Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
FOX POINTE PLAZA - FDP - 16-06/A - CORRESPONDENCE -
FINAL PLAN ROUTING SHEET This project went to Public Hearing on CiN I[RE!tT o(T P Collins CULVCXING The following table lists final plan submittal requirements for this pr 'ect. A final fee of $1,000.00 is required at the time of submittal anless oche" 9 waived __ Fee Waiver/Re uction Approval: Amount: Date: Planner: z/-Itvl-k-, M±7 Engineer: ma�aFc%kA Items Requested File: Project Planner Engineering Light & Power Natural Resources Post Office Technical Services Traffic Operations _Transportation Planning Water & Wastewater / we -' M©■M■E■■.■■■■■■ ConservationWater MMMMMMMM_MMMMMM County Assessor ..., ... • ■■■■■■■■ten■■■■ Steve Olt_ Re: Fox Pointe Plaza _ _ _ -- Page 2J Kevin Zdenek Vice President 631 W. Mulberry Street Fort Collins, CO 80521 970-231-4684 mobile 970-372-5011 office 866-534-9139 fax CC: Randy Maiziand Steve Olt - Re: Fox Pointe Plaza -� Y Page fl From: Steve Olt To: Kevin Zdenek Date: 11/02/2006 9:31:58 AM Subject: Re: Fox Pointe Plaza Kevin, You need to submit the required Final Compliance (FC) documentation along with the Current Planning Department development review fee of $1,000.00. You will have to check with Randy Maizland (221-6605) of the Engineering Department for their required Transportation Development Review Fee due at time of FC submittal. There is a Final Plan Routing Sheet, with the number of each document to submit, on the Current Planning counter. The submittal requirements are as follows: ' 8 Site Plans ` 6 Landscape Plans 2 Building Elevation Plans ` 8 Subdivision Plats 6 Utility Plan sets ' 2 Drainage Reports ` 1 Soils Report Once submitted, the first round of final review will be 3 weeks. Hopefully we will be ready to accept mylars after the first round. You will need to schedule a FC submittal appointment with Neighborhood & Building Services, at 221-6760. Please ask for Sandy, Doreen, or Mary Jane. Steve >>> "Kevin Zdenek" <kevin@ztigroup.com> 11/01 3:53 PM >>> Steve, I need a list of how many Final Plans we need to submit for approvals. As I mentioned a couple of weeks ago. We want to begin the Site Work very soon and i am told we can not get a permit until the Final plans are approved. Apparantely we also need to have a Development Agreement in place before starting work as well. Can you please let me know how to proceed as quickly as possible. Thank you,