HomeMy WebLinkAboutFOX POINTE PLAZA - PDP - 16-06 - CORRESPONDENCE - (5)Department: Zoning Issue Contact: Gary Lopez Topic: Zoning Number: 2 Created: 6/27/2006 [6/27/061 Indicate bldg. dimensions and distance to property lines on site plans. Number: 3 Created: 6/27/2006 [6/27/061 Please estimate building square footages for restaurant and general office use (including Coffee drive up) and provide max. parking requirements and actual parking numbers. Number: 4 Created: 6/27/2006 [6/27/06] Include in plant notes that no Certificate of Occupancy can be issued without landscaping completion or financial securement in the amount of 125% of the value of the landscaping. This represents staff (and outside reviewing agencies) review and comments at this time. Additional comments and red -lined plans may be forthcoming. Another round of staff review is determined to be necessary. This proposal is subject to the 90-day revision re -submittal requirement (from the date of this comment letter, being July 7, 2006) as set forth in Section 2.2.11(A) of the Land Use Code. Be sure and return all red -lined plans when you re -submit. The number of copies of each document to re -submit is shown on the attached Revisions Routing Sheet. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at 221-6341. Yours Truly, teve Olt City Planner cc: Randy Maizland Current Planning file # 16=06 Page 10 Number: 54 Created: 7/3/2006 [7/3/06] The intersection of Boardwalk/Landings/Post Office should be considered as an single -lane roundabout. The intersection has been problematic since it was constructed and continues to worsen. A traffic signal is not an option at this location. Department: Transportation Planning Issue Contact: David Averill Topic: General Number: 61 Created: 7 / 5 / 2006 [7/5/06] No issues or comments. Department: Stormwater-Water-Wastewater Issue Contact: Wes Lamarque Topic: Stormwater Number: 55 Created: 7/4/ 2006 [7/4/06] Off -site flows along boardwalk need to be quantified to determine if these flows would affect the building. Since the building is below the street, this is especially important. Number: 56 Created: 7 / 4 / 2006 [7/4/06] Please show and label the retaining wall with TOW and BOW elevations. Number: 57 Created: 7/4/2006 [7/4/06] An off -site drainage easement may be required for the outfall storm sewer if this area is off -site. It is not clear where the property boundary is. Number: 58 Created: 7 / 4 / 2006 [7/4/06] Please label the drainage pan and slope along the swale. The swale needs to carry 1.33 times the 100-year flow. Number: 75 Created: 7/7/2006 [7/7/06] A drainage easement is required for the limits of the detention pond. A 20-foot drainage easement is also required for the outfall pipe. Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington Topic: Water/WW Number: 59 Created: 7 / 5 / 2006 [7 / 5 / 06] Provide overall utility plan showing all water/ sanitary sewer mains and services to provide service to the site. Page 9 Department: PFA Issue Contact: Carie Dann Topic: Fire Number: 62 Created: 7/6/2006 [7/6/06] AUTOMATIC FIRE SPRINKLERS: The office/retail building shall be equipped with an approved, automatic fire sprinkler system. Number: 63 Created: 7/6/2006 [7/6/06] FDC: The Fire Department Connection for the office/retail building sprinkler system shall be mounted in a location approved by PFA, to ensure fire apparatus have adequate access to the FDC. Number: 64 Created: 7/6/2006 [7/6/06] KNOX BOX: A Knox Box is required to be mounted at the main entrance of any building equipped with an automatic fire sprinkler system. Number: 65 Created: 7/6/2006 [7/6/06] FIRE LANE: A fire lane is required. This fire lane shall be visible by painting and signage, and maintained unobstructed at all times. A fire lane plan shall be submitted for approval prior to installation. The fire lane is required to be designated on the plat as an Emergency Access Easement. The fire lane shall be a flat, hard, all-weather driving surface. The owner shall maintain the required minimum width of 20 feet throughout the length of the fire lane. Contact Carie Dann for specific fire lane location. Number: 66 Created: 7/6/2006 [7/6/06] WATER SUPPLY: Every building must be within 300 feet of a fire hydrant that is capable of flowing a minimum 1,500 gpm at 20 psi residual pressure. Number: 67 Created: 7/6/2006 [7/6/06] ADDRESSING: In addition to the address kiosk, address numerals shall be posted on each building, with numerals a minimum 6 inches high. The buildings shall be addressed off Boardwalk, so the numerals must be mounted on the Boardwalk side of the buildings. Number: 68 Created: 7/6/2006 [7/6/06] TURNING RADII: Minimum turning radii throughout the fire lane is 25 feet inside, 50 feet outside. Department: Traffic Operations Issue Contact: Eric Bracke Topic: Traffic Number: 53 Created: 7/3/2006 [7/3/06] The Traffic Study is acceptable. I do have concerns with the ri/ro and the slopes coming into the site. I wait for the utility plans to review. ++*** ( ( () ) ) 1 1 1'3'3'3%%0 ###1111 [1 i i i ♦AAVPFaj j1M_1F<-<-TTTyyIjjj- §§§111iiiiii$t:*►►444 the pork chop to meet minimum ADA slope requirements instead of ramping up and down over it. Number: 17 Created: 6 / 28 / 2006 [6/28/06] Please use a bold line type for the proposed utility connections and the north arrow. Topic: Technical Services Number: 69 Created: 7/6/2006 [7/6/06] The Landscape Plan and Site Plan are not acceptable for scanning purposes. Please see redlines for scanning quality related comments. Number: 70 Created: 7/6/2006 [7/6/06] Boundary and legal close. Please correct small typo in the legal description. Number: 71 Created: 7/6/2006 [7/6/06] The Basis of Bearings statement does not match the Plat. Number: 72 Created: 7/6/2006 [7/6/06] Please provide documentation showing how JFK and Boardwalk were dedicated. Number: 73 Created: 7/6/2006 [7/6/06] This is a re -plat of a portion of Observatory Heights. Please show and state this. Number: 74 Created: 7/6/2006 [7/6/06] Show additional ROW dedication along Boardwalk to back of proposed sidewalk along entire frontage. This ROW dedication will cover and replace the existing utility easement. No additional utility easement behind the ROW will be required. See utility plans for clarification. Department: Light & Power Issue Contact: Doug Martine Topic: Electric Utility Number: 1 Created: 6 / 20 / 2006 [6/20/06] The developer will need to coordinate power requirements, a location for a pad type transformer, and electric development charges with Light & Power Engineering (970)221-6700. Department: Natural Resources Topic: General Number: 60 [7/5/06] No issues. Issue Contact: Doug Moore Created: 7/5/2006 Page 7 Number: 31 Created: 6/28/2006 [6/28/061 The right out egress "pork chop" should be skewed more to deter anyone from trying to make a left turn onto Boardwalk, per the City Traffic operations engineer. Number: 32 Created: 6/28/2006 [6/28/061 ADA ramps across the pork chop should line up better with the corner ramps. Show more street design elevations (flow line, top of curb etc...) on the plan. Number: 33 Created: 6/28/2006 [6/28/061 Add the City standard street cut note, attached, to the plan sheet. Topic: Site Plan Number: 10 Created: 6/28/2006 [6/28/06] Standard parking stall size is 9 x 19 feet. Please dimension all drive isles. Number: 11 Created: 6/28/2006 [6/28/06] Due to the addition of the right turn lane and relocation of the sidewalk, a right-of-way dedication will be required along Boardwalk such that all of the sidewalk is within right-of-way. Unless the utility providers object, all utilities along Boardwalk will then also be within right-of-way, and no 8 foot utility easement will be needed behind the R.O.W. Number: 12 Created: 6/28/2006 [6/28/06] Label proposed R.O.W. on the Site Plan and provide dimension from centerline of Boardwalk. Number: 13 Created: 6/28/2006 [6/28/06] All intersections and drive approaches must me A.D.A. access requirements. Show ramps where needed. Number: 14 Created: 6/28/2006 [6/28/06] All attached sidewalk shall conform to current standard width of 8 feet. Show new 8 foot wide sidewalk transition from JFK and along Boardwalk. Number: 15 Created: 6/28/2006 [6/28/06] Show any proposed retaining walls on the site plan labeled with wall height. Number: 16 Created: 6/28/2006 [6/28/06] ADA access ramps across the pork chop in the right turn lane access should line up as straight as possible. You may need to cut though Page 6 east past the access. Street drainage will need to directed to an inlet near the access. See redline comments. No street drainage shall be directed into the access of the site. A high point elevation must be shown at the ingress/egress on Boardwalk. Number: 26 1Created: 6/28/2006 [6/28/06] Please show the water and sanitary sewer service connections on the Grading Plan for reference. Number: 27 Created: 6/28/2006 [6/28/06] Show all attached sidewalk as 8 feet wide. Transition from 8 to 6 feet wide on JFK. Topic: Plat Number: 18 Created: 6/28/2006 [6/28/06] Please make sure all text fits within the border on the cover sheet. Number: 19 Created: 6/28/2006 [6/28/06] Dedication of R.O.W. along Boardwalk should extend to back of sidewalk. Unless utilities object, no additional utility easement will be required behind the new R.O.W.. Please show dimension of new R.O.W. from centerline on Boardwalk. Number: 20 Created: 6/28/2006 [6/28/06] A reciprocal, shared access easement will be needed on the Post Office property. Please dedicate this easement on the plat. Number: 21 Created: 6/28/2006 [6/28/06] A temporary construction easement, by separate document, will need to be provided by the Post Office prior to permit issuance. Please provide a copy of the recorded document for reference. Topic: Rt Turn Lane Plan Number: 28 Created: 6/28/2006 [6/28/06] Show and label limits of new proposed R.O.W. Number: 29 Created: 6/28/2006 [6/28/06] Show new 8 foot wide attached sidewalk along Boardwalk. Number: 30 Created: 6/28/2006 [6/28/06] The proposed street drainage and concrete pan flow line shown will not be approved. All street drainage from Boardwalk shall be conveyed to the gutter and a drain inlet installed near the access. See redline comments. Provide flow line elevations and new typical cross section. Provide a detail for the inlet. Page 5 Number: 7 Created: 6/28/2006 [6/28/061 Revise the Index and City signature block per the redline comments. Provide a reference to the Geotechnical Engineer and report submitted. Provide standard engineers statement attached to redlines on cover sheet. Number: 8 Created: 6/28/2006 [6/28/061 No standard General Notes sheet was provided with this submittal. Please include the general notes (Sheet 2) with your next submittal for review. Topic: General Comments Number: 34 Created: 6/28/2006 [6/28/06] Please complete the attached Development Agreement Information Sheet with your next submittal. A Draft Development Agreement will be prepared with your next round of review. Number: 35 Created: 6/28/2006 none Topic: General Notes Number: 9 Created: 6/28/2006 [6/28/06] No City General Notes were provided with this plan set submittal. Please include with your next round of review. Topic: Grading 8s Drainage Plan Number: 22 Created: 6/28/2006 [6/28/06] Show and label the limits of grading including within the R.O.W. and on Post Office site. Number: 23 Created: 6/28/2006 [6/28/06] All proposed retaining walls need to be shown on the Grading Plan. Any walls over 30 inches in height must be labeled - Under Separate Permit By Building Department. Please provide adequate number of wall elevations, top and bottom. Show drainage behind the walls. Number: 24 Created: 6/28/2006 16/28/061 Proposed connection to the existing 5 foot Type R curb inlet on the Post Office site will need a drainage easement dedication. Please show this drainage easement on the plat. Number: 25 Created: 6/28/2006 [6/28/06] Street grading and drainage for the right turn lane on Boardwalk will not be approved as shown. All drainage shall be conveyed to the curb 8s gutter at a 2 percent cross slope to match the existing road section. No outfall gutter or concrete pan shall be used to convey the street drainage Page 4 light? Is it the fluorescent source that makes it that high and could another type fixture be used? Just to reiterate, Section 3.2.4(D)(3) states that "Light sources shall be concealed and full shielded and shall feature sharp cut-off capability so as to minimize up -light, spill -light, glare and unnecessary diffusion on adjacent property". Also, Section 3.2.4(D)(7) states that "Maximum on -site lighting levels shall not exceed ten (10) foot-candles, except for loading and unloading platforms where the maximum lighting level shall be twenty (20) foot-candles". Topic: Site Plan Number: 37 Created: 6/30/2006 [6/30/061 The Site Plan must identify all proposed uses in the buildings. The "Drive -Up Building Area" must be identified as Drive-Thru Coffee, as shown on the Landscape Plan. The Site Plan must also identify the larger building as containing a restaurant (if truly intended), as shown on the Landscape Plan. Number: 42 Created: 6/30/2006 [6/30/06] There will be awkward vehicular movement and crossover between the 2 drive-thru lanes for the coffee shop. At the west end of the building there is also the possibility that a car or cars stopped to read the menu board could block cars wanting to exit the lane on the north side of the building. Number: 43 Created: 6/30/2006 [6/30/06] Based on the Site Plan layout, service access to the businesses, especially in the larger Office/Retail/Restaurant building, could be difficult. Number: 44 Created: 6/30/2006 [6/30/06] Is the crosswalk from the small, drive -up building to the larger building going to be an enhanced pedestrian crossing, or could it be? It is in an awkward location relative to the potential vehicular movement and crossovers. Department: Engineering Issue Contact: Randy Maizland Topic: Cover Sheet Number: 5 Created: 6/28/2006 [6/28/06] Provide month and year under title, correct spelling/grammar in title. Label Vicinity Map, Vicinity Map should be at a larger scale to show location with respect to larger City arterial streets adjacent. Number: 6 Created: 6/28/2006 [6/28/06] Bench mark data and basis of bearings shall be shown on the cover sheet. Page 3 Number: 40 Created: 6/30/2006 [6/30/06] There is overlapping information on some of the plans that make some notes and labels difficult to read or totally illegible. Number: 41 Created: 6/30/2006 (6/30/06] The proposed amount of parking for this development plan (a convenience shopping center) is 39 spaces, which is within the allowable 5 spaces per 1,000 square feet of total leasable floor area, being somewhere between 11,825 square feet & 12,144 square feet (depending on reconciling the square footages on the Site & Landscape Plans). Number: 45 Created: 6/30/2006 [6/30/06] There should be a detail of the trash enclosure on the plans, possibly on the Site Plan or Building Elevations Plan. Number: 46 Created: 6/30/2006 [6/30/06] The existing 8v proposed utilities should be on the Landscape Plan but do not have to be and could be eliminated from the Site Plan, which would "clean it up" a bit. Topic: General Notes Number: 36 Created: 6/30/2006 [6/30/061 The General Notes as shown on Sheet 1 of 2 of the Landscape Plan must be on the Site Plan. Topic: Landscape Plan Number: 48 Created: 6/30/2006 [6/30/06] There are several discrepancies between the Landscape Plan and the Site Plan. Number: 50 Created: 7/3/2006 [7/3/06] There are several areas on the Landscape Plan that need additional shrub plantings to satisfy the requirement to screen parking & vehicular use areas, per Section 3.2.1(E)(4) of the Land Use Code. Please see the red -lined plan. Number: 52 Created: 7/3/2006 [7/3/06] Two more Linden trees are needed as street trees along both JFK Parkway and Boardwalk Drive. Please see red -lined Landscape Plan for locations. Topic: Lighting Plan Number: 51 Created: 7/3/2006 [7/3/06] There are a couple of spots on the Lighting/Photometric Plan that are right on or just over the allowable level of 10 foot-candles. Why would the "Type B" light over the entry to the larger building create that much ++***((0)), 1�'3'3'30$$$$$$$$$$$ 11uiii AAA ffyyytti --- §§§111j!iiiittt►►►��� i' STAFF PROJECT REVIEW City of Fort Collins ZTI Group/Architecture Date: 07/07/2006 c/o Edward G. Zdenek 631 West Mulberry Street Fort Collins, CO. 80521 Staff has reviewed your submittal for FOX POINTE PLAZA, PDP - TYPE 2, and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Steve Olt Topic: Building Elevations Number: 47 Created: 6/30/2006 [6/30/061 The drive-thru coffee building is very nice looking. However, the elevations are quite small and some of the information is very difficult to read. Could these elevations be enlarged somewhat? What do the numbers in the squares refer to on all 4 elevations? There is no legend on the Building Elevations Plan. Number: 49 Created: 6/30/2006 [6/30/06] The larger, 2-story Office/Retail/Restaurant (maybe) building is very nice looking. However, the west elevation does not appear to satisfy the standard set forth in Section 3.5.3(C)(1) of the Land Use Code. This section states that the horizontal mass shall not exceed a height -width ratio of 1:3 without substantial variation in massing that includes a change in height and a projecting or recessed element. This elevation is 120' long and is 28.5' high, for a ratio of approximately 1:4. Therefore, there should be some element of height change on this elevation. Topic: General Comments Number: 38 Created: 6/30/2006 [6/30/06] The proposed building sizes are inconsistent between the Site Plan and the Landscape Plan. The Site Plan shows the small building to be 325 square feet and the Landscape Plan shows the same building to be 400 square feet. The Site Plan shows the larger building to be 11,744 square feet and the Landscape Plan shows the same building to be 11,500 square feet. Please reconcile this discrepancy. Number: 39 Created: 6/30/2006 [6/30/06] It is very difficult to follow the existing and proposed sidewalk locations on both the Site and Landscape Plans. Page 1 LSteve Olt - Fox Pointe, PDP staff comme Page 1 From: Steve Olt To: tcvar@jub.com Date: 07/10/2006 9:22:42 AM Subject: Fox Pointe, PDP staff comments Tom, As promised, attached is the City staff comment letter for the Fox Pointe, Project Development Plan (Moomey Plaza) currently under review. As I indicated on the phone, Ed Zdenek did pick up the red -lined plans and comment letter last Friday, July 7th. You will have to get the appropriate plans from him. Steve Olt Project Planner