HomeMy WebLinkAboutTHE GROVE AT FORT COLLINS - FDP - FDP110015 - CORRESPONDENCE -I � \
1 /
I
I /
LOT 1
�BLp6rrij , , �' •
Page I of 1
Steve Olt
From: Steve Olt
Sent: Thursday, November 10, 2011 1:46 PM
To: Angelina Sanchez -Sprague
Cc: Marc Virata; Lindsay Ex; Sheri Langenberger; Glen Schlueter; Wes Lamarque; Ted Shepard
Subject: The Grove at Fort Collins
Attachments: Setback.pdf
Angelina,
I would like to add this potential building setback variance request to the Planning Coordination agenda
for next Tuesday, November 14th. The red dashed line reflects the required 15' building setback from
the Rolland Moore Drive right-of-way. The applicant is suggesting that the southwest comer of
Building 1 at the west end of The Grove at Fort Collins encroach slightly into the setback area to give
some flexibility in the placement of the retaining wall along the wetland and the storm sewer line in that
area, northeast of the building.
Steve
11/10/2011