Loading...
HomeMy WebLinkAboutRAM'S CROSSING K2 APARTMENTS - BDR - BDR110004 - REPORTS - DRAINAGE REPORTb LEGEND CN O c°xciRriM.s�loui IP O °srlRiooew O NOTES: 1. vFE VNOSCA!£fiAN FOftxEVEGEfAiIOM YET1100SAIOOETAL6IXIIiNGCCIyyTRGlpl.WY571LORTli®EO/JIONOE UIGExxACTNECONSIMR.TICN9W1ffsEEEIED.WO YIALl1m RAOYPIEF 11 OiTKCrtYK FCRI cOLLNSSfIXiM ORIYUGECOe6'1RUCTgN 5T410IRp5. 2. TNECONIRAG WRLBERESPONSIBLEFORALLMS RBEMGFPINOI UISST.TBYI2EOINACCOROANC£WRNTXE S RMWATERMMY MEWRANANDSTATESTORMWATEROISCNAROEPERMIT. a zWg. Y y <O N° N SC jN6N `5y 0 z p 9 W OWO� x QUx�O¢ x=LL C. COLORAOOSTATE UNIVERSITY P - •rtt i COL ORAOOS ATE UNIVERSITY _ — x`naal�Bl r, 9/J .LANE IL E3 EEf r --, '°_� (' J z- weaLc �6 z O O z � F ui Oy Z - - 0 O \ x°2 xSxNl RiEil x.BAG .ROVE .xp I� 2 RAxo� iw W O R I 1 �1 IX/577NG BU/LO/NG r—xb 1TIR' _ Jlei a 1- W CALL UMITY NOYFIU E[HrER C COLORAW 811 DeLL x-wsl<ss o.rs N .o..IaT ®fG 11[ u 0.11[,IO YUXOWOiIXYO iLHx VxUMi. PRELIMINARY m gggE NOT FOR CONSTRUCTION n 0 OTY CF roBr CaUMS. C«IX ADO U1LITY PLAN APPROVAL AwRoceu ary 04@ aE"ED S.: ..R....sR..R, �..�. OIE"ED SY: irPu,.R. u1Vle OIEIXED BY Mea r Yw,oi O MD BY: n.mc tw,[t. C E"ED BY: v<axo.,ui PROJ. M. I IYOYOI I a Calculation Results Summary Scenario: Base »» Info: Subsurface Network Rooted by: 0-1 »» Info: Subsurface Analysis iterations: 1 »» Info: Convergence was achieved. CALCULATION SUMMARY FOR SURFACE NETWORKS ( Label I Inlet I Inlet I Total I Total I I Type I I Intercepted I Bypassed I I I I Flow I Flow I I I I (cfs) I (cfs) I-------I---------------t----------------------I-------------I--------- I I-3 1 Generic Inlet I Generic Default 100% I 0.00 I 0.00 11-2 1 Generic Inlet I Generic Default 100% 1 0.00 1 0.00 I I-1 ----------------------------------------------------------------------- I Generic Inlet I Generic Default 100% 1 0.00 1 0.00 CALCULATION SUMMARY FOR SUBSURFACENETWORK WITH ROOT: 0-1 Capture I Gutter I Gutter I Efficiency I Spread I Depth I M I (ft) I I (ft) I I I ----------- 100.0 I -------- 1 0.00 I -------- I 1 0.00 1 100.0 1 0.00 1 0.00 1 100.0 ------------------------------ 1 0.00 1 0.00 1 I Label I Number I Section I Section I Length I Total I Average I Hydraulic I Hydraulic I I I of I Size I Shape I (ft) I System I Velocity I Grade I Grade I I I Sections I I I I Flow I (ft/s) I Upstream I Downstream I I I I ---------I----------I--------I-------- I I I (cfs) I ---------- I (ft) I ----------- (ft) I ------------I I - ------I---------- I P-1 1 I 1 1 12 inch I Circular 1 7.50 1 4.80 I 1 6.11 I I 1 20.57 1 20.44 I I P-2 1 1 1 12 inch I Circular 1 22.10 1 4.80 1 6.11 1 21.10 1 20.86 1 I P-3 1 1 1 12 inch I Circular 1 38.70 1 4.80 1 6.11 1 21.80 1 21.39 1 I P-4 1 1 1 12 inch I Circular 1 42.50 1 3.20 1 4.07 1 22.30 1 22.09 1 I P-5 1 ----------------------------------------------------------------------------------------------- 1 1 12 inch I Circular 1 42.50 1 1.60 1 2.04 1 22.48 1 22.43 1 I Label I Total I Ground I Hydraulic I Hydraulic I I I System I Elevation I Grade I Grade I I I Flow 1 (ft) I Line In I Line Out I I I (cfs) I ----------- I (ft) ----------- I (ft) I ----------- I - ------I-------- 1 0-1 I 4.80 I 1 23.30 I 1 19.53 I I 1 19.53 1 I J-1 I 4.80 1 23.20 1 20.86 1 20.57 1 I J-2 1 4.80 1 23.00 1 21.39 1 21.10 1 11-1 1 4.80 1 22.70 1 22.09 1 21.80 1 11-2 1 3.20 1 22.70 1 22.43 1 22.30 1 I-3 1 ------------------------------------------------------ 1.60 1 22.70 1 22.51 1 22.48 1 Completed: 11/02/2011 12:28:29 PM - Title: RAM K2 - Minor Storm Sewer I Project Engineer. Interwest Consulting Group x1 -AdrainageNdesignVam k2 stonn.stm Interwest Consulting Group StormCAD v5.5 (5.5005] 11/02/11 12:29:01 PM 0 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA +1-203-755-1666 Page 1 of 1 Label: 1-3 Rim: 22.70 ft Sump: 20.30 ft Profile Scenario: Base Profile: Profile - 1 Label: 1-2 Rim: 22.70 ft Sump: 20.08 ft Label: P-5 Up. Invert: 20.30 ft Dn. Invert: 20.08 ft L: 42.50 ft Size: 12 inch S:0.005176ft/ft Scenario: Base Label: 1-1 Rim: 22.70 ft Sump: 19.87 It Label: PA Up. Invert: 20.08 It Dn. Invert: 19.87 ft L: 42.50 It Size: 12 inch S: 0.004941 fUft Label: J-2 Label: J-1 Rim: 23.00 ftRim: 23.20 ft Sump: 19.67Wmp: 19.56 trabel. 0-1 Rim: 23.30 It �} 100 9x- Sump: 19.53 ft Label: P-1 Up. Invert: 19.56 ft Label: P-3 Label: P-2 Dn. Invert: 19.53 It Up. Invert: 19.87 ft Up. Invert: 19.67 fL: 7.50 ft Dn. Invert: 19.67 ft Dn. Invert: 19.56 (Size: 12 inch L: 38.70 ft L: 22.10 ft S: 0.004000 Wit Size: 12 inch Size: 12 inch S: 0.005168 ft/ft S: 0.004977 fUft 25.00 20.00 Elevation (ft) 15.00 0+00 1+00 2+00 Station (ft) Title: RA MK2 - Minor Storm Sewer Project Engineer: Interest Consulting Group x:\...\dral ngye\deslgn\ram k2 storm.stm Intsrweet Consulting Group StormCAD v5.5 IS 50051 11/02/11 2:27:38 PM m Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA +1-203-755-1666 Page 1 of 1 Scenario; Base J-P-1 0-1 v 1-3 P_ 5 1-2 P-4 Zx. 1 P-3 Title: RAM K2 - Minor Storm Sewer Project Engineer: Interwest Consulting Group x:\...\drainage\design\ram k2 storrn.stm Interwest Consulting Group Storm CAD v5.5 (5.5005) 11/02/11 12:27:51 PM ®Haestad Methods, Inc. 37 Brookside Road Waterbury, CT oe708 USA +1-203-755-1666 Page 1 of 1 Interwest Consulting Group 1218 West Ash, Suite C Windsor, Colorado RATIONAL METHOD PEAK RUNOFF (100-YEAR) LOCATION: RAM CROSSING K2 PROJECT NO: 1144-069-01 COMPUTATIONS BY: MPO DATE: 11 /2/2011 100-yr storm, CI = 1.25 DIRECT RUNOFF CARRY OVER TOTAL REMARKS Des. Point Area Design. A (ac) C Cf tc (min) i (new) (in/hr) O (100) (cfs) from Design Point O (100) (Cfs) O(100)101 (cfs) Existing 1.94 0.98 5.0 9.95 19.0 19.0 Existing Site Proposed Total 1.94 0.95 5.2 1 9.51 17.5 1 17.5 Proposed Total Flow Proposed Central 0.55 0.88 5.0 9.95 4.8 4.8 Area Draining to Area Inlets and 12" PVC Q=CiA Q = peak discharge (cfs) C = runoff coefficient I = rainfall intensity (in/hr) from IDF curve A = drainage area (acres) NOTE: Intensity based on Figure 3-1, 1999 (Regional Analysis) Flow.xls 0100 Interwest Consulting Group 1218 West Ash, Suite C Windsor, Colorado LOCATION: PROJECT NO: COMPUTATIONS BY: DATE: 10-yr storm, Cf = RAM CROSSING K2 1144-069-01 MPO 1 I /2/201 1 1.00 RATIONAL METHOD PEAK RUNOFF (10-YEAR) DIRECT RUNOFF CARRY OVER TOTAL REMARKS Design Point Tributary Sub -basin A (ac) C Cf tc (min) i (new) (iNhr) Q (10) (Cfs) from Design Point Q (10) (Cfs) Q(10)tot (Cfs) Existing 1.94 0.79 7.0 4.31 6.6 6.6 Existing Site Proposed Total 1.94 0.76 1 7.3 4.24 6.2 1 6.2 Proposed Total Flow Proposed Central 0.55 0.71 5.3 4.87 1.9 1.9 Area Draining to Area Inlets and 12" PVC Q=CICiA Q = peak discharge (cfs) C = runoff coefficient CI = frequency adjustment factor I = rainfall intensity (in/hr) from IDF curve A = drainage area (acres) NOTE: Intensity based on Figure 3-1, 1999 (Regional Analysis) Flow.xls - Q10 Interwest Consulting Group 1218 West Ash, Suite C Windsor. Colorado LOCATION: PROJECT NO: COMPUTATIONS BY DATE: 2-yr storm, Cl = RAM CROSSING K2 1144-069-01 MPO 11/2/20I1 1.00 RATIONAL METHOD PEAK RUNOFF (2-YEAR) DIRECT RUNOFF CARRY OVER TOTAL REMARKS Design Point Tributary Sub -basin A (ac) C Cf tc (min) i (new) (in/hr) Q (2) (cfs) from Design Point Q (2) (cfs Q(2)tot (cfs) Existing 1.94 0.79 7.0 2.52 3.8 3.8 Existing Site Proposed Total 1.94 0.76 7.3 2.54 3.7 3.7 Proposed Total Flow Proposed Central 0.55 0.71 5.3 2.85 1.1 1.1 Area Draining to Area Inlets and 12" PVC Q=CfCiA Q = peak discharge (cfs) C = runoff coefficient Cf = frequency adjustment factor I = rainfall intensity (in/hr) from IDF curve A = drainage area (acres) NOTE: Intensity based on Figure 3-1, 1999 (Regional Analysis) Flow.xls Q2 Intemest Consulting Group 1218 West Ash, Suite C Windsor. Colorado LOCATION: PROJECT NO: COMPUTATIONS BY: DATE: 100-yr storm RAM CROSSING K2 1144-069-01 MPO 11/2/2011 C1= 1.25 STANDARD FORM SF-2 TIME OF CONCENTRATION -100 YR SUB -BASIN DATA INITIAL /OVERLAND TIME (0) TRAVEL TIME I GUTTER OR CHANNEL FLOW (R) tc CHECK (URBANIZED BASIN) FINAL tc REMARKS DESIGN POINT SUBBASIN(s) (1) Area (ac) (2) C (3) C'CI Length N (4) Slope (%) (5) ti (min) (6) Length (ft) (7) Slope (%) (8) n Manning rough. Val. (IVs) (9) it (min) (10) tc = ti+a (11) Total 111) (12) IC.(l/180)+10 (min) (13) (min) (14) Existing 1.94 0.79 0.98 40 1.0 1.3 510 1.50 0.016 2.5 3.5 4.8 5501 13.1 5.0 Existing Site Proposed Total 1.94 0.76 0.95 40 1.0 1.7 510 1.50 0.016 2.5 3.5 5.2 550 13.1 5.2 Pro osed Total Flow Proposed Central 1 0.55 0.71 0.88 40 1.0 2.5 1401 2.20 0.016 3.0 0.8 3.3 180 11.0 5.0 Area Draining to Area Inlets and 12- PVC EQUATIONS: tc=ti+it ti=11.87(1.1- CC, )Lo.$)/Sv3 It = L/Vel. Velocity from Manning's Equation with R=0.1 (corresponds to Figure 3-3 of City of Fort Collins Design Manual) final tc = minimum of ti + If and urbanized basin check min. tc = 5 min. due to limits of IDF curves Flow.xls TOG-100 Interest Consulting Group 1218 West Ash, Suite C Windsor, Colorado LOCATION: PROJECT NO: COMPUTATIONS BY: DATE: 10-yrstorm RAM CROSSING K2 1144-069-01 MPO 11/2/2011 C1= 1.00 STANDARD FORM SF-2 TIME OF CONCENTRATION - 10 YEAR SUB -BASIN DATA INITIAL /OVERLAND TIME(13) TRAVEL TIME / GUTTER OR CHANNEL FLOW (tt) to CHECK (URBANIZED BASIN) FINAL to REMARKS DESIGN POINT SUBBASIN(s) (1) Area (ac) (2) C (3) Length (11) (4) Slope (%) (5) ti (min) (6) Length (Itl (71 Slope (%) (8) n Manning rough. Vel. (fi (9) tl (min) (10) to - ti+It (11 Total L (11) (12) to-(V180)+10 (min) (13) (min) (14) Existing 1.94 0.79 40 1.0 3.6 510 1.50 0.016 2.5 3.51 7.0 550 13.1 7.0 Existing Site Proposed Total 1.94 0.76 40 1.0 3.9 510 1.50 0.016 2.5 3.5 7.3 550 13.1 7.3 Proposed Total Flow Proposed Central 0.55 0.71 401 1.01 4.5 140 2.20 0.016 3.0 0.8 5.3 180 11.0 5.3 Area Draining to Area Inlets and 12" PVC EQUATIONS: tc=ti+tt ti=[1.87(1.1-CC,)L0.5)/S"3 tt = UVel. Velocity from Manning's Equation with R=0.1 (corresponds to Figure 3-3 of City of Fort Collins Design Manual) final tc = minimum of ti + It and urbanized basin check min. tc = 5 min. due to limits of OF curves Flow.xls TOC-10 Interwest Consulting Group 1218 West Ash, Suite C Windsor, Colorado RUNOFF COEFFICIENTS & % IMPERVIOUS LOCATION: RAM CROSSING K2 PROJECT NO: 1144-069-01 COMPUTATIONS BY: MPO DATE: 1 1 /2/201 1 Recommended Runoff Coefficients from Table 33 of City of Fort Collins Design Criteria Recommended % Impervious from Urban Storm Drainage Criteria Manual Streets, parking lots (asphalt): Concrete: Roofs: Gravel: Lawns (flat <2%, heavy soil): Runoff coefficient C %, Impervious 0.95 100 0.95 96 0.95 90 0.50 40 0.20 0 NOTE - All impervious was lumped into this category. SUBBASIN DESIGNATION TOTAL AREA (ac.) TOTAL AREA (sq.ft) PAVED AREA (sq.ft) CONCRETE AREA (sq.ft) ROOF AREA (sq.10 GRAVEL AREA (sq.ft) LANDSCAPE AREA (sq.ft) RUNOFF COEFF. ID) % Impervious REMARKS Existing 1.94 84,460 66,100 0 0 0 18,360 0.79 78 Existing Site Proposed Total 1.94 84,460 63,000 0 0 0 21,460 0.76 75 Proposed Total Flow Proposed Central 0.55 24.000 16.200 0 0 0 7,800 0.71 68 Area Draining to Area Inlets and 12" PVC EDuations - Calculated C coefficients & % Impervious are area weighted C=£(Ci Ai) /At Ci = runoff coefficient for specific area, Ai Ai = areas of surface with runoff coefficient of Ci n = number of different surfaces to consider At = total area over which C is applicable; the sum of all Ai's Flow.xls Cval ■ /�/rw�iiiwriwwsivisow�ij_w�%/%� �imns� �nm� n No Text Mr. Wes Lamarque November 3, 2011 Page 2 of 2 there is not an opportunity to install an underdrain, but smaller storms will be slowed and allowed to infiltrate in this area. Once the filter area is overwhelmed, the stormwater will overtop the sump and flow to the northeast as it does today. The existing and proposed imperviousness of the lot was compared as a part of this study. Exhibits are attached which show that the existing imperviousness is 78% while the proposed improvements will lower the imperviousness to 75%. This is mostly due to the required 5' offset on the north and east from the property line to the proposed parking. Because the impervious area will decrease with this project, detention is not required. Attached is a summary of the flows for the existing and the proposed site. With the reduction of impervious area by 3%, the 100-year flow off the site is reduced by 8%. The proposed 12" PVC storm system is the only hydraulic system on the project. Our calculations show a 100 year flow to this system of 4.8 cfs. The systems is a series of small sumps and overtops to the east and west prior to reaching the existing or proposed building finished floors. We have verified that the system can convey the 100-year flow, with the safeguard the overtopping occurs below the finished floors. This area has previously been studied in a master drainage plan for the CSU campus by Ayers Associates and is included in the Braiden Hall Basin. All possible measures have been taken to provide water quality for the site through the proposed grass swale and sand filter and the lengthening of flow paths from existing conditions. The proposed expansions and improvements have been designed with provisions for safe and efficient control of stormwater runoff in a manner that will not adversely affect the downstream detention system and will improve water quality for the Ram Crossing K2 project. Overall, it is evident that the proposed revisions will have a positive impact on the proposed stormwater management system. We appreciate your time and consideration in reviewing this submittal. If you have any questions or need additional information please feel free to call at any time (970) 674-3300 Ext. 102. Sincerely, Michael Oberlander, P.E. Colorado Professional Engineer 34288 Interwest Consulting Group Attachments INTERWEST IM C O N 5 U L T I N G G R O U P November 3, 2011 Mr. Wes Lamarque City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, CO 80522 Re: Ram Crossing K2 — Storm Drainage Report Dear Wes, We are pleased to submit for your review and approval this drainage letter showing the drainage impacts from the proposed expansion and improvements to the Ram Crossing K2. The project is located at 914 West Lake Street and is a part of Lots 12 and 13 of College Heights Addition. The site currently has an existing apartment complex and large asphalt parking lot on the site. The project will expand the building, reconfigure and significantly reduce the parking area, and provide for stormwater quality improvements. The area of the site that will be improved is approximately one acre. The site is surrounded by Colorado State University campus and is bounded on the south by Lake Street. There are no offsite flows entering the site. Today, the entire site sheet flows north and east.to the northeast comer of the site. With the building addition and reconfiguration, all water will still flow to the north and east, but around the new building in swales and in a small storm pipe system (lengthening several of the existing flow paths). Please refer to the attached erosion control plan. The site is required to provide water quality treatment, but there is no adjacent storm sewer available near the site and it must flow overland in the northeast corner. Because of the lack of an adjacent, below grade outfall, it is not feasible to install a standard water quality pond. Today, there is no treatment as stormwater leaves the asphalt parking and the site (the asphalt is on the existing property lines). In an effort to improve the stormwater quality, swales have been added on the west and north sides of the site. The swale on the west is at slightly more than 2% and the swale on the north is consistently at 1 %. We propose that neither Swale have a trickle pan in an effort to encourage infiltration. The swale on the north is easily maintained and over 20 feet from the proposed building, so we are not concerned about encouraging infiltration here. At the northeast corner of the site, we propose a modified "sand filter" with a 10'x20' area being lowered approximately 6" below the existing grade with 12" of cobble on 24" of sand. Again, 1218 WEST ASH, SUITE C WINDSOR, COLORADO 80550 TES. 970.674.3300 id%. 970.674.3303