Loading...
HomeMy WebLinkAboutRAM'S CROSSING K2 APARTMENTS - BDR - BDR110004 - CORRESPONDENCE - (7)Department: Zoning Contact: Gary Lopez, 970-416-2338, glopez fcgov.com Topic: General. Comment Number: 3 Comment Originated: 11/21/2011 11/21/2011: Trash enclosure shall be of same material/coler as the building. Topic: Site Plan Comment Number: 1 Comment Originated: 11/21/2011 11/21/2011: Where will the bicycle parking go and for how many bikes? Not shown on site plan. Comment Number: 2 Comment Originated: 11/21/2011 11/21/2011: While the development is in the Transportation Overlay Dist. or TOD the normal minimum parking spaces required would have been 56. While no minimum vehicle spaces required a recommendation that some off street parking be created. 9 Department: Stormwater Engineering Contact: Wes Lamarque, 970.416.2418, wlamargue(&fcgov.com Topic: General Comment Number: 4 Comment Originated: 11/29/2011 11/29/2011: Please discuss in the text of the drainage letter the outfall for the site. Please mention how the flows get to the nearest right-of-way. Department: Technical Services Contact: Jeff County, 970.221.6588, icountvng.fcgov.com Topic: Building Elevations Comment Number: 5 11/23/2011: No comments. Topic: Construction Drawings Comment Number: 6 11/23/2011: Please correct the legal description. Topic: Landscape Plans Comment Number: 4 11/23/2011: There are minor line over text issues. Topic: Site Plan Comment Number: 1 11/23/2011: Please correct the legal description. Comment Number: 2 11/23/2011: Please add a north arrow. Comment Number: 3 11/23/2011: There are minor line over text issues. Department: Water -Wastewater Engineering Contact: Roger Buffington, 970-221.6854, rbuffington(&.fcgov.com Topic: Construction Drawings Comment Number: 1 Comment Originated: 11/23/2011 Comment Originated: 11/23/2011 Comment Originated: 11/23/2011 Comment Originated: 11/23/2011 Comment Originated: 11/23/2011 Comment Originated: 11/23/2011 Comment Originated: 11/29/2011 11/29/2011: City Code requires that each building have separate water and sewer services. Development fees and water rights are based upon the number of living units and the lot area; therefore, there is no savings in connecting both buildings to the same water service. Comment Number: 2 Comment Originated: 11/29/2011 11/29/2011: Revise the fittings and notes at the north end of the water main extension as shown on the redlined utility plans. Topic: Easements Comment Number: 3 Comment Originated: 11/29/2011 11/29/2011: Provide an easement (20 foot minimum width) for the water main and fire hydrant. 0 Department: Light And Power Contact: Doug Martine, 970.224-6152, dmartine(a)fcgov.com Topic: General Comment Number: 1 Comment Originated: 11/28/2011 11/28/2011: Substantial electric utility system modifications will apply. Normal electric development charges as well as costs to modify the system will apply. Each apartment must be individually metered, and meters must be outdoors & accessable to utility personnel. Use of electric space heating is discouraged. If electric space heating is used, the rate for electric development charges is higher. Contact Light & Power Engineering at (970)221-6700 to coordinate the electric utility system design and costs. Department: PFA Contact: Ron Gonzales, 970-221.6635, rgonzalesa(�poudre•fire.org Topic: General Comment Number: 1 Comment Originated: 11/29/2011 11/29/2011: Address numerals required to be visible from the street the property fronts on Comment Number: 2 Comment Originated: 11/29/2011 11/29/2011: the building is required to be fire sprinklered Comment Number: 3 Comment Originated: 11/29/2011 11/29/2011: afire hydrant is required to be within 300 feet of the building, measured as the hose would lay, not as the crow flies. Comment Number: 4 Comment Originated: 11/29/2011 11/2912011: afire lane is required. provide fire lane plan for approval. Comment Number: 5 Comment Originated: 11/29/2011 11/29/2011: Department: Stormwater Engineering Contact: Wes Lamarque, 970-416.2418, wlamarpueOfcpov.com Topic: General Comment Number: 1 Comment Originated: 11/29/2011 11/29/2011: The existing outfall for this site is undesirable. Although this is an existing condition, the City encourages the applicant to look for opportunities to improve the current outfall situation with CSU to the north and east. Comment Number: 2 Comment Originated: 11/29/2011 11/29/2011: The City would like to have a meeting to discuss the best water quality mitigation techniques available for this site that will improve water quality while not becoming a maintenance problem. We also have some design suggestions for a sand filter that might help when no outfall or underdrain exist. Comment Number: 3 Comment Originated: 11/29/2011 11/29/2011: Please add all drainage details including concrete channel and permanent BMPs. Department: Engineering Development Review Contact: Sheri Langenberger, 970.221.6573, slangenberger(a)fcaov.com Topic: General Comment Number: 2 Comment Originated: 11/29/2011 11/29/2011: The boulders that are located on the West side of the driveway. Any way that these can be setback from the sidewalk? Per the standards 2 feet of separation from the sidewalk edge to the edge of the feature is required. Figure 16-1, note 1. 1 do not get this from looking at the plans, but from the street view it looks as if these boulders maybe intended to provide an edge for the raised area where the tree is. If this is so additional information needs to be provided on the plans as to how that works — do the timbers stay on the west side since no boulders are being placed there or ? Comment Number: 4 Comment Originated: 11/29/2011 11/29/2011: Additional notes are needed to make sure that the curb line as it intersects the sidewalk drop to a 0 foot height. Also please make sure that it is clear that the driveway is to be concrete to the property line (important in the case that they decide not to use concrete for the parking lot) and that a concrete joint is to be provided at the property line. Comment Number: 7 Comment Originated: 11/29/2011 Easements for the following items need to be submitted. Please let me know if you need a copy of the most current dedication language (it has been updated recently) Processing (TDRF) fees for each easement are $250 plus filing fees. ROW for Lake Street— 8 additional feet for a total '/ width of 38 feet. Emergency Access Easement — through parking lot Utility and Drainage Easement —through parking lot Utility and Drainage Easement - adjacent to Lake St 11/29/2011: Topic: Landscape Plans Comment Number: 5 Comment Originated: 11/29/2011 11/29/2011: The existing sign is still being shown. The following note needs to be added to the landscape plan: Landscaping within the row is restricted to plants that do not exceed 24 inches in height measured from the street flowline (trees excepted). If the landscaping within the row exceeds this height or creates a sight distance concern the property owner shall be required to trim the landscape material. Topic: Site Plan Comment Number: 6 Comment Originated: 11/29/2011 11/29/2011: The existing sign is still being shown in the sidewalk. Department: Environmental Planning Contact: Lindsay Ex, 970.224.6143, lex@fcgov.com Topic: General Comment Number: 1 Comment Originated: 11/28/2011 11/28/2011: No comments. Department: Current Planning Contact: Steve Olt, 970.221.6341, solt(a)fcgov.com Topic: General Comment Number: 8 Comment Originated: 11/29/2011 11/29/2011: Based on the information provided on Sheet A3 of 4 - Shadow Analysis and Sheet A4 of 4 - Visual Analysis, consideration of the placement and design of the new building incorporates minimization of impacts on privacy, solar gain and views as it relates to the existing building to the north and the surrounding area, thereby satisfying the applicable requirements set forth in Section 3.5.1(G)(1) of the Land Use Code. Comment Number: 9 Comment Originated: 11/29/2011 11/29/2011: The amount of on -site parking being provided is 24% of what the required minimum would be if this property were not in the Transit -Oriented Development overlay zone. Granted, Section 3.2.2(K)(1)(a)l of the Land Use Code states that multi -family dwellings within the TOD overlay zone shall have no minimum parking requirements. Topic: Site Plan Comment Number: 2 Comment Originated: 11/28/2011 11/28/2011: Under Land -Use Statistics, Off -Street Parking on the Site Plan it shows 44 off-street spaces and 47 total spaces. What is the difference? Comment Number: 5 Comment Originated: 11/28/2011 11/28/2011: The Site & Landscape Plans show bike racks in 3 different locations: 1) outside the east building entry on the existing building; 2) on new concrete just east of the swimming pool; and 3) in a covered area on new concrete between the existing and new buildings along the west side of the property. Perhaps the bike racks should be enhanced so that they are easier to see on the plans. Comment Number: 7 Comment Originated: 11/29/2011 11/29/2011: Please indicate the width of additional right-of-way along West Lake Street that is being dedicated with this project. Department: Engineering Development Review Contact: Sheri Langenberger, 970.221.6573, slangenbergerOfcgov.com Topic: Construction Drawings Comment Number: 3 Comment Originated: 11/29/2011 11/2912011: Per driveway type II there are no truncated domes to be located at the sidewalk crossing of the driveway. Topic: General Comment Number: 1 Comment Originated: 11/29/2011 11/29/2011: 1 do not have a response to the two variance requests. I plan on discussing this with staff this week and will get back to folks once I have answers. Fort Collins November 30, 2011 RE: Rams Crossing K2 Apartments, BDR110004, Round Number 1 Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970,221,6750 970.224.6134 - fax fcgov. com/develo pmenfrevlew Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Gary Lopez, at 970-416-2338 or glopez@fcgov.com. Comment Summary: Department: Current Planning Contact: Steve Olt, 970-221.6341, soft@fcpov.com Topic: Building Elevations Comment Number: 3 Comment Originated: 11/28/2011 11/28/2011: Current Planning did not receive Building Elevations (4 sides) sheet. Were they required as part of this Basic Development Review submittal? They are a requirement on the BDR submittal requirements/checklist. Are they Sheets Al & A2 of 4. Planning received Sheets A3 & A4 of 4. Comment Number: 4 Comment Originated: 11/28/2011 11/28/2011: The sketches and simulations on Sheets A3 & A4 of 4 show what appear to be 4-story elements on the new building. Is this correct and, if so, the Planning Objectives and Site Plan should reflect this? Topic: General Comment Number: 1 Comment Originated: 11/28/2011 11/28/2011: Section 3.2.1(E)(5)(e) of the Land Use Code states: "Parking bays shall extend no more that fifteen (15) parking spaces without an intervening tree, landscape island or landscape peninsula". This requirement is not being met in the tier of 18 parking spaces along the east side of the property, east of the existing building. Comment Number: 6 Comment Originated: 11/29/2011 11/29/2011: Is the crusher fines path between the existing BBQ area and the existing gazebos handicapped accessible and, if not, should it be?