HomeMy WebLinkAboutTHE GROVE AT FORT COLLINS - PDP - 16-10B - REPORTS - TRAFFIC STUDY (5)TABLE 4
Short Range (2015) Total Peak Hour Operation
Intersection
Movement
Level of ServiceAM
PAA
Prospect/Centre
(signal)
EB LT
B
B
EB T/RT
B
C
EB APPROACH
B
C
WB LT
B
D
WB T/RT
B
B
WB APPROACH
B
B
NB LT
C
E
NB T
E
D
NB RT
D
D
NB APPROACH
D
D
SB LT
D
D
SB T
C
D
SB RT
C
D
SB APPROACH
C
D
OVERALL
C
C
TABLE 5
Long Range (2030) Total Peak Hour Operation
Intersection
Movement
Level of Service
AM
PM
Prospect/Centre
(signal)
EB LT
B
B
EB T/RT
C
C
EB APPROACH
B
C
WB LT
C
D
WB T/RT
B
B
WB APPROACH
B
C
NB LT
D
F
NB T
D
D
NB RT
D
D
NB APPROACH
D
D
SB LT
D
D
SB T
D
D
SB RT
C
D
SB APPROACH
D
D
OVERALL
C
C
/I LDELICH The Grove Memorandum, October 2010
-7j [—ASSOCIATES
TABLE 2
Short Range (2015) Background Peak Hour Operation
Intersection
Movement
Level of Service
AM
PM- -
Prospect/Centre
(signal)
EB LT
A
B
EB T/RT
B
C
EB APPROACH
B
C
WB LT
B
C
WB T/RT
B
B
WB APPROACH
B
B
NB LT
D
E
NB T
D
D
NB RT
D
D
NB APPROACH
D
D
SB LT
D
D
SBT
D
D
SB RT
C
D
SB APPROACH
D
D
OVERALL
C
C
TABLE 3
Long Range (2030) Background Peak Hour Operation
Intersection
Movement
Level of Service
AM
PM
Prospect/Centre
(signal)
EB LT
B
B
EB T/RT
B
C
EB APPROACH
B
C
WB LT
C
C
WB T/RT
B
B
WB APPROACH
B
B
NB LT
D
F
NB T
D
D
NB RT
D
D
NB APPROACH
D
D
SB LT
D
D
SBT
D
D
SB RT
C
D
SB APPROACH
D
D
OVERALL
C
C
-»L-DELICH
-7,1 [-ASSOCIATES
The Grove Memorandum, October 2010
TABLE 1
Current Peak Hour Operation
EB LT
A
B
EB T/RT
B
B
EB APPROACH
B
B
WB LT
B
B
WB T/RT
B
A
WB APPROACH
B
B
NB LT
D
F
Prospect/Centre
(signal)
NB T
D
D
NB RT
D
D
NB APPROACH
D
D
SB LT
D
D
SBT
D
D
SB RT
C
D
SB APPROACH
D
D
OVERALL
C
C
/ / 1—DELICH The Grove Memorandum, October 2010
j r-ASSOCIATES
DELICH ASSOCIATES Traffic & Transportation Engineering' L
2272 Glen Haven Drive Loveland, Colorado 80538
Phone: (970) 669-2061 Fax: (970) 669-5034 `7,
MEMORANDUM
TO: Chris Russ, Campus Crest
Linda Ripley, Ripley Design
Nick Haws, Northern Engineering
Ward Stanford, Fort Collins Traffic Operations
FROM: Matt Delich/Michael Delich
DATE: October 7, 2010
SUBJECT: The Grove at Fort Collins — Prospect/Centre intersection reevaluation
(File: 0920ME01)
Ward Stanford, Fort Collins Traffic Operations Engineer, requested a
reevaluation of the Prospect/Centre intersection with a change in the signal phasing and
cycle length. The phasing change was elimination of protected northbound and
southbound left -turn phases. These movements were run as permissive. The cycle
length was changed to 110 seconds in the morning peak hour and 120 seconds in the
afternoon peak hour. The cycle lengths at this intersection are governed by the cycle
lengths at the College/Prospect and Shields/Prospect intersections.
Tables 1-5 show the operation of this intersection with the recent traffic counts,
short range (2014) background traffic, long range (2030) background traffic, short range
(2014) total traffic, and long range (2030) total traffic, respectively. Calculation forms
are provided in Appendix A. In all cases, this intersection is shown to operate
acceptably, overall and for each approach. In the long range (2030) future, both with
background and total traffic, the northbound left -turn movement will operate at level of
service F in the afternoon peak hour.