HomeMy WebLinkAboutSPRING CREEK FARMS NORTH FOURTH FILING - PDP - PDP130014 - SUBMITTAL DOCUMENTS - ROUND 1 - CORRESPONDENCE-CONCEPTUAL REVIEWVIGNETTE
s t u d i o s
proposal. Please see Section 2.8.2 of the LUC for more information on criteria to apply for a
Modification of Standard.
Noted
6. Please see the Submittal Requirements and Checklist at: htto://www.fcciov.com/
developmentreview/app I ications. phhp.
Noted
7. The request will be subject to the Development Review Fee Schedule that is available in the
Community Development and Neighborhood Services office. The fees are due at the time of
submittal of the required documents for the appropriate development review process by City
staff and affected outside reviewing agencies. Also, the required Transportation Development
Review Fee must be paid at time of submittal.
8. When you are ready to submit your formal plans, please make an appointment with
Community Development and Neighborhood Services at (970)221-6750.
Noted
Thank you for your time spent in reviewing these plans. If you have any further questions, please
feel free to contact any of the team members.
Yours Truly
Terence C. Hoaglund
RLA, ASLA, LEED AP
PO Box1889
Fort Collins, CO 80524 (970) 472-9125
www.vignettestudios.com
VIGNETTE
s t u d i o s
7. Utility plans will be required and a Development Agreement will be recorded once the project
isfinalized.
8. A Development Construction Permit (DCP) will need to be obtained prior to starting any work
on the site.
9. The cul-de-sacs shown on the site plan will need to be designed to allow for room to park (1)
on street vehicle per residence in the Cul-de-sac without blocking any driveways.
10. At the time of construction Joseph Allen Drive will be constructed so all curb cuts, utility
service cuts, etc. will charged at triple street cut fees. Applicant may want to consider a
complete overlay of Joseph Allen depending on the amount of cuts and fees.
Noted
ELECTRIC ENGINEERING
Contact: Alan Rutz, 970-224-6153, arutzOfcaov.com
Electric development charges will apply.
Noted
Contact: Courtney Rippy, 970-416-2283, crippy@fcgov.com
Contact: Jason Holland, 970-224-6126, jholland@fcgov.com
1. A Modification of Standard will be required for an increase in secondary uses above the 25%
maximum in the Employment zone. A Modification of Standard will also be required for a
reduction in density below the required minimum of 7 d/u acre in the Employment zone.
We have included a modification ofstandards with this submittal
2. The proposed development project is subject to a Type 2 (Planning and Zoning Board) review
and public hearing. The applicant for this development request is required to hold a
neighborhood information meeting prior to formal submittal of the proposal. Neighborhood
meetings offer an informal way to get feedback from your surrounding neighbors and discover
any potential hiccups prior to the formal hearing. Please contact me, at 221-6750, to assist
you in setting a date, time, and location. I and possibly other City staff, would be present to
facilitate the meeting.
Noted, the neighborhood meeting has been held.
3. Please see the Development Review Guide at www.fcaov.com/dro. This online guide
features a color coded flowchart with comprehensive, easy to read information on each step
in the process. This guide includes links to just about every resource you need during
development review.
4. This development proposal will be subject to all applicable standards of the Fort Collins Land
Use Code (LUC), including Article 3 General Development Standards. The entire LUC is
available for your review on the web at htto://www.colocode.com/ftcollins/landuse/begin.htm.
5. If this proposal is unable to satisfy any of the requirements set forth in the LUC, a
Modification of Standard Request will need to be submitted with your formal development
PO Box 1889
Fort Collins, CO 80524 (970) 472-9125
www.vignettestudios.com
VIGNETTE
s t u d i o s
2. FIRE LANE SPECIFICATIONS
In addition to the design criteria already contained in relevant standards and policies, any new fire
lane must meet the following general requirements:
> Shall be designated on the plat as an Emergency Access Easement.
> Maintain the required 20 foot minimum unobstructed width & 14 foot minimum
overhead clearance.
> Be designed as a flat, hard, all-weather driving surface capable of supporting 40 tons.
3. CUL-DE-SACS
Cul-de-sacs are permitted only if they have a turnaround at the end with a minimum outside
turning radius of 50 feet (100 foot diameter).
FCLUC 3.6.2(B)
Noted: These will be specifically addressed with each PDP
ENVIRONMENTAL PLANNING
Contact: Lindsay Ex, 970-224-6143, lex@fcg_ov.com
1. With respect to landscaping and design, the City of Fort Collins Land Use Code, in Article
3.2.1 (E)(2)(3), requires that you use native plants and grasses in your landscaping or re
landscaping and reduce bluegrass lawns as much as possible. Reveille Bluegrass is one
option for having bluegrass lawns and using less water.
Noted:, refer to the included landscape plan
ENGINEERING DEVELOPMENT REVIEW
Contact: Andrew Gingerich, 970-221-6603, aainaerich@fcgov.com
1. Larimer County Road Impact Fees and Street Oversizing Fees are due at the time of building
permit. Please contact Matt Baker at 224-6108 if you have any questions.
2. The City's Transportation Development Review Fee (TDRF) is due at the time of submittal.
For additional information on these fees, please see: http://www.fcQov.com/engineering/
dev-review.php
3. Any damaged curb, gutter and sidewalk existing prior to construction, as well as streets,
sidewalks, curbs and gutters, destroyed, damaged or removed due to construction of this
project, shall be replaced or restored to City of Fort Collins standards at the Developer's
expense prior to the acceptance of completed improvements and/or prior to the issuance of
the first Certificate of Occupancy.
4. Please contact the City's Traffic Engineer, Joe Olson (224-6062) to schedule a scoping
meeting and determine if a traffic study is needed for this project. In addition, please contact
Transportation Planning for their requirements as well.
5. Any public improvements must be designed and built in accordance with the Larimer County
Urban Area Street Standards (LCUASS). They are available online at: htto://www.larimer.orci/
engineering/GMARdStds/UrbanSt.htm
6. This project is responsible for dedicating any right-of-way and easements that are necessary
for this project.
PO Box 1889
Fort Collins, CO 80524 (970) 472-9125
www.vignettestudios.com
VIGNETTE
s t u d i o s
concerning this section, please contact the Erosion Control Inspector, Jesse Schlam at
224-6015 orjschlam@fcgov.com.
2. Onsite detention is required for the runoff volume difference between the 100 year developed
inflow rate and the 2 year historic release rate. The rate and volume have preliminarily been
determined and a detention pond is to be constructed on the park site that was approved on
the Spring Creek Farm 3rd Filing plans.
3. Water quality treatment is also required as described in the Urban Storm Drainage Criteria
Manual, Volume 3 - Best Management Practices (BMPs). (http://www.udfcd.org/downloads/
down_critmanual_vollll.htm) Extended detention is the usual method selected for water
quality treatment; however the use of any of the BMPs is encouraged.
4. The Stormwater Utility anticipates that City Council will be approving new Low Impact
Development (LID) requirements that will go into effect in mid February 2013. Please contact
Basil Hamdan at 224-6035 or bhamdan@fcgov.com for more information. The present draft
requires that 50% of the new impervious area must be treated by an LID method and 25% of
new parking lots must be pervious.
5. The drainage outfall for the site is in the SE corner of the site. Previous drainage studies
have documented the release rate for the various portions of this site.
6. The city wide Stormwater development fee (PIF) is $6,390.00/acre ($0.1467/sq.ft.) for new
impervious area over 350 sq.-ft., and there is a $1,045.00/acre ($0.024/sq.ft.) review fee. No
fee is charged for existing impervious area. These fees are to be paid at the time each
building permit is issued. Information on fees can be found on the City's web site at http://
www.fcg ov.com/uti lities/business/bu i lders-and-developers/plant-i nvestment-development-fees
or contact Jean Pakech at 221- 6375 for questions on fees. There is also an erosion control
escrow required before the Development Construction permit is issued. The amount of the
escrow is determined by the design engineer, and is based on the site disturbance area, cost
of the measures, or a minimum amount in accordance with the Fort Collins Stormwater
Design Criteria.
The design of this site must conform to the drainage basin design of the Foothills Basin
Master Drainage Plan as well the City's Design Criteria and Construction standards.
Noted
PARK PLANNING
Contact: Craig Foreman, 970-221-6618, cforeman@fcgov.com
1. No comments
Department: Fire Authority
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org
1. WATER SUPPLY
Fire hydrants must be the type approved by the water district having jurisdiction and the Fire
Department. Hydrant spacing and flow must meet minimum requirements based on type of
occupancy. Residential requirements: Within the Urban Growth Area, hydrants to provide 1,000
gpm at 20 psi residual pressure, spaced not further than 400 feet to the building, on 800-foot
centers thereafter.
PO Box 1889
Fort Collins, CO 80524 (970) 472-9125
www.vignettestudios.com
VIGNEi
TE
s t i o s
LUC 4.5(D)(6) At least 90% of the dwellings are required to be within one-third of a mile to a
publicly accessed 1 acre park.
LUC 4.5(E)(1)(b) If a block face is over seven hundred ft long, then walk -ways connecting to
other streets shall be provided.
Noted
4. LUC 3.5.2(D)
Setback from non -arterial street is 15 ft
Setback for side and rear lot lines is 5ft
Setback for garage doors is at least 20ft from back side of sidewalk. Also LUC 3.5.2(E)
Garage standards do apply.
Minimum lot width for single family detached is 50ft
Noted
5. LUC 3.2.1 This section requires a landscape plan
Included
Department: Water -Wastewater Engineering
Contact: Roger Buffington, , rbuffington@fcgov.com
1. Existing water mains and sanitary sewers in this area include an 8-inch water main and an
8-inch sewer in Joseph Allen
2. Existing water mains and sanitary sewers in this area include an 8-inch water main and an
8-inch sewer in Joseph Allen
3. Any water/sewer lines stubbed into this site must be used or abandoned at the main.
4. Any water/sewer lines stubbed into this site must be used or abandoned at the main.
5. Development fees and water rights will be due at building permit.
6. Development fees and water rights will be due at building permit.
Noted
Department: Stormwater Engineering
Contact: Glen Schlueter, 970-224-6065, gschlueter@fcgov.com
A drainage and erosion control report and construction plans are required and they must be
prepared by a Professional Engineer registered in Colorado. The drainage report must
address the four -step process for selecting structural BMPs. Standard operating procedures
(SOPs) for all onsite drainage facilities need to be prepared by the drainage engineer and
there is a final site inspection required when the project is complete and the maintenance is
handed over to an HOA or another maintenance organization. The erosion control
requirements are in the Stormwater Design Criteria Section 1.3.3. If you need clarification
PO Box 1889
Fort Collins, CO 80524 (970) 472-9125
www.vignettestudios.com
VIGNEi
TE
s t i o s
April 10, 2013
Jason Holland
City Planner
Community Planning and Development
281 North College Avenue
Fort Collins Colorado 80524
Dear Jason,
The following is the applicant's response to the Spring Creek Farms 4th Filing
Conceptual Review Comments dated January 17, 2013. Please find attached copies of
the PDP plans for your review.
Comment Summary:
Department: Zoning
Contact: Noah Beals, 970-416-2313, nbeals@fcgov.com
1. Land Use Code (LUC) 4.5(13)(2)(a)1. In the LMN zone district single family detached
dwellings are a permitted use subject to a Type 1 review.
LUC 4.27(B)(3)(a)1.Single Family detached dwellings on lot containing no more than 6,000
sq ft is permitted use in the Employment (E) zone district subject to a Type 2 review.
Because a portion is subject to Type 2 review the whole project will be reviewed as a Type 2.
Noted
2. LUC 4.27(C)(2)(d) Residential uses are considered secondary uses in the E zone district.
Therefore only 25% of the portion of the project that is in the E zone district can be.
residential. THe proposal is showing 100% of the E zone district to be residential this would
require a modification.
4.27(D)(5) In the E zone district the density requirement is 7 units per net acre.
4.27(D)(7) 90% of the dwellings are required to be within quarter mile and have Access to a
park feature or gathering place at least 10,000 sq ft that is publicly accessed (see section for
further details).
We have submitted a modification of standards concurrent with this PDP submittal for
the E district portion of this submittal.
3. LUC 4.5(1))(1)(a) For projects less then 20 acres the minimum density for a residential use is
3 dwelling units per net acre.
LUC 4.5(E)(3) The maximum height of residential building is 2.5 stories.
LUC 4.5(D)(3) At least 90% of the dwellings have to be with three-quarters of mile of a
Neighborhood Center.
PO Box 1889
Fort Collins, CO 80524 (970) 472-9125
www.vignettestudi(is.com