Loading...
HomeMy WebLinkAboutTHE GROVE AT FORT COLLINS - PDP - 16-10B - CORRESPONDENCE - (83)Page 3 of 3 'Overall > Development Plan (ODP). Campus Crest Development has a contract with > Colorado State University Research Foundation (CSURF). CSURF is the Owner > of the land contained in the ODP. > Campus Crest Development will be the official Applicant for the Amended ODP > when it is submitted to the City for review. Since CSURF will sign the > Amended ODP as the Owner, when it is approved I review the changes to the > document with both Campus Crest Development, my Client, and CSURF to be sure > both parties understand and approve the proposed changes. > I hope this clarifies the situation for you. Please let me know if you have > further questions. > Linda Ripley, ULI, ASLA > land planning/ landscape architecture > Ripley Design Inc. > 401 W. Mountain Ave., Suite 200 > Fort Collins, CO 80521 > tel. 970.224.5828, ext. 120 > fax. 970.224.1662 > linda.ripley@ripleydesigninc.com > -----Original Message----- • From: Richard Thomas [mailto:thomasre@lamar.colostate.edu] > Sent: Friday, January 21, 2011 7:49 AM > To: Linda Ripley(linda.ripley@ripleydesigninc.com) > Cc: Steve Olt; Sue Hine; Karen Cumbo; Bob Poncelow; Kevin Barrier; roy roy; > Heather and Paul; Sarah Burnett; ohlson ohlson; Steve Dush; manvel manvel; > colleen hoffman; Smith Smith; nora jones; Rachel Mueller > Subject: Amended CSURF ODP > Dear Ms. Ripley, > I have just reviewed the meeting notes pertaining to the subject above. I > also attended the January 18th neighborhood meeting. As I recall from the > meeting, and verified by Steve Olt's notes, you stated you "technically > work" for CSURF. It seems to me that either you have a contract to represent > CSURF at the ODP meeting (and answer all questions put to CSURF) or you do > not. You may wonder why I am asking this question. Currently I am studying > the Development Process and am interested in the legal ramifications of an > applicant not being present at meetings whether it is neighborhood, P&Z, or > other. At your earliest convenience please let me know if you have a > contract with CSURF, and at your convenience I will be happy to come to your > office and read the document. > Sincerely, > Richard Thomas= 1 /26/2011 1 . Page 2 of 3 land planning/ landscape architecture Ripley Design Inc. 401 W. Mountain Ave., Suite 200 Fort Collins, CO 80521 tel. 970.224.5828, ext. 120 fax. 970.224.1662 linda.ripley@ripleydesigninc.com -----Original Message----- From: Steve Olt [mailto:SOLT@fcgov.com] Sent: Tuesday, January 25, 2011 4:02 PM To: 'linda.ripley@ripleydesigninc.com' Subject: FW: Amended CSURF ODP Linda, Just an interesting observation about Mr. Thomas's e-mail. December 18th was a Saturday and I cannot recall any conceptual reviews ever being held on a Saturday. To my knowledge the most recent ODP conceptual review was on Monday, January loth. Also, conceptual reviews are for the applicant and City staff to discuss a development proposal. The neighbors are there to observe only and, therefore, do not ask questions. Steve -----Original Message ----- From: Richard Thomas [mailto:thomasre@lamar.colostate.edu] Sent: Tuesday, January 25, 2011 3:50 PM To: linda.ripley@ripleydesigninc.com Subject: Re: Amended CSURF ODP Linda, Thank you very much for your response. It is clear and I• am sure I understand. I also understand that you have a difficult job and I hope you realize that it is equally or more difficult for the homeowners in the vicinity of the ODP to keep up with all of the technicalities, changes, variances, etc. This is my line of reasoning: At the December 18th conceptual meeting CSURF is/was the owner of the land. Campus Crest may have an option to lease the land and at some point may become the lease holder while CSURF remains the owner. It is my opinion that at the December 18th ODP meeting CSURF had to be the ODP applicant. Therefore the applicant, CSURF, was not at the meeting to answer our questions. This does concern me. Sincerely, Richard Thomas On Jan 24, 2011, at 5:34 PM, Linda Ripley wrote: > Richard, > This is the contractual situation. Ripley Design Inc. has a contract with > Campus Crest Development, the proposed Developer for Parcel C of the 1 /26/2011 Pagel of 3 Steve Olt From: Steve Olt Sent: Wednesday, January 26, 2011 8:10 AM To: 'linda.ripley@ripleydesigninc.com' Subject: RE: Amended CSURF ODP Linda, Yes, I am reasonably sure that he is referring to the January 18th neighborhood meeting. It seems like having to be correct with information is a one-way street. Below is the most recent message sent by Mr. Thomas. I do not see anything confidential about it. -----Original Message ----- From: Richard Thomas [mailto:thomasre@lamar.colostate.edu] Sent: Saturday, January 22, 2011 5:03 PM To: Doug Hutchinson; Wade Troxell; Aislinn Kottwitz; Darin Atteberry; Lisa Poppaw Subject: Fwd: Amended CSURF ODP Dear Madams/Sirs, I am forwarding this email to you with my apologies for not including your addresses in the original email. I assure you it was an oversight. I was in a hurry to get an answer from Ms. Ripley. In addition, at the subject meeting there were questions about flooding and the city person responsible was not present to answer the neighborhood's questions. I was really upset that the neighborhoods are considered so inconsequential in the development process that some of the city staff don't attend the neighborhood meeting. Thanks for your time. Richard Thomas City staff will be having further discussions about how we might improve the development review process, if it is determined to be necessary. Steve Olt -----Original Message ----- From: Linda Ripley [mailto:linda.ripley@ripleydesigninc.com] Sent: Tuesday, January 25, 2011 4:29 PM To: Steve Olt Subject: RE: Amended CSURF ODP Steve, Maybe he is referring to the Neighborhood meeting held on the 18th? Can you forward the email he sent to City Council or is that considered confidential? Linda Ripley, ULI, ASLA 1 /26/2011