HomeMy WebLinkAboutTHE GROVE AT FORT COLLINS - PDP - 16-10B - CORRESPONDENCE - ENVIRONMENTAL REPORTTHE GROVE AT FORT COLLINS PROJECT — CAMPUS CREST DEVELOPMENT, LLC UNDISTURBED WETLAND MONITORING PROGRAM January 11, 2011 Wetlands occurring along the drainage to the north of the mitigation area will be monitored to assess the effects, if any, resulting from proposed project development. Monitoring will occur on a semi-monthly basis during the growing season beginning on or about April 1 and ending on or about October 1 for a total of 12 yearly monitoring visits. Monitoring will continue for three Commmilt [LEl]: I would like to see this date reflect the dale that years beginning on or about April 1, 2011. construction begins ... or are we trying to obtain precronstruction water levels? We typically require three During each monitoring visit, the depth to ground water will be measured in Applegate well years of post -construction monitoring numbers 4, 8, 9, 10, 11, and 12. These wells are the most recent) Installed, immediate) south ( Y Y data. asset to have monitoring data woule be excellent to have on This site as of the southern border of the existing wetlands.) Ocular estimates of vegetation cover and mil. Lers]ustclear this up. j composition (dominant species) in the existing undisturbed wetlands will be made once a month at seven to eight sites employing a plot size of 10 feet x 10 feet. Six of the sites will correspond to, and be offset into the wetlands from, the wells listed above. The remaining plot(s) will be _ located to the west of well #4. In addition, a photo will be taken of each plot once a month at the - comment [LE2]: Wed like to see a map of the locations of the walls and time of the vegetation analysis. The plots will be marked in the field to facilitate repeatable proposed plot locations. I would like to see the following statement added evaluations. to this. The plots will be reviewed and approved for the initial sampling Any of the wells noted above that are eliminated due to site grading will be reinstalled in an period by the City's Environmental Planner prior to initiating sampling.' offset manner to the north to retain the ability to monitor the existing undisturbed wetlands. Comment [LE3]: How will the plots be marked In the laid, With as much The results of each individual monitoring visit will be sent electronically to the City following construction going on, permanent rebar or metal stakes might be the field evaluation. Results to be reported include the depths to groundwater in each monitoring appmpnale well and a summary of the results of the vegetation cover and composition evaluation. A final monitoring report will be submitted to the City on or before December 31 of each monitoring year. The report Will include a summary of the monitoring methodology, annual results in table format, a photo log, and a comparison with previous years monitoring data. Any negative impacts to the existing wetland vegetation community will be noted. Negative impacts would COmment [11.E4]: 1 wouktaim like to we recommendations for mitigation include changes in the existing hydrologic regime / wetland vegetation community leading to of any negative Impacts be provided by the consultant. If negative Impacts changes in vegetation density and plant community diversity that would signal a reduction in the are documented, how should we proceed? size, functions and values of these wetlands. When assessing potential negative (or positive) Another concern Is how we ensure impacts, the local affects of climate, precipitation, and land use will also be considered. Of that negative impacts are resolved, If particular note will be flows in the Larimer #2 Canal located above the proposed development. any should occur. We are discussing this internally. but will likely not have official comments until after the submittal. We welcome any suggestions your team might have. Page 1 of 1 Steve Olt From: Lindsay Ex Sent: Wednesday, January 12, 2011 11:23 AM To: 'Stephen G. Long' Cc: Glen Schlueter; Steve Olt; Nick Haws Subject: Grove Draft Wetlands Monitoring Plan Attachments: Grove Wetland Monitoring Plan - 1.11.11 - City Comments - DRAFT.docx Good morning Steve, Please find attached the City's DRAFT comments on the proposed wetland monitoring plan for the Grove. I've gone ahead and just added our comments directly to the document. Please let me know if you have any questions or if you'd like to meet with Glen and I to discuss our comments in any detail. Cheers, Lindsay Lindsay Ex Environmental Planner CDNS I City of Fort Collins IexCalfcgov.com 970.224.6143 1 /12/2011