Drainage Letter
Date: March 13, 2013
Project: Kechter Crossing
Fort Collins, Colorado
ADDRESS: PHONE: 970.221.4158
WEBSITE:
200 S. College Ave. Suite 10 www.northernengineering.com
Fort Collins, CO 80524 FAX: 970.221.4159
Attn: Mr. Wes Lamarque
City of Fort Collins Stormwater
700 Wood Street
Fort Collins, CO 80522
Dear Wes:
Project No. 379-017
This letter is intended to address the stormwater impacts associated with the proposed Kechter
Crossing Replat of Lots 4 and 5, Block 4 and Common Area B of the Kechter Crossing Planning
Land Division Filing Two. More specifically, it serves to confirm that the proposed drainage
patterns and percent impervious values are in compliance with the approved drainage plan for
the overall development.
The document titled, "Final Stormwater Management Plan Kechter Crossing' amended
September 8, 2008 by Benchmark Engineers P.C. was approved by the City and County for the
Kechter Crossing development.
The replat involved the relocation of Lots 4 and 5 and Common Area B in order to accommodate
an existing tree. The total number of lots did not change, and the total area impervious did not
change. The relocated lots and common area will drain to the previously planned storm sewers
and detention pond. These changes will be remain consistent with the approved drainage plan.
Feel free to contact me if you have any questions or require additional information.