Loading...
HomeMy WebLinkAboutTHE GROVE AT FORT COLLINS - FDP - FDP110015 - CORRESPONDENCE -I � \ 1 / I I / LOT 1 �BLp6rrij , , �' • Page I of 1 Steve Olt From: Steve Olt Sent: Thursday, November 10, 2011 1:46 PM To: Angelina Sanchez -Sprague Cc: Marc Virata; Lindsay Ex; Sheri Langenberger; Glen Schlueter; Wes Lamarque; Ted Shepard Subject: The Grove at Fort Collins Attachments: Setback.pdf Angelina, I would like to add this potential building setback variance request to the Planning Coordination agenda for next Tuesday, November 14th. The red dashed line reflects the required 15' building setback from the Rolland Moore Drive right-of-way. The applicant is suggesting that the southwest comer of Building 1 at the west end of The Grove at Fort Collins encroach slightly into the setback area to give some flexibility in the placement of the retaining wall along the wetland and the storm sewer line in that area, northeast of the building. Steve 11/10/2011