HomeMy WebLinkAboutPOUDRE FIRE AUTHORITY STATION FOUR - FDP - 33-08/A - CORRESPONDENCE - (5)Number: 15
[2/6/0] Please Note building dimensions footprint and distance to the property line on the
site plan.
Dimensions have been added to the site plan as requested.
Respectfully,
Patti Watkins
Belford Watkins Group Architects
Cc Bob Poncelow
Ron Kechter
Bob Almirall
Tam Wahl
Ron Boone
Department: Stormwater-Waste-Wastewater Issue Contact: Wes
Lamarque
Topic: Floodplain
Number: 57
[2/27/09] Please add a copy of the floodplain use permit in the drainage report.
The Floodplain Use Permit has been added to the drainage report.
Number: 58
[2/27/09] Please see redlines floodplain comments in the drainage report and on the
plans.
Redlines in the report have been addressed.
Topic: Stormwater
Number: 61
[2/27/09) Please see minor comments on the relined plans and report.
Minor comments on redlines have been addressed.
Department: Stormwater-Waste-Wastewater Issue Contact: Roger
Buffington
Topic: Water/Wastewater
Number: 49
[2/24/09] Show fire line in storm drain profile on Sht 9
The fire line was previously shown on the profile and has been highlighted
on the redlines.
Number: 50
[2/24/09] Add locator station detail (Std Detail 25).
Standard detail 25 has been added
Number: 51
[2/24/09] See redlined plans for other comments.
Redline comments on the plans have been addressed.
Number: 12
[2/24/09] Provide and show handicap ramp at handicap parking space.
A handicap ramp is not required since the parking space is at the same
elevation as the sidewalk in this area
Topic: Stormwater
Number: 62
[3/3/09] Please add LCUASS standard drawings 704-13,708, and 1602.
The standard drawings have been added to the Detail Sheets.
Number: 63
[3/3/09] I understand you are working with Kyle Lambrecht for the construction of
the left turn lane, so I will defer to him regarding any phasing of construction for
the installation of the water line and the turn lane.
Poudre Fire Authority has made an agreement with Kyle concerning these
issues and the design of the lane has been acceptable to our knowledge.
Number: 64
[3/3/09] The following comments are from Technical services:
Per conversation with Steve Lund (KSI) the legal description will be revised to
include the description of the outer boundary.
Please see statement of Ownership and Subdivision language of the Poudre
Fire Authority Plat.
The temporary construction easement has been vacated per this plat.
The corner of the south east portion of the property states this is not part of
this subdivision plat.
Department: Light & Power Issue Contact: Doug Martine
Topic: Light and Power
Number: 42
[2/2/09] Please provide an AutoCAD drawing of the final approved site/utility plan
(when available) to Pat Colburn at pcolbum(a()fc og v.com.
The requested plan will be forwarded when completed.
Department: PFA
Topic: Fire
Number: 57
Issue Contact: Carie Dann
[2/25/09] Should Sign l0A say Emergency Vehicles Only or something similar?
The Sign will state Emergency Vehicles Only.
Topic: Site Plan
Number: 44
[2/23/09] Clearly label the 100' buffer on the plan. Do not use a symbol.
A note has been added to the site plan to identify the line of the 100'
environmental buffer.
Number: 45
[2/23/09] Per Section 3.4.1(N), a Limit -of -Development (LOD) line is to be shown
on the plan. It is to be located along the edge of disturbance within the buffer zone.
Limit of Development line has been added to the site plan and clearly noted
as so.
Number: 54
[2/24/09] Add the following note to the Site Plan: Refer to Section 3.4.1 of the
Land Use Code for allowable uses within a buffer zone.
The note Refer to Section 3.4.1 of the Land Use Code has been added to the
Site plan general note 96.
Department: Engineering Issue Contact: Andrew Carney
Topic: General
Number: 59
[3/3/09] Please provide an exhibit for the curb radii variance request that shows
the turning templates and how they work with the proposed curb radii. Engineering
cannot approve the variance without an exhibit.
Exhibits have been provided for the curb radii variance request previously
submitted. See attached to this document.
Number: 60
[3/3/09] As discussed in our review meeting, if you are proposing the pond to now
be on lot one it may trigger a repay for that lot. So, redraw the lot line to include the
pond on Lot 2 would avoid this and ensure that all development is occurring solely
on Lot 2.
The lot line has been adjusted to include the detention pond on Lot 2.
Tree locations shall have a minimum separation of 8' to water or sewer service
lines.
See Drawings
Street tree locations shall have a minimum separation of 4' to gas lines.
See Drawings
To the maximum extent feasible, topsoil that is removed during construction
activities -shall be conserved for later use on areas requiring revegetation.
The top soil on this site is actually poor qualityfill. Imported top soil as
well as soil amendments are planned into the contract for all the planting
areas.
A free tree permit must be obtained from the City before any trees or shrubs as
noted on this plan are planted, pruned or removed on the public right-of-way. This
includes zones between curb and sidewalk, medians and other city property. This
permit shall approve the location and species to be planted. Failure to obtain this
permit may result in replacing or relocating trees and a hold on the certificate of
occupancy.
A note has been added to the plan
The developer shall contact the City Forester to inspect all street plantings at the
completion of development. All trees are to have been installed as shown on the
Landscape Plan.
A note has been added to the plan
Approval of street tree planting is required before final approval. Failure to obtain
approval by the city Forester for street trees shall result in a hold on the certificate
of occupancy.
Noted.
Number: 52
[2/24/09] Remove notes 1 and 3 from landscape notes on L1.02.
Notes have been removed
Number: 53
[2/23/09] On sheet L1.01, plant seed Lbs/PLS shall total 30 lbs/pls at a minimum.
Note has been adjusted.
Number: 47
[2/23/09] Add the LOD line to the plan.
A LOD line has been added to the plan and labeled.
Number: 48
[2/23/09] Notes to be added to the plan:
All plant materials shall be in accordance with AAN specifications for #1 grade.
A note has been added to the plan.
All trees to meet City of Fort Collins land use Code standards for size.
A note has been added to the plan
Contractor to minimize all disturbances to non -impacted areas.
A note has been added to the plan
Minor changes in the species and plant locations may be made during construction
as required by site conditions. Overall quantity and quality to be consistent with
approved plans.
A note has been added to the plan
The irrigation system for landscaped areas shall be reviewed and approved by the
City of Fort Collins. Irrigation plans to be reviewed as part of the construction
permit review process. The irrigation system must be installed according to the
approved plans, or an acceptable financial security deposited with the City prior to
issuance of a certificate of occupancy.
The irrigation drawings will be provided by the installer during
construction. The set will be sent to the City to be review.
All turf areas to be irrigated with an automated, pop-up irrigation system. All shrub
beds to be irrigated with a drip system. All perennial beds to be irrigated with
xeric-pop spray heads.
The irrigation drawings will be provided by the installer during
construction. The contractor will be made aware of the pop up
requirements.
Street tree locations shall be adjusted to allow for a minimum of a 40' clearance to
street lights (15 minimum if the tree is ornamental).
See Drawings
U
J
J
�
W!
U
C
�
w
f;
CU
U
a
O
O
m0
3/12/09
Architecture
Ted Shepard
Planning
City of Fort Collins Current Planning
City of Fort Collins
/n teriars
Re: Poudre Fire Authority Station #4
Preliminary Development Plan Review Application
Dear Mr. Shepard,
Please see that we have provided responses to the review comments received on
Feb 25, 2009 and March 5, 2009.
Department: Current Planning Issue Contact: Dana Leavitt
Topic: Landscaping
Number: 46
[2/23/09] Add/indentify the 100' buffer zone on the plan.
A note has been added to the site plan indenting the line of the 100'
environmental zone.
Y.O. Uor 1306
1"),t Collins, CO NUS]?
Ph. QN4017.0070