HomeMy WebLinkAboutFOX POINTE PLAZA - FDP - 16-06/A - SUBMITTAL DOCUMENTS - ROUND 1 - ROUTING SHEETFINAL PLAN ROUTING SHEET
Item:
This project went to Public Hearing on I V �. c u•„•
The following table lists final plan submittal requirements for this pr 'ect.
A final fee of $1,000.00 is required at the time of submittal reduced.
—
Fee Waiver/Re uction Approval: Amount: __Datgg:
Planner: ' - A)u— Engineer: , is �lDi
'-�
Building Inspection
M_MMMMMM_M=����
Poudre Fire Authority
MMMMMMMM�MMMMMM
Schools: Poudre
Thompson
S: fG �Gt6 Lano�Sl� t