Loading...
HomeMy WebLinkAboutPOUDRE FIRE AUTHORITY STATION FOUR - FDP - 33-08/A - CORRESPONDENCE - (7)Number:16 Created: 11/6/2008 [2/6/09] [11/6/08] Please call out typical parking stall dimensions on the site plan Number: 17 Created: 11 /6/2008 [2/6/09] [11/6/08] Landscape plan - please add standard note to plan regarding installation of landscaping prior to issuance of CO. Number: 18 [2/6/09] Created: 11 /6/2008 [11/6/08] Please add counts per item to the plan - not just in the key. Comment from Historic Preservation: A Demolition Permit will be required. Please document all existing structures prior to demolition. Be sure and return all of your redlined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Sincerely: Ted Shepard Chief Planner Page 4 I Department: Light & Power Issue Contact: Doug Martine Topic: Light & Power Number: 42 Created: 2/2/2009 [2/2/09] Please provide an AutoCad drawing of the final approved site/utility plan (when available) to Pat Colburn at PCOLBURN@FCGOV.COM. Department: Light & Power Topic: Site Plan Number: 55 [2/25/09] No comments Issue Contact: Justin Fields Created: 2/25/2009 Department: PFA Issue Contact: Carle Dann Topic: Fire Number: 56 Created: 2/25/2009 TRAFFIC SIGN - Should sign 10A say EMERGENCY VEHICLES ONLY or something similar, instead of NO ACCESS? Department: Stormwater-Water-Wastewater Issue Contact: Wes Lamarque Topic: F/oodplain Number: 57 Created: 2/27/2009 [2/27/09] Please add a copy of the floodplain use permit in the drainage report. Number: 58 Created: 2/27/2009 [2/27/09] Please see redlines floodplain comments in the drainage report and on the plans. Topic: Stormwater Number: 61 Created: 3/3/2009 [3/3/09] Please see minor comments on redlined plans and report. Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington Topic: Water/Wastewater Number: 49 Created: 2/24/2009 [2/24/09] Show fire line in storm drain profile on Sheet 9. Number: 50 Created: 2/24/2009 [2/24/09] Add locator station detail (Std Detail 25). Number: 51 Created: 2/24/2009 [2/24/09] See redlined plans for other comments. Number: 12 Created: 11 /6/2008 [2/6/09] [11/6/08] Provide and show handicap ramp at handicap parking space. Number: 15 Created: 11/6/2008 [2/6/09] [11/6/08] Please note building dimensions, footprint and distance to property lines on the site plan. Page 3 Number: 52 Created: 2/24/2009 (2/24/09] Remove notes 1 and 3 from landscape notes on L1.02. Number: 53 Created: 2/24/2009 [2/24/09] On sheet 1-1.01, plant seed Lbs/PLS shall total 30 Ibs/pls at a minimum. Topic: Site Plan Number: 44 Created: 2/23/2009 [2/23/09] Clearly label the 100' buffer on the plan. Do not use a symbol. Number: 45 Created: 2/23/2009 [2/23/09] Per Section 3.4.1(N), a Limit -of -Development (LOD) line is to shown on the plan. It is to be located along the edge of disturbance within the buffer zone. Number: 54 Created: 2/24/2009 [2/24/09] Add the following note to the Site Plan: Refer to Section 3.4.1 of the Land Use Code for allowable uses within a buffer zone. Department: Engineering Issue Contact: Andrew Carney Topic: General Number: 59 Created: 3/3/2009 [3/3/09] Please provide an exhibit for the curb radii variance request that shows the turning templates and how they work with the proposed curb radii. Engineering can not approve the variance with out an exhibit. Contact me if you have any questions. Number: 60 Created: 3/3/2009 [3/3/09] As discussed in our review meeting, if you are proposing the pond to now be on lot one it may trigger a repay for that lot. So, re -drawing the lot line to include the pond on Lot 2 would avoid this and ensure that all development is occurring solely on lot 2. Topic: Stormwater Number: 62 Created: 3/4/2009 [3/4/09] Please add LCUASS standard drawings 704-13, 708, and 1602. Number: 63 Created: 3/4/2009 [3/4/09] 1 understand you are working with Kyle Lambrecht for the construction of the left turn lane so I will defer to him regarding any phasing of construction for the installation of the water line and the turn lane. Number: 64 Created: 3/4/2009 [3/4/09] The following comments are from Technical Services: 1) Per conversation with Steve Lund (KSI) the legal description will be revised to include the description of the outer boundary. 2) Are the temporary construction easementp expired? If so, they need to be removed from the plat. 3) Please add the note shown about square of property in the South East corner of the property. Page 2 STAFF PROJECT REVIEW City of Fort Collins RON KECHTER Date: 3/5/2009 CITY OF FORT COLLINS 117 N MASON FORT COLLINS, CO 80524 Staff has reviewed your submittal for Poudre Fire Authority Station Four PDP - Type I and Final Plans, and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Dana Leavitt Topic: Landscape Number: 46 Created: 2/23/2009 [2/23/09] Add/identify the 100' buffer zone on the plan. Number: 47 Created: 2/23/2009 [2/23/09] Add the LOD line to the plan. Number: 48 Created: 2/23/2009 [2/23/09] Notes to be added to the plan: All plant materials shall be in accordance with AAN specifications for #1 grade. All trees to meet City of Fort Collins land use Code standards for size. Contractor to minimize all disturbances to non -impacted areas. Minor changes in the species and plant locations may be made during construction as required by site conditions. Overall quantity and quality to be consistent with approved plans. The irrigation system for landscaped areas shall be reviewed and approved by the City of Fort Collins. Irrigation plans to be reviewed as part of the construction permit review process. The irrigation system must be installed according to the approved plans, or an acceptable financial security deposited with the City prior to issuance of a certificate of . occupancy. All turf areas to be irrigated with an automated, pop-up irrigation system. All shrub beds to be irrigated with a drip system. All perennial beds to be irrigated with xeri-pop spray heads. Street tree locations shall be adjusted to allow for a minimum of a 40' clearance to street lights (15' minimum if the tree is ornamental). Tree locations shall have a minimum separation of 8' to water or sewer service lines. Street tree locations shall have a minimum separation of 4' to gas lines. To the maximum extent feasible, topsoil that is removed during construction activities shall be conserved for later use on areas requiring revegetation A free tree permit must be obtained from the City before any trees or shrubs as noted on this plan are planted, pruned or removed on the public right-of-way. This includes zones between curb and sidewalk, medians and other city property. This permit shall approve the location and species to be planted. Failure to obtain this permit may result in replacing or relocating trees and a hold on the certificate of occupancy. The developer shall contact the City Forester to inspect all street plantings at the completion of development. All trees are to have been installed as shown on the Landscape Plan. Approval of street tree planting is required before final approval. Failure to obtain approval by the city Forester for street trees shall result in a hold on the certificate of occupancy. Page 1