Loading...
HomeMy WebLinkAboutFOX POINTE PLAZA - PDP - 16-06 - CORRESPONDENCE - (6)PIANNER ILNp PE ARCNRECT. / _ \ LAND USE SUMMARY OFFICE SQUARE FOOTAGE: t13,500 s.f. PARKING MAX ALLOWED PER CODE: 3 SPACES/1,000 s.f. PARKING SHOWN: 40 SPACES OFFICE 15• DTLL \ \ \ \ \ EASEMENT \ \ BUILDING \ \ \ \ f13,500s.f. r l I TRADETENSN \ A V A R r'I \ EXISTING STORM INo - ''l DRI UP� BO%ES %ISTINGEDGE EDGE OF E` \ EXISTING DRIVE\\E, \) �11 \ \ �% \ \ \ C14 ENGNEER OAfIER ICEVE .. Q I� O C) f'" O U zW '-a W z O o w WO Y ]O M NORTH S NOTICE: w naxsof nos A. wwxwaBu RAPr1Y. EASI W G iREFS NO OTNfR E%ISIM SE9TURESPRUPFATY BOUMOARW%RIEA DTNEB MAPPMGANPVR SVR VEY MPoRNATbN. BNLGW G PwT%NnS. GBxERARcxnacnnv.L RRORMATIBYCff TRELIREWERE NOT PREPAMEB BYCRYS[APEBIITNAVEU A PP �OYRIEOBYOTXERS.XO 51pVL➢8E FlPJdEB PR10R i0IXM5TRIKTMIN. JOB N¢: 1800 BMlllk� ISGIL REN9JL4 91FET nTlc CONCEPT ONE EXFET NG: 1 Of 1 15. Check with Matt Baker, 221-6605, to see if this lot carries a financial obligation to for existing public improvements along J.F.K. Parkway and Boardwalk Drive installed with prior development. 16. Utility Plans will be needed at the time of submittal. A Development Agreement will be required prior to recording final documents. A Development Construction Permit, and fee, will be required prior to beginning site work. For further information, please contact Marc Virata, 221-6605. 17. The construction phase will require a Fugitive Dust Permit from the Larimer County Health Department. 18. For an estimate of the Capital Improvement Expansion Fee, payable at the time of building permit issuance, please contact the Building Inspection Division, 221- 6760. This fee is adjusted annually based on the Denver -Boulder consumer price index. 5 7. There are eight -inch diameter water mains and eight -inch diameter sewer mains in both Boardwalk Drive and J.F.K. Parkway. Plant investment fees (tap fees) would be due for new water and sewer services at the time of building permit issuance. Both the water service and the fire line must be brought into a mechanical room for the backflow prevention device This site sets low as compared to street; therefore, a gravity sewer connection may be questionable. Depth of sewer at intersection of Boardwalk and JFK is approximately 16 feet. The Post Office connects to sewer at a manhole located approximately 830 feet south of the Boardwalk/JFK intersection. 8. The water conservation standards for landscape and irrigation will apply to the project. Water rights, or cash -in -lieu, will be due at time of building permit. Please be aware that the Water and Sewer Department of Fort Collins Utilities has implemented a plan check fee. For further information, please contact Roger Buffington, 221-6681. 9. The site will be served by the Poudre Fire Authority. They will require that a fire hydrant be within 300 feet of the building capable of delivering a minimum of 1,500 gallons per minute at 20 p.s.i. The address must be visible from either J.F.K. Parkway or Boardwalk Drive. If there will be more than 5,000 square feet or more of floor area that is not "fire -contained," then an automatic fire extinguishing system is required. The most remote exterior portion of the buildings must not be more than 150 feet from the designated fire access lane. 10. Designated fire lanes must feature curbs painted red and "No Parking - Fire Lane" signs. For further information, please contact Ron Gonzales, 221-6570. 11. The new building will be assessed both the Larimer County Road Impact Fee and the City's Street Oversizing Fee. The exact fee will depend on the land use and trip generation rate. These fees are payable at the time of building permit issuance. Keep in mind fees are adjusted annually. For further information, please contact Matt Baker, 221-6605. 12. A Transportation Impact Study will be required which will address all modes. Check with Eric Bracke, 221-6630, to determine the scope, or the need for the study. 13. Public improvements shall comply with Larimer County Urban Area Street Standards. For example, if not already constructed, a detached sidewalk is required along both public streets with street trees planted in the parkway strip. 14. Be sure that where there is head -in parking next to a sidewalk that the walk is at least six feet wide. A bike rack should be placed near the entrance. Ramps need to be placed next the handicap parking spaces. . .19 This exception is to accommodate the unique needs of individual tenants, such as call centers, or where there may be shift work. 5. Please check with the Light and Power Department to see if the development charges have already been paid for this parcel. If not, then the parcel will be assessed both on a square footage basis and linear foot basis of public street frontage along both J.F.K. Parkway and Boardwalk Drive. Since the site is vacant, the developer is still responsible for building site charges. There is existing three-phase electrical power along Boardwalk but not along J.F.K. The maps indicate that no conduit was stubbed to this parcel. A location for the new transformer will need to be selected. Any modification of the existing system will be at the developer's expense. All existing easements should be retained. The transformer, electrical and gas meters should be screened, especially since the rear of the building will be visible from two public streets. The transformer, however, must be within ten feet of hard surface for emergency change -out purposes, and yet still be screened in an attractive manner. A Commercial One ("C-1") Form must be completed by a licensed electrical contractor. Please refer to the hand-out describing the development fees and charges. For further information, please call Janet McTague at 221-6700. 6. This site is in the McClelland/Mail Creek drainage basin where there new development fee is $3,717 per acre, subject to the runoff coefficient and amount of impervious surface. This fee is paid at the time the building permit is issued. The standard drainage and erosion control reports and construction plans are required and they must be prepared by a professional engineer registered in Colorado. Onsite detention is required with a two-year historic release rate for water quantity and extended detention is required for water quality treatment. In the McClelland's/Mail Creek drainage basin onsite detention is required with a 0.2 cfs/ac release rate for the 10 year storm and a 0.5 cfs/ac release rate for the 100-year storm. Water quality extended detention is required to treat the runoff. The detention for the Post Office is along their east and southern boundaries and was sized before the present rainfall requirements. It does not have a water quality component designed into it so a separate onsite detention pond is probably the best choice. The design engineer has the option to retrofit the Post Office detention pond but it may not have enough volume potential to detain for this new use. There is an existing inlet shown on the concept plan along the driveway that would be the logical outlet for a detention pond. It presently drains through the Post Office system. I'm not sure if the system has an easement all the way to the outlet. I'm pretty sure the existing detention pond and the outlet are in drainage easements so easements may be needed on the system entering the existing pond. For further information, please contact Glen Schlueter, 221-6700. 3 OF CONCEPTUAL REVIEW STAFF COMMENTS City of Fort Collins ITEM: New Office Building at U.S.P.S. Aspen Station — Southeast Corner of J.F.K. Parkway and Boardwalk Drive MEETING DATE: January 31, 2005 APPLICANT: U.S.P.S. c/o Mr. Peter Kast, Realtec Commercial Real Estate Services, 255 East Monroe Drive, Fort Collins, CO 80525 LAND USE DATA: Request for a new office building on the vacant portion of the U.S. Postal Service Aspen Station at the southeast corner of J.F.K. Parkway and Boardwalk Drive. The two-story building would contain approximately 13,500 square feet in size. The first floor building footprint would be approximately 5,000 square feet in size. A new one-way private drive, with head -in diagonal parking, would serve the building. COMMENTS: 1. The site is zoned E, Employment. Office buildings are a permitted use subject to review by the Hearing Officer (Type One Review). One of the handicap parking stalls must be van -accessible and be 16-feet in width. Be sure to provide bicycle parking near the front entrance. A recent code change has been approved by City Council that will require the trash enclosure to be large enough to accommodate containers for recyclable materials. The size is flexible based on the needs of the office user. A design guideline booklet is available to assist the design team. 2. The build -to line along J.F.K. Parkway and Boardwalk is between 15 and 25 feet behind the property line. 3. The conceptual plan complies with the Orientation to a Connecting Walkway standard in Section 3.5.3(B)(1). In addition, the plan complies with the maximum allowable parking standard for a general office building. 4. Please be aware that the maximum number of parking stalls for medical office may be increased to 4.5 spaces per 1,000 square feet. There is an "exception to the standard" provision if more parking is needed over the allowable maximum. COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 721 N. College Ave. P.O. Box 580 Fort Collins, CO 80522-0580 (970) 221-6750 CURRENT PLANNING DEPARTMENT Comm__tity Planning and Environments_ Services Current Planning City of Fort Collins February 2, 2005 Mr. Peter Kast Realtec Commercial Real Estate Services 255 East Monroe Drive Fort Collins, CO 80525 Dear Mr. Kast: For your information, attached is a copy of the Staffs comments for the New Office Building at the U.S.P.S. Aspen Station — Southeast Corner of J.F.K. Parkway and Boardwalk Drive, which was presented before the Conceptual Review Team on January 24, 2005. The comments are offered by staff to assist you in preparing the detailed components of the project application. Modifications and additions to these comments may be made at the time of formal review of this project. If you should have any questions regarding these comments or the next steps in the review process, please feel free to call me at 970-221-6750. Sincerely, Ted Shepard Chief Planner cc: Project Planner File 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020