Loading...
HomeMy WebLinkAboutTHE GROVE AT FORT COLLINS - PDP - 16-10B - CORRESPONDENCE - DRAINAGE REPORT (18)Page 2 of 2 in a hierarchal order. You will notice that I have a few question marks. Would you be able to help me fill-in the blanks and/or offer any additional studies? Spring Creek Master Drainage Plan, May 5, 2003, Anderson Consulting Engineers, Inc. Flood Insurance Rate Map (FIRM) Panel 0987F, Effective Date December 19, 2006, Federal Emergency Management Agency (FEMA). PROPOSED (IN -PROCESS) PMR? Alternative Analysis for the Design of the Mason Street Outfall, November 2010, Ayres Associates. Preliminary Drainage and Erosion Control Report for The Grove at Fort Collins, December 8, 2010, Northern Engineering. I realize this may spill over to the Master Planning folks, but I figured I'd send it your way first. Feel free to offer any other comments or feedback. Thanks! Nick Haws, PE, LEED AP NORTHERN ENGINEERING 1 /27/2011 Page 1 of 2 Steve Olt From: Glen Schlueter Sent: Thursday, January 27, 2011 11:44 AM To: 'Nick Haws'; Wes Lamarque Cc: Steve Olt Subject: RE: CSURF C.A.T. Amended ODP Master Drainage Plan/Report Thanks Nick, I will ask Wes to take a look at it and then he and I can discuss it. I won't be forwarding it to Kevin Barrier without your permission. I don't think the ODP report will be the one that he wants to attack anyway. From: Nick Haws [mailto:nick@northernengineering.comj Sent: Wednesday, January 26, 2011 3:45 PM To: Wes Lamarque Cc: Glen Schlueter Subject: RE: CSURF C.A.T. Amended ODP Master Drainage Plan/Report We did not submit the ODP Amendment today, but here's what the report would have looked like. Our team is spending another 30-60 days from the date of our 01.19.11 design charrette with the IBE to further work with the neighborhood on a collaborative, green/sustainable design process... From: Wes Lamarque [maiIto: WLAMARQUE@fcgov.com] Sent: Thursday, January 20, 2011 1:24 PM To: Nick Haws Cc: Glen Schlueter Subject: RE: CSURF C.A.T. Amended ODP Master Drainage Plan/Report In red is the Date, Author of Spring Creek Master Drainage Plan. We will get you the other questions soon. Wes From: Nick Haws [mailto:nick@northernengineering.comj Sent: Thursday, January 20, 2011 1:11 PM To: Glen Schlueter Cc: Wes Lamarque Subject: CSURF C.A.T. Amended ODP Master Drainage Plan/Report Glen, We spoke about the required Master Drainage Plan/Report a couple weeks ago. Although it may not seem very applicable or of much value in this particular instance, we realize that the code requires this information to be submitted along with the ODP. However, since the ODP area has been studied in much greater detail with other reports, and since the ODP Amendment is not proposing any substantial changes affecting major drainage patterns, we agreed that it would be appropriate to simply reference the various other reports of significance. I've taken an initial stab at outlining the studies that I think best apply to the ODP parcels. I've attempted to put them 1/27/2011