Loading...
HomeMy WebLinkAboutRAM'S CROSSING K2 APARTMENTS - BDR - BDR110004 - CORRESPONDENCE - (9)City of Frt Collins Project: Rams Crossing K2 Apartments Date: January 19, 2012 Zoning's Unresolved Issues: Made By: Gary Lopez Initial Date: 01/09/2012 Issue ID: 4. Topic: Landscape Plans Round: 1 Status: Active Issue: 01/0912012: ROUND TWO -Landscape note #23 refers to landscape phasing. Indicate phasing lines which I assume is for each front and rear building. Page 1 of 9 Fort Collins Project: Rams Crossing K2 Apartments Date: January 19, 2012 PFA's Unresolved Issues: Made By: Ron Gonzales Stormwater Engineering's Unresolved Issues: Made By: Wes Lamarque Initial Date: 01/10/2012 Issue ID: 5 Topic: General Round: 1 Status: Active Issue: 01/10/2012: More detail is needed on the water quality mitigation detail regarding the concrete beam. We can discuss this over the phone and revise drawings via pdf. Technical Services's Unresolved Issues: Made By: Jeff County Initial Date: 11123/2011 Issue ID: 4 Topic: Landscape Plans Round: 1 Status: Active Issue: 01/12/2012: There are still 2 minor line over text issues. 11/23/2011: There are minor line over text issues. Initial Date: 11/23/2011 Issue ID: 5 Topic: Building Elevations Round: 1 Status: Active Issue: 01/12/2012: No comments 11/23/2011: No comments. Initial Date: 01/12/2012 Issue ID: 7 Topic: Site Plan Round: 1 Status: Active Issue: 01/12/2012: There is missing text on sheet LS3.0. Initial Date: 01/12/2012 Issue ID: 8 Topic: Construction Drawings Round: 1 Status: Active Issue: 01/12/2012: No comments. Initial Date: 01/1212012 Issue ID: 9 Topic: Easements Round: 1 Status: Active Issue: 01/12/2012: All 3 easement legal descriptions & sketches look good. Water -Wastewater Engineering's Unresolved Issues: Made By: Roger Buffington Initial Date: 01/09/2012 Issue ID: 4 Topic: Construction Drawings Round: 1 Status: Active Issue: 01 /09/2012: Label the tee for the fire line connection as an 8" x 6" tee. Page 1 of 9 Fort Collins Project: Rams Crossing K2 Apartments Date: January 19, 2012 Initial Date: 01/07/2012 Issue ID: 9 Topic: General Round: 1 Status: Active �ssue: 01/07/2012: Landscape plan Add the following note to the plan: At such time as the existing tree that is located just to the west of the driveway within the raised area supported by sandstone boulders dies or is removed the sandstone boulders adjacent to the sidewalk will either be removed or relocated to meet the standard horizontal setback clearance for an object from a sidewalk. Initial Date: 01/0712012 Issue ID: 10 Topic: General Round: 1 Status: Active Issue: 01/07/2012: Utility Plans — Overall they look good - just a couple of comments that were noted on the redlines from the last review, but not sure you received them since they were returned separately from the resubmittal. Detail 701 vertical curb should be placed on the plans. It is needed for any street curb that might get replaced. Detail 1603 on sheet 9 and details 1606 and 1607 on sheet 10 are not needed for any row work and can be removed unless they are needed for some on -site work. Initial Date: 01/07/2012 Issue ID: 11 Topic: General Round: 1 Status: Active Issue: 01/07/2012: With these changes I am ready for mylars. Note that I can not sign the mylars until the final deeds are received, but we can certainly route them and start them through the signature process while we continue to work on the deeds. Environmental Planning's Unresolved Issues: Made By: Lindsay Ex Initial Date: 11/28/2011 Issue ID: 1 Topic: General Round: 1 Status: Active Issue: 11/28/2011: No comments. Light And Power's Unresolved Issues: Made By: Doug Martine Initial Date: 11/28/2011 Issue ID: 1 Topic: General Round: 1 Status: Active Issue: 11/28/2011: Substantial electric utility system modifications will apply. Normal electric development charges as well as costs to modify the system will apply. Each apartment must be individually metered, and meters must be outdoors & accessable to utility personnel. Use of electric space heating is discouraged. If electric space heating is used, the rate for electric development charges is higher. Contact Light & Power Engineering at (970)221-6700 to coordinate the electric utility system design and costs. Page 1 of 9 of Fort Collins Project: Rams Crossing K2 Apartments Date: January 19, 2012 Current Planning's Unresolved Issues: Made By: Steve Olt Initial Date: 11/29/2011 Issue ID: 6 Topic: General Round: 1 Status: Active ,Issue: 12/28/2011: Will this trail be edged to contain the crusher fines material over time; and, will it be V/� compacted such to carry wheelchairs? Because this is the only access to the BBQ area it must always be handicapped accessible. 11/29/2011: Is the crusher fines path between the existing BBQ area and the existing gazebos handicapped accessible and, if not, should it be? Initial Date: 11/29/2011 Issue ID: 7 Topic: Site Plan Round: 1 Status: Active /Issue: 12/28/2011: This was not done with the revised Site Plan dated 12/15/11. COY 11/29/2011: Please indicate the width of additional right-of-way along West Lake Street that is being appdedicated with this project. Initial Date: 12/28/2011 Issue ID: 10 Topic: Site Plan Round: 1 Status: Active / Issue: 12/28/2011: There are some discrepancies with the line work/line weights for the Proposed Easement V D� Line and Proposed R.O.W. Line along Lake Street. Please see red -lined Site Plan. Engineering Development Review's Unresolved Issues: Made By: Sheri Langenberger Initial Date: 11/29/2011 Issue ID: 7 Topic: General Round: 1 Status: Active Issue: 1/7/2012: Legals for easements were received and are being checked. Any comments will be sent on. Please provide me with draft copies of the deeds so these can be reviewed before being signed. 11/29/2011:Easements for the following items need to be submitted. Please let me know if you need a copy of the most current dedication language (it has been updated recently) Processing (TDRF) fees for each easement are $250 plus filing fees. ROW for Lake Street � 8 additional feet for a total Y2 width of 38 feet. Emergency Access Easement L through parking lot Utility and Drainage Easement L through parking lot Utility and Drainage Easement - adjacent to Lake St 11/29/2011: Initial Date: 01/07/2012 Issue ID: 8 Topic: General Round: 1 Status: Active sue: 01/07/2012: Sheet LS 3.0 Site Details g/ Add a note to detail 3 that states: At such time as the existing tree dies or is removed the sandstone boulders adjacent to the sidewalk will either be removed or relocated to meet the standard horizontal setback clearance for an object from a sidewalk. This is a condition of the granted variance request that allows for now the boulder to be placed up against the sidewalk. Page 1 of 9