall
Tam Wahl
Ron Boone
Building Inspection — Rick Lee
See attached codes and standards. Please schedule a pre -submittal code review
meeting as noted.
A pre -submittal code review meeting has been accomplished.
Water Conservation
The landscape plan shall contain a general note calling for the review and approval
by the City of Fort Collins of any required landscape irrigation system, prior to the
issuance of a Building Permit.
The landscape plan shall include the total area (in square feet) for each landscape
category. Landscape categories are distinguished by their water requirements and
intended maintenance level. Examples of possible categories include, but are not
limited to, high water turfgrass, low water turfgrass, low water planting beds,
moderate water planting beds, and non -plant areas (paved areas, etc.).
Added to notes and drawings. The irrigation system will be a designlbuild
approach for this project and therefore, the final irrigation design will be
provided by the irrigation contractor. A copy of the irrigation plan will be
submitted for review when made available by the contractor.
Technical Services
The boundary on the plat closes good; area good; area = total area of Tracts A, B,
C. No Problem.
The legal does not describe the overall boundary only the Tracts A, B, C. No
Problem.
Per Lindsey Kuntz City of Fort Collins Real Estates Services requests, that
portion of Tract B is NOT A PART of this subdivision.
Park Planning — Craig Forman
We would like to work on a sidewalk connection from the trail to Drake. Potential
to adjust the Spring Creek Trail further from Spring Creek and a trail resting site.
It is anticipated the trail connection will occur across Lot 1. PFA has met
with Craig Forman regarding this and come to an agreement that, once the
city has ascertained a preferred alignment for the connection, PFA will
provide an easement for the trail connection and the City of Fort Collins will
install the trail connection improvements. Please see attached letter from
PFA to Craig Forman.
Tim Buchanan
These notes should be added to the landscape plan:
• The soil in all landscape areas, including parkways and medians, shall be
thoroughly loosened to a depth of not less than eight (8) inches and soil
amendment shall be thoroughly incorporated into the soil of all landscape
areas to a depth of at least six (6) inches by tilling; disking or other suitable
method, at a rate of at least three (3) cubic yards of soil amendment per one
thousand (1,000) square feet of landscape area.
• Landscaping in the median and parkway will be fully restored. The
irrigation main shall be extended under the new cut. Irrigation heads and
laterals will be repaired. Disturbed surface areas in the median will be re -
mulched, and those in the parkway will be fine graded and sodded. Median
and parkway landscaping will be coordinated with the Parks Department
(221-6660).
• Change landscape note number 5 to read as follows"
Contractor shall install chipper mulch to a minimum depth of..... (the rest
of statement 5 is o.k.) Add this sentence at the end of 5. "Chipper mulch
shall be provided at no cost by the City of Fort Collins Forestry
Division 413 S. Bryan."
The indicated revisions have been added to the landscaped plans.
This note has been added to the plat.
3. The potential location of the Spring Creek Trail connection needs to be
coordinated with Craig Foreman of the Parks Planning Department.
It is anticipated the trail connection will occur across Lot 1. PFA has
met with Craig Forman regarding this and come to an agreement that,
once the city has ascertained a preferred alignment for the connection,
PFA will provide an easement for the trail connection and the City of
Fort Collins will install the trail connection improvements. Please see
attached letter from PFA to Craig Forman.
Comments from Historic Preservation:
1. The existing buildings are not registered as historic on the local, state or
federal level. If they are to be demolished, the buildings need to be documented
prior to demolition. For further information, please contact Karen McWilliams,
Advance Planning, 221-6376.
The existing buildings on Lot 1 will not be addressed as part of the fire
station development.
Other Comments
Assessor — Steve Miller
I have reviewed the above mentioned preliminary plat. In the narrative description
of TRACT B, under the statement of ownership and subdivision, the legal is
missing two dimension calls. From the line table, line 18 and line 19 are missing
from the narrative.
Per Lindsey Kuntz City of Fort Collins Real Estates Services requests, that
portion of Tract B is NOT A PART of this subdivision. Therefore those
dimensions have been removed from the property description.
Number:15 1 Created:ll/6/2008
[11/6/08] Please note building dimensions, footprint and distance to property lines
on the site plan.
Additional dimensional information has been added to the enclosed site plan.
Number: 16 Created: I 1 /6/2008
[11/6/08] Please call out typical parking stall dimensions on the site plan
Dimensional information has been added to the parking stalls on the enclosed
site plan.
Number: 17 Created: l l /6/2008
[11/6/08] Landscape plan - please add standard note to plan regarding installation
of landscaping prior to issuance of CO.
Standard installation note has been added to. the enclosed landscape plan.
Number: 18 Created: 11 /6/2008
[11/6/08] Please add counts per item to the plan - not just in the key. I would also
recommend re -considering and reviewing the two tree, shrub planting areas. Seems
to be over done and in a couple of years will just look overgrown and maintenance
will be an issue.
Detailed planting plan enlargements have been included in this submittal for
ease of review. Planting bed mentioned above has been reworked.
Comments from Current Planning:
1. Be sure to indicate the buffer line on the plat, and include a plat note as to
what uses are allowed inside the buffer area.
The environmental buffer is indicated on the enclosed plan and
noted as to allowed uses.
2. Please add the following note to the plat:
"Private Conditions, Covenants, and Restrictions (CC&R's), or any other private
restrictive covenant imposed on landowners within the development, may not be
created or enforced which has the effect of prohibiting or limiting the installation of
xeriscape landscaping, solar/photo-voltaic collectors (if mounted flush upon any
established roof line), clothes lines (if located in backyards), odor -controlled
compost bins, or which has the effect of requiring that a portion of any individual
lot be planted in turf grass."
Number: 9 Created: 11 /6/2008
[11/6/08] Please remove word "relocation" from the plans as this is not a relocation
of the original building - that building is not moving - this is new development and
construction.
"Relocation " has been changed to "Replacement ".
Number: 10 Created: 11 /6/2008
[11/6/08] Please provide a west elevation of the building.
A west elevation is now included on the enclosed plans.
Number: 11 Created: 11 /6/2008
[11/6/08] The handicap parking space needs to be an overall width of 16'. When
there is only one HC space, it needs to be Van -accessible which is 16' wide with a
sign at the front of the space noting HC and Van Accessible.
The handicap parking stall has been revised on the enclosed plans and
handicap signage indicated. The width of the stall is eight feet with an
adjacent, eight foot loading zone. A portion of the entry sidewalk is used as
part of the loading zone width.
Number: 12 Created: 11 /6/2008
[11/6/08] Provide and show handicap ramp at handicap parking space.
There are no curbs between the handicap parking space and the building
entry or between the space and the ramp leading to the lower level therefore
a ramp will not be required.
Number: 13 Created: 11 /6/2008
[11/6/08] Will there be a connection to the Spring Creek bike path?
It is anticipated the trail connection will occur across Lot 1. PFA has met
with Craig Forman regarding this and come to an agreement that, once the
city has ascertained a preferred alignment for the connection, PFA will
provide an easement for the trail connection and the City of Fort Collins will
install the trail connection improvements. Please see attached letter from
PFA to Craig Forman.
Number: 14 1Created: l l /6/2008
[11/6/08] Please remove landscaping from the site plan and just show on the
landscape plan.
Landscaping has been removed from the enclosed site plan.
Number: 40 Created: 11 / 14/2008
[11/14/08] At final compliance, documentation is needed to make sure flows that
travel east on the south side of Drake Road do not turn into the site at the driveway
for the 100-year storm.
Additional spot elevations have been added to the Grading Plan and
calculations are provided in the Drainage Report to ensure the runoff will
continue east and not enter the site.
Department. Stormwater-Water-Wastewater
Issue Contact: Roger Buffington
Topic: Water/Wastewater
Number: 5 Created: 11/5/2008
[11/5/08] At final compliance, label all fittings, valves, etc. as noted on the redlined
plans.
Redlined comments are reflected on the enclosed plans.
Department: Zoning Issue Contact: Jenny Nuckols
Topic: ZONING
Number: 6 Created: l l /6/2008
[11/6/08] Please remove topo lines from site plan.
Topographical information has been removed from the site plan.
Number: 7 Created: 11 /6/2008
[11/6/08] I don't see any exterior lighting noted on the building elevations. If there
is proposed to be any, please show on elevations and provide a description. Note -
lighting needs to be fully shielded and down directional.
Elevations have been revised to include exterior, building attached light
fixtures. Building mounted and pole mounted fixtures will be shielded, cut-off
type fixtures. Additionally, pole lights adjacent"to the east property line will
have house -side shields.
Number: 8 Created: 11 /6/2008
[11/6/08] The site is in the neighborhood sign district. If any signage is proposed
to be on the building, please show signage locations - not actual signage, just the
locations.
No building mounted signage is scheduled. However, a monument sign is
scheduled near the property entry. Please see information included on the
enclosed plans and the attached monument sign elevation.
Number: 37 Created: 11/14/2008
[11/14/08] A floodplain use permit is required for the construction activities within
the floodplain. A no -rise certification is required after construction and before the
CO for the building is released. The Floodplain Use Permit and No -Rise
Certification form are included with the redlines.
The floodplain use permit is required for work to be completed within the
established floodplain. This includes landscaping, detention pond and the
sanitary sewer connection. The no -rise certification would be provided at the
completion of construction but only if work is to be performed in the
floodway, which is not proposed with this project.
Number:38 . Created: 11/14/2008
[11/14/08] Please make changes to the text of the drainage report per redlines.
The enclosed drainage report has been updated per the redlines.
Number: 39 Created: 11/14/2008
[11/14/08] Please address comments on the Floodplain 50% Checklist which is
included with the redlines.
Comments on the checklist have been addressed on the plans.
Topic: Stormwater
Number: 34 Created: 11/14/2008
[11/14/08] The flows near the east property boundary need to be contained on -site
and directed to the detention pond. Please provide a swale or other conveyance
element near the property boundary to keep all of these flows from entering the
property to the east.. ,
Revisions have been made to the grading plan to control and convey storm
water flows along the east property line.
Number: 35 Created: 11/14/2008
[11/14/08] The outfall for the detention pond needs to be coordinated between all
parties involved to make sure the effects on Spring Creek are mitigated. This can
be done at final compliance.
Revisions have been made to the detention pond outfall pursuant to
conversations with City Stormwater and Natural Resources. The pond outfall
will be a shallow and broad swale to direct runoff toward Spring Creek with
minimal impact to natural vegetation..
Number: 31 Created: 11/12/2008
How will the public access the community room? Standards would require
construction of a left turn lane on Drake for an access point open to the public.
Even without public access a left turn lane would be desirable for safety during left
turn ingress by emergency vehicles.
A left hand turn lane at westbound Drake has been approved by the City
Traffic Engineer. Please see enclosed plans.
Number: 32 Created: 11/12/2008
If a left turn lane is not constructed the width of the median cut should be checked.
It may not be wide enough to accommodate a left turning fire truck.
The width of the median cut has been revised with the addition of the turn
lane.
Department: Transportation Planning Issue Contact: Jennifer Petrik
Topic: General
Number: 27 Created: 11/12/2008
[11/12/08] Please show proposed sidewalk connection to visitor's entrance.
A sidewalk connection has been added to connect pedestrians from the public
walk at Drake to the main entrance. This walk consists of a combination of a
sidewalk through landscaped areas and stripped route designations across
drives and aprons.
Number: 28 Created: 11/12/2008
[11/12/08] 'Connection to Spring Creek trail, please provide more information on
strategy to connect.
It is anticipated the trail connection will occur across Lot 1. PFA has met
with Craig Forman regarding this and come to an agreement that, once the
city has ascertained a preferred alignment for the connection, PFA will
provide an easement for the trail connection and the City of Fort Collins will
install the trail connection improvements. Please see attached letter from
PFA to Craig Forman.
Department: Stormwater-Water-Wastewater
Issue Contact: Wes Lamarque
Topic: Floodplain
Number: 36 Created: 11/14/2008
[11/14/08] Please add additional notes per redlined plans.
Notes have been added per redlined plans.
Number: 2 Created: 10/28/2008
[10/28/08] The developer will need to coordinate spade, clearance, and fencing
requirements for the electric transformer area with Light & Power Engineering.
The detail shown on the utility plan doesn't make it clear if this space is adequate or
not.
A sketch of the electrical equipment enclosure space is attached.
Number: 3 Created: 10/28/2008
[10/28/08] Platte River Power Authority (PRPA) has a 115,000 volt overhead
transmission line along the north side of Drake. If a fue traffic signal is planned, it
is suggested that the developer coordinate clearance requirements with Tom
McCormick at PRPA (226-4000).
Based upon further discussions with the Traffic Operations, it is anticipated a
signal will not be provided at the median cut. Radier, advanced warning
signs will be installed at the eastbound and westbound lanes of Drake Road.
Topic: Landscape
Number: 4 Created: 10/28/2008
[10/28/08] New trees must be a minimum of 40 feet from streetlights (15 ft. if the
tree is an ornamental type). It appears that the existing landscape plan does not
meet this requirement.
The tree spacing has been changed to meet this requirement. Please see
revised landscape plans.
Department: PFA Issue Contact: Carie Dann
Topic: Fire
Number: 41 Created: 11 / 14/2008
[11/14/08] Poudre Fire Authority Technical Services has no additional comments
at this time.
Department: Traffic Operations Issue Contact: Joe Olson
Topic: General
Number: 30 Created: 11/12/2008
There is an existing curb cut on Drake about 185' west of the proposed curb cut.
The existing curb cut should be removed.
This curb cut is scheduled to be removed with construction of the fire station.
Number: 22 Created: 11/12/2008
[11/12/08] Please take a look at the scanning criteria in regards to the landscape
plan.
This has been reviewed and adjusted accordingly.
Number: 23 Created: 11/12/2008
[11/12/08] You will need to provide a sheet in the utility plans that contain the
general construction notes as well as a sheet that contains standard drawings
pertaining to the project.
General Notes and Detail Sheets are now included in the plan set
Number: 24 Created: 11/12/2008
[11/12/08] You will need to provide the city's signature block on all sheets in the
utility plans.
Signature blocks have been added
Number: 25 Created: 11/12/2008
[11/12/08) Please correct the mislabels on the site plan (see redlines)
Mislabels have been corrected.
Number: 26 Created: 11/12/2008
[11/12/08] What exactly will be happening with the existing house on lot 1? If the
house is to be removed we will need to remove the drive onto Taft Hill as well.
Also, will the existing drive to Drake only be removed up the lot line or will it be
removed back to the house?
The existing house on Lot I will not be addressed with the proposed fire
station development on Lot 2. This will be addressed in a separate
development plan for Lot 1 at some future date.
Number: 33 Created: 11 / 13/2008
[11/13/081 Technical Services has no comments.
Department: Light & Power Issue Contact: Doug Martine
Topic: Electric
Number: 1 Created: 10/28/2008
[10/28/08] The developer will need to provide Light & Power Engineering with a
completed Commercial Service Information (C-1) form. Normal electric
development charges will apply.
The requested form will be provided at application for building permit.
`
U
h
U
C.
y
.S
yw
n.
m
0
1 /28/09
A r ch it a ct a re
Ted Shepard
Planning
City of Fort Collins Current Planning
City of Fort Collins
Interiors
Re: Poudre Fire Authority Station 94
Preliminary Development Plan Review Application
Dear Mr. Shepard,
Please see that we have provided responses to the review comments received on
Nov 24, 2008,
Department: Engineering Issue Contact: Andrew Carney
Topic: General
Number: 19 Created: 11/12/2008
[11/12/08] Please identify the new drive cut curb radii and provide spot elevations. I
would like. to see a more detailed plan on how this area will work and how the
elevations will change. Please show exactly what is proposed in this area more
clearly and in more detail.
Additional detail has been provided on the Horizontal Control and Grading
Plans
Number: 20 Created: 11/12/2008
[11/12/08] TDR fees are still owed. Please contact either myself or Sheri.
PFA is aware of the fees and is making arrangements for payment of same.
Number: 21 Created: 11/12/2008
[11/12/08] Take a look at the turning template for the proposed median cut width.
It is a very tight fit especially for the movement from westbound drake into the site.
Is this movement proposed?
The median cut width has been increased to accommodate the left hand turn
from'westbound Drake.
P.O. Box 1306
Fort Collins, CO 80511
Ph. 9?0.407,0070