HomeMy WebLinkAboutFOX POINTE PLAZA - PDP - 16-06 - CORRESPONDENCE - (5)Department: Zoning Issue Contact: Gary Lopez
Topic: Zoning
Number: 2 Created: 6/27/2006
[6/27/061 Indicate bldg. dimensions and distance to property lines on site
plans.
Number: 3 Created: 6/27/2006
[6/27/061 Please estimate building square footages for restaurant and
general office use (including Coffee drive up) and provide max. parking
requirements and actual parking numbers.
Number: 4 Created: 6/27/2006
[6/27/06] Include in plant notes that no Certificate of Occupancy can be
issued without landscaping completion or financial securement in the
amount of 125% of the value of the landscaping.
This represents staff (and outside reviewing agencies) review and comments
at this time. Additional comments and red -lined plans may be forthcoming.
Another round of staff review is determined to be necessary. This proposal
is subject to the 90-day revision re -submittal requirement (from the
date of this comment letter, being July 7, 2006) as set forth in Section
2.2.11(A) of the Land Use Code. Be sure and return all red -lined plans
when you re -submit. The number of copies of each document to re -submit
is shown on the attached Revisions Routing Sheet.
If you have any questions regarding these issues or any other issues related
to this project, please feel free to call me at 221-6341.
Yours Truly,
teve Olt
City Planner
cc: Randy Maizland
Current Planning file # 16=06
Page 10
Number: 54 Created: 7/3/2006
[7/3/06] The intersection of Boardwalk/Landings/Post Office should be
considered as an single -lane roundabout. The intersection has been
problematic since it was constructed and continues to worsen. A traffic
signal is not an option at this location.
Department: Transportation Planning Issue Contact: David Averill
Topic: General
Number: 61 Created: 7 / 5 / 2006
[7/5/06] No issues or comments.
Department: Stormwater-Water-Wastewater Issue
Contact: Wes Lamarque
Topic: Stormwater
Number: 55 Created: 7/4/ 2006
[7/4/06] Off -site flows along boardwalk need to be quantified to determine
if these flows would affect the building. Since the building is below the
street, this is especially important.
Number: 56 Created: 7 / 4 / 2006
[7/4/06] Please show and label the retaining wall with TOW and BOW
elevations.
Number: 57 Created: 7/4/2006
[7/4/06] An off -site drainage easement may be required for the outfall
storm sewer if this area is off -site. It is not clear where the property
boundary is.
Number: 58 Created: 7 / 4 / 2006
[7/4/06] Please label the drainage pan and slope along the swale. The
swale needs to carry 1.33 times the 100-year flow.
Number: 75 Created: 7/7/2006
[7/7/06] A drainage easement is required for the limits of the detention
pond. A 20-foot drainage easement is also required for the outfall pipe.
Department: Stormwater-Water-Wastewater Issue
Contact: Roger Buffington
Topic: Water/WW
Number: 59 Created: 7 / 5 / 2006
[7 / 5 / 06] Provide overall utility plan showing all water/ sanitary sewer
mains and services to provide service to the site.
Page 9
Department: PFA Issue Contact: Carie Dann
Topic: Fire
Number: 62 Created: 7/6/2006
[7/6/06] AUTOMATIC FIRE SPRINKLERS: The office/retail building shall
be equipped with an approved, automatic fire sprinkler system.
Number: 63 Created: 7/6/2006
[7/6/06] FDC: The Fire Department Connection for the office/retail
building sprinkler system shall be mounted in a location approved by PFA,
to ensure fire apparatus have adequate access to the FDC.
Number: 64 Created: 7/6/2006
[7/6/06] KNOX BOX: A Knox Box is required to be mounted at the main
entrance of any building equipped with an automatic fire sprinkler system.
Number: 65 Created: 7/6/2006
[7/6/06] FIRE LANE: A fire lane is required. This fire lane shall be visible
by painting and signage, and maintained unobstructed at all times. A fire
lane plan shall be submitted for approval prior to installation. The fire lane
is required to be designated on the plat as an Emergency Access Easement.
The fire lane shall be a flat, hard, all-weather driving surface. The owner
shall maintain the required minimum width of 20 feet throughout the length
of the fire lane. Contact Carie Dann for specific fire lane location.
Number: 66 Created: 7/6/2006
[7/6/06] WATER SUPPLY: Every building must be within 300 feet of a fire
hydrant that is capable of flowing a minimum 1,500 gpm at 20 psi residual
pressure.
Number: 67 Created: 7/6/2006
[7/6/06] ADDRESSING: In addition to the address kiosk, address numerals
shall be posted on each building, with numerals a minimum 6 inches high.
The buildings shall be addressed off Boardwalk, so the numerals must be
mounted on the Boardwalk side of the buildings.
Number: 68 Created: 7/6/2006
[7/6/06] TURNING RADII: Minimum turning radii throughout the fire lane
is 25 feet inside, 50 feet outside.
Department: Traffic Operations Issue Contact: Eric Bracke
Topic: Traffic
Number: 53 Created: 7/3/2006
[7/3/06] The Traffic Study is acceptable. I do have concerns with the ri/ro
and the slopes coming into the site. I wait for the utility plans to review.
++*** ( ( () ) ) 1 1 1'3'3'3%%0 ###1111 [1 i i i ♦AAVPFaj j1M_1F<-<-TTTyyIjjj- §§§111iiiiii$t:*►►444
the pork chop to meet minimum ADA slope requirements instead of ramping
up and down over it.
Number: 17 Created: 6 / 28 / 2006
[6/28/06] Please use a bold line type for the proposed utility connections
and the north arrow.
Topic: Technical Services
Number: 69 Created: 7/6/2006
[7/6/06] The Landscape Plan and Site Plan are not acceptable for scanning
purposes. Please see redlines for scanning quality related comments.
Number: 70 Created: 7/6/2006
[7/6/06] Boundary and legal close. Please correct small typo in the legal
description.
Number: 71 Created: 7/6/2006
[7/6/06] The Basis of Bearings statement does not match the Plat.
Number: 72 Created: 7/6/2006
[7/6/06] Please provide documentation showing how JFK and Boardwalk
were dedicated.
Number: 73 Created: 7/6/2006
[7/6/06] This is a re -plat of a portion of Observatory Heights. Please show
and state this.
Number: 74 Created: 7/6/2006
[7/6/06] Show additional ROW dedication along Boardwalk to back of
proposed sidewalk along entire frontage. This ROW dedication will cover and
replace the existing utility easement. No additional utility easement behind
the ROW will be required. See utility plans for clarification.
Department: Light & Power Issue Contact: Doug Martine
Topic: Electric Utility
Number: 1 Created: 6 / 20 / 2006
[6/20/06] The developer will need to coordinate power requirements, a
location for a pad type transformer, and electric development charges with
Light & Power Engineering (970)221-6700.
Department: Natural Resources
Topic: General
Number: 60
[7/5/06] No issues.
Issue Contact: Doug Moore
Created: 7/5/2006
Page 7
Number: 31 Created: 6/28/2006
[6/28/061 The right out egress "pork chop" should be skewed more to deter
anyone from trying to make a left turn onto Boardwalk, per the City Traffic
operations engineer.
Number: 32 Created: 6/28/2006
[6/28/061 ADA ramps across the pork chop should line up better with the
corner ramps. Show more street design elevations (flow line, top of curb
etc...) on the plan.
Number: 33 Created: 6/28/2006
[6/28/061 Add the City standard street cut note, attached, to the plan
sheet.
Topic: Site Plan
Number: 10 Created: 6/28/2006
[6/28/06] Standard parking stall size is 9 x 19 feet. Please dimension all
drive isles.
Number: 11 Created: 6/28/2006
[6/28/06] Due to the addition of the right turn lane and relocation of the
sidewalk, a right-of-way dedication will be required along Boardwalk such
that all of the sidewalk is within right-of-way. Unless the utility providers
object, all utilities along Boardwalk will then also be within right-of-way,
and no 8 foot utility easement will be needed behind the R.O.W.
Number: 12 Created: 6/28/2006
[6/28/06] Label proposed R.O.W. on the Site Plan and provide dimension
from centerline of Boardwalk.
Number: 13 Created: 6/28/2006
[6/28/06] All intersections and drive approaches must me A.D.A. access
requirements. Show ramps where needed.
Number: 14 Created: 6/28/2006
[6/28/06] All attached sidewalk shall conform to current standard width of
8 feet. Show new 8 foot wide sidewalk transition from JFK and along
Boardwalk.
Number: 15 Created: 6/28/2006
[6/28/06] Show any proposed retaining walls on the site plan labeled with
wall height.
Number: 16 Created: 6/28/2006
[6/28/06] ADA access ramps across the pork chop in the right turn lane
access should line up as straight as possible. You may need to cut though
Page 6
east past the access. Street drainage will need to directed to an inlet near
the access. See redline comments. No street drainage shall be directed into
the access of the site. A high point elevation must be shown at the
ingress/egress on Boardwalk.
Number: 26 1Created: 6/28/2006
[6/28/06] Please show the water and sanitary sewer service connections on
the Grading Plan for reference.
Number: 27 Created: 6/28/2006
[6/28/06] Show all attached sidewalk as 8 feet wide. Transition from 8 to 6
feet wide on JFK.
Topic: Plat
Number: 18 Created: 6/28/2006
[6/28/06] Please make sure all text fits within the border on the cover
sheet.
Number: 19 Created: 6/28/2006
[6/28/06] Dedication of R.O.W. along Boardwalk should extend to back of
sidewalk. Unless utilities object, no additional utility easement will be
required behind the new R.O.W.. Please show dimension of new R.O.W. from
centerline on Boardwalk.
Number: 20 Created: 6/28/2006
[6/28/06] A reciprocal, shared access easement will be needed on the Post
Office property. Please dedicate this easement on the plat.
Number: 21 Created: 6/28/2006
[6/28/06] A temporary construction easement, by separate document, will
need to be provided by the Post Office prior to permit issuance. Please
provide a copy of the recorded document for reference.
Topic: Rt Turn Lane Plan
Number: 28 Created: 6/28/2006
[6/28/06] Show and label limits of new proposed R.O.W.
Number: 29 Created: 6/28/2006
[6/28/06] Show new 8 foot wide attached sidewalk along Boardwalk.
Number: 30 Created: 6/28/2006
[6/28/06] The proposed street drainage and concrete pan flow line shown
will not be approved. All street drainage from Boardwalk shall be conveyed
to the gutter and a drain inlet installed near the access. See redline
comments. Provide flow line elevations and new typical cross section.
Provide a detail for the inlet.
Page 5
Number: 7 Created: 6/28/2006
[6/28/061 Revise the Index and City signature block per the redline
comments. Provide a reference to the Geotechnical Engineer and report
submitted. Provide standard engineers statement attached to redlines on
cover sheet.
Number: 8 Created: 6/28/2006
[6/28/061 No standard General Notes sheet was provided with this
submittal. Please include the general notes (Sheet 2) with your next
submittal for review.
Topic: General Comments
Number: 34 Created: 6/28/2006
[6/28/06] Please complete the attached Development Agreement
Information Sheet with your next submittal. A Draft Development
Agreement will be prepared with your next round of review.
Number: 35 Created: 6/28/2006
none
Topic: General Notes
Number: 9 Created: 6/28/2006
[6/28/06] No City General Notes were provided with this plan set
submittal. Please include with your next round of review.
Topic: Grading 8s Drainage Plan
Number: 22 Created: 6/28/2006
[6/28/06] Show and label the limits of grading including within the R.O.W.
and on Post Office site.
Number: 23 Created: 6/28/2006
[6/28/06] All proposed retaining walls need to be shown on the Grading
Plan. Any walls over 30 inches in height must be labeled - Under Separate
Permit By Building Department. Please provide adequate number of wall
elevations, top and bottom. Show drainage behind the walls.
Number: 24 Created: 6/28/2006
16/28/061 Proposed connection to the existing 5 foot Type R curb inlet on
the Post Office site will need a drainage easement dedication. Please show
this drainage easement on the plat.
Number: 25 Created: 6/28/2006
[6/28/06] Street grading and drainage for the right turn lane on Boardwalk
will not be approved as shown. All drainage shall be conveyed to the curb 8s
gutter at a 2 percent cross slope to match the existing road section. No
outfall gutter or concrete pan shall be used to convey the street drainage
Page 4
light? Is it the fluorescent source that makes it that high and could another
type fixture be used? Just to reiterate, Section 3.2.4(D)(3) states that "Light
sources shall be concealed and full shielded and shall feature sharp cut-off
capability so as to minimize up -light, spill -light, glare and unnecessary
diffusion on adjacent property". Also, Section 3.2.4(D)(7) states that
"Maximum on -site lighting levels shall not exceed ten (10) foot-candles,
except for loading and unloading platforms where the maximum lighting
level shall be twenty (20) foot-candles".
Topic: Site Plan
Number: 37 Created: 6/30/2006
[6/30/061 The Site Plan must identify all proposed uses in the buildings.
The "Drive -Up Building Area" must be identified as Drive-Thru Coffee, as
shown on the Landscape Plan. The Site Plan must also identify the larger
building as containing a restaurant (if truly intended), as shown on the
Landscape Plan.
Number: 42 Created: 6/30/2006
[6/30/06] There will be awkward vehicular movement and crossover
between the 2 drive-thru lanes for the coffee shop. At the west end of the
building there is also the possibility that a car or cars stopped to read the
menu board could block cars wanting to exit the lane on the north side of
the building.
Number: 43 Created: 6/30/2006
[6/30/06] Based on the Site Plan layout, service access to the businesses,
especially in the larger Office/Retail/Restaurant building, could be difficult.
Number: 44 Created: 6/30/2006
[6/30/06] Is the crosswalk from the small, drive -up building to the larger
building going to be an enhanced pedestrian crossing, or could it be? It is in
an awkward location relative to the potential vehicular movement and
crossovers.
Department: Engineering Issue Contact: Randy Maizland
Topic: Cover Sheet
Number: 5 Created: 6/28/2006
[6/28/06] Provide month and year under title, correct spelling/grammar in
title. Label Vicinity Map, Vicinity Map should be at a larger scale to show
location with respect to larger City arterial streets adjacent.
Number: 6 Created: 6/28/2006
[6/28/06] Bench mark data and basis of bearings shall be shown on the
cover sheet.
Page 3
Number: 40 Created: 6/30/2006
[6/30/06] There is overlapping information on some of the plans that make
some notes and labels difficult to read or totally illegible.
Number: 41 Created: 6/30/2006
(6/30/06] The proposed amount of parking for this development plan (a
convenience shopping center) is 39 spaces, which is within the allowable 5
spaces per 1,000 square feet of total leasable floor area, being somewhere
between 11,825 square feet & 12,144 square feet (depending on reconciling
the square footages on the Site & Landscape Plans).
Number: 45 Created: 6/30/2006
[6/30/06] There should be a detail of the trash enclosure on the plans,
possibly on the Site Plan or Building Elevations Plan.
Number: 46 Created: 6/30/2006
[6/30/06] The existing 8v proposed utilities should be on the Landscape
Plan but do not have to be and could be eliminated from the Site Plan,
which would "clean it up" a bit.
Topic: General Notes
Number: 36 Created: 6/30/2006
[6/30/061 The General Notes as shown on Sheet 1 of 2 of the Landscape
Plan must be on the Site Plan.
Topic: Landscape Plan
Number: 48 Created: 6/30/2006
[6/30/06] There are several discrepancies between the Landscape Plan and
the Site Plan.
Number: 50 Created: 7/3/2006
[7/3/06] There are several areas on the Landscape Plan that need
additional shrub plantings to satisfy the requirement to screen parking &
vehicular use areas, per Section 3.2.1(E)(4) of the Land Use Code. Please see
the red -lined plan.
Number: 52 Created: 7/3/2006
[7/3/06] Two more Linden trees are needed as street trees along both JFK
Parkway and Boardwalk Drive. Please see red -lined Landscape Plan for
locations.
Topic: Lighting Plan
Number: 51 Created: 7/3/2006
[7/3/06] There are a couple of spots on the Lighting/Photometric Plan that
are right on or just over the allowable level of 10 foot-candles. Why would
the "Type B" light over the entry to the larger building create that much
++***((0)), 1�'3'3'30$$$$$$$$$$$ 11uiii AAA ffyyytti --- §§§111j!iiiittt►►►���
i'
STAFF PROJECT REVIEW
City of Fort Collins
ZTI Group/Architecture Date: 07/07/2006
c/o Edward G. Zdenek
631 West Mulberry Street
Fort Collins, CO. 80521
Staff has reviewed your submittal for FOX POINTE PLAZA, PDP - TYPE 2,
and we offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Steve Olt
Topic: Building Elevations
Number: 47 Created: 6/30/2006
[6/30/061 The drive-thru coffee building is very nice looking. However, the
elevations are quite small and some of the information is very difficult to
read. Could these elevations be enlarged somewhat? What do the numbers
in the squares refer to on all 4 elevations? There is no legend on the
Building Elevations Plan.
Number: 49 Created: 6/30/2006
[6/30/06] The larger, 2-story Office/Retail/Restaurant (maybe) building is
very nice looking. However, the west elevation does not appear to satisfy the
standard set forth in Section 3.5.3(C)(1) of the Land Use Code. This section
states that the horizontal mass shall not exceed a height -width ratio of 1:3
without substantial variation in massing that includes a change in height
and a projecting or recessed element. This elevation is 120' long and is 28.5'
high, for a ratio of approximately 1:4. Therefore, there should be some
element of height change on this elevation.
Topic: General Comments
Number: 38 Created: 6/30/2006
[6/30/06] The proposed building sizes are inconsistent between the Site
Plan and the Landscape Plan. The Site Plan shows the small building to be
325 square feet and the Landscape Plan shows the same building to be 400
square feet. The Site Plan shows the larger building to be 11,744 square feet
and the Landscape Plan shows the same building to be 11,500 square feet.
Please reconcile this discrepancy.
Number: 39 Created: 6/30/2006
[6/30/06] It is very difficult to follow the existing and proposed sidewalk
locations on both the Site and Landscape Plans.
Page 1
LSteve Olt - Fox Pointe, PDP staff comme Page 1
From:
Steve Olt
To:
tcvar@jub.com
Date:
07/10/2006 9:22:42 AM
Subject:
Fox Pointe, PDP staff comments
Tom,
As promised, attached is the City staff comment letter for the Fox Pointe, Project Development Plan
(Moomey Plaza) currently under review. As I indicated on the phone, Ed Zdenek did pick up the red -lined
plans and comment letter last Friday, July 7th. You will have to get the appropriate plans from him.
Steve Olt
Project Planner