Loading...
HomeMy WebLinkAboutTHE GROVE AT FORT COLLINS - PDP - 16-10B - REPORTS - CORRESPONDENCE-HEARING (26)the control gate could be closed would add 4.0 million gallons to the release of water. Given the time to become aware of a canal breach and to dispatch personnel to the control gate at the Poudre River, a minimum delay of two hours might be expected. This would result in a total release of water of approximately 40.3 million gallons of water. A greater delay would cause an even greater release of water. Such an event would be catastrophic, impacting the safety of the neighborhood residents, the occupants of any completed construction and causing significant property damage. Given the potential risks of such an occurrence, I respectfully request that the proposed Campus Crest project be rejected.