Loading...
HomeMy WebLinkAbout429 S. WHITCOMB STREET CARRIAGE HOUSE - PDP - PDP130006 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTI � o h � / I PROPOSED GRADING SCALE 1' = 30' ` I Sheldon House B&B 616 W Mulberry St — a• A a PROPOSED LY CARRIAGE HOUSE 5oO5 so I � J I � f I 1 I (0o otK. PROPOSED GARAGE ADDITION I) FF 5OOs5O qj i e� 20' ALLEY h 100 YEAR FLOOD PLAIN BOUNDARY i BENCH MARKS CITY OF FORT COLLINS BENCH MARK #1-11 ELEVATION = 5005.44 A CITY OF FORT COLLINS ALUMINUM CAP MARKED 1-11, LOCATED AT THE SOUTHEAST CORNER OF MULBERRY STREET AND LOOMIS AVENUE, AT THE NORTHEAST CORNER OF A CONCRETE TRAFFIC SIGNAL BASE. 421 South I Whitcomb i S WHI TCOMB A VENUE /100 YEAR FLOOD PLAIN BOUNDARY =s— FO R B E S ENGINEERING 2908 CHERLY STREET, CLIENT CONOR FZANAGAN PREPARED BY KEWN FORBES PROJECT 429 S WHITCOMB ST DRAWN: D47E Ft. Collins, Colorado 80524 Tele: (970) 295-4874 FT COLLINS, CO KEF 2-25-13 SHEET T1TLE.• PROPOSED GRADING PROJECT DWG FULL SERVICE OMWUM aW7M AHD DESM aM/VTRUC7UR4i- FOUAMLAND & MLNWW RAWNiG & DRAINAGE PLAN 13-1720 1720—PR 0 1 0 1 C r � 1 Cf) � � I � � I I / I (/ EXISTING GRADING SCALE 1' = 30' Sheldon House B&B 616 W Mulberry St L---------- — �— � - 20' ALLEY 1 100 YEAR FLOOD PLAIN BOUNDARY I � 1 / i BENCH MARKS CITY OF FORT COLLINS i I BENCH MARK #1-11 1 g I ELEVATION = 5005.44 \ I ss I A CITY OF FORT COLLINS Pam/ ALUMINUM CAP MARKED 1-11, LOCATED AT THE I SOUTHEAST CORNER OF I MULBERRY STREET AND LOOMIS AVENUE, AT THE NORTHEAST CORNER OF A 4 CONCRETE TRAFFIC SIGNAL r S�. BASE. 421 Sou th / Whitcomb I 9 / — — — — — — ---- \ S. WH/ TCOMB A VENUE FOR B ES ENGINEERING 2908 CHERLY STREET, CLIENT.• CONOR FLANAGAN PREPARED BY KEVIN FORBES PROJECT* 429 S WHITCOMB ST DRAWN: DATE Ft. Collins, Colorado 80524 Tele: (970) 295-4874 FT COLUNS, CO KEF 2-25-13 SHEET TTTLE.• DOS77NG GR4DING PROJECT DWG FUu saMcF DONM DR4MM AA0 DESM G ffvS7RUCR/RK, Fat MGDVS MW & MUMMAL HMMM & DRAINAGE PLAN 13-1720 1720-EX the provision of perimet. , silt fencing and a vehicle trackh.b control mat if necessary. Both the garage addition and carriage house will be constructed with a finished floor elevation 18 inches above the corresponding base flood elevation (BFE) as defined by the City of Fort Collins Flood Plain maps. It is my conclusion that with proper construction practice and observance to the set finish floor elevation, no adverse affects to the site or to the surrounding properties are anticipated from the proposed improvement of this site. Sincerely, o�P�O R o9!s�F "65 Kevin Forbes, P.E. #3 • •.,�!(� SS/nn�n� E� 2 f a FuRBES ENGINEERINu Full Service Civil & Structural Engineering February 25, 2013 Glen Schlueter City of Fort Collins Stormwater Engineering 700 Wood Street Fort Collins, CO 80521 RE: Grading & Drainage Certification Letter for site improvements at 429 So Whitcomb St. Fort Collins, CO 80521 Mr. Schlueter, This letter and attached exhibits are to serve as a drainage certification for the above referenced single family residential property. The property is located at the Southeast corner of South Whitcomb and West Mulberry. The home was originally built in approximately 1910 and presently has one single family residence and a detached garage/outbuilding on the property (see attached existing grading plan). The surrounding neighborhood is a mix of small business and single family residential lots. Proposed site improvements include an 828 square foot garage addition to the existing home along with a 572 square foot carriage house. Site improvements will also include 1143 square feet of concrete to be used for drives and walks. The spot elevations and contours for both the existing and proposed grading & drainage plans are based on survey data provided by Edmonds Land Surveying, Inc. dated May 18, 2012. Historic storm water runoff presently is directed towards the street gutter systems of both Whitcomb (front yard) and Mulberry (south side yard). This will be maintained with the proposed improvements using roof gutters and downspouts to direct the storm water runoff towards the south and east and into the street gutter system (see attached proposed grading plan). Any necessary erosion control measures will be provided at the time of construction including, but not limited to,