Loading...
HomeMy WebLinkAboutPROSPECT STATION - PDP - PDP130004 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYI. INTRODUCTION This Transportation Impact Study (TIS) addresses the capacity, geometric, and control requirements for the proposed Prospect Station. The proposed Prospect Station site is located along the south side of Prospect Road just west of the railroad tracks in Fort Collins, Colorado. During the course of the analysis, numerous contacts were made with the project planning consultant (TB Group), the project architect (R4 Architects), the project civil engineer (Interwest Consulting Group), and the City of Fort Collins Traffic Engineer. The Transportation Impact Study Base Assumptions form and related documents are provided in Appendix A. This study generally conforms to the format set forth in the Fort Collins TIS Guidelines in the "Larimer County Urban Area Street Standards" (LCUASS). Scoping discussions were held with the Fort Collins Traffic Engineering staff. The study involved the following steps: - Collect physical, traffic, and development data; Perform trip generation, trip distribution, and trip assignment; - Determine peak hour traffic volumes; - Conduct capacity and operational level of service analyses on key intersections, - Analyze signal warrants; - Conduct level of service evaluation of pedestrian, bicycle, and transit modes of transportation LDELICH Prospect Station TIS, February 2013 �1 ' rASSOCIATES page 1 INF.1Eel �7T3�X+'? 1. Current Peak Hour Operation .............................. .......................................... ........ ... 7 2. Trip Generation......................................................................................................... 8 3. Short Range (2018) Background Peak Hour Operation .......................................... 20 4. Long Range (2035) Background Peak Hour Operation ........................................... 20 5. Short Range (2018) Total Peak Hour Operation..................................................... 21 6. Long Range (2035) Total Peak Hour Operation...................................................... 21 LIST OF FIGURES 1. Site Location......................................................................................I...----................ 3 2. Existing Geometry ....................................................................................................4 3. Recent Peak Hour Traffic.......................................................................................... 5 4. Site Plan.................................................................................................................... 9 5. Trip Distribution....................................................................................................... 11 6. Short Range (2018) Background Peak Hour Traffic ................................................ 12 7. Long Range (2035) Background Peak Hour Traffic ................................................ 13 8. Short Range (2018) Assigned Site Generated Peak Hour Traffic ........................... 14 9. Short Range (2018) and Long Range (2035) Pass -by Site Generated Peak Hour Traffic........................................................................... 15 10. Long Range (2035) Assigned Site Generated Peak Hour Traffic ............................ 16 11. Short Range (2018) Total Peak Hour Traffic........................................................... 17 12- Long Range (2035) Total Peak Hour Traffic........................................................... 18 13. Short Range (2018) Geometry ................................................................................ 23 APPENDICES A. Base Assumptions Form B. Peak Hour Traffic Counts C. Current Peak Hour Operation/Level of Service Descriptions/Fort Collins Motor Vehicle LOS Standards (Intersections) D. Short Range (2018) Background Peak Hour Operation E. Long Range (2035) Background Peak Hour Operation F. Short Range (2018) Total Peak Hour Operation G. Long Range (2035) Total Peak Hour Operation H. Pedestrian/Bicycle Level of Service Worksheets --�� �=-DELICH Prospect Station TIS, February 2013 -7.z; r-ASSOCIATES TABLE OF CONTENTS 1. INTRODUCTION.................................................................. 1 II. EXISTING CONDITIONS... 2 LandUse................................................................................ 2 Streets............................. . .. ......... 2 ExistingTraffic............................................................................................. 2 ExistingOperation.....................•---._........._.............._........----•------------..............................6 Pederstrian Facilities. ......................... 6 BicycleFacilities .............................................................................................................. 6 Transit Facilities.....-, 6 Ill. PROPOSED DEVELOPMENT................................................................................ 8 TripGeneration............................................................................................................... 8 TripDistribution............................................................................................................. 10 Background Traffic Projections.................................................................................... 10 TripAssignment........................................................................................................... 10 SignalWarrants............................................................................................•---.......--... 10 OperationAnalysis..................................._...........................------..._....._......................... 19 Geometry.................................................................---............_..................................... 22 Pedestrian Level of Service.......................................................................................... 22 BicycleLevel of Service................................................................................................ 22 Transit Level of Service................................................................................................. 24 IV. CONCLUSIONS....................................................................................................25 Im-" 4—DELICH Prospect Station TIS, February 2013 -7/ i rASSOC IATES PROSPECT STATION TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO FEBRUARY 2013 Prepared for: R4 Architects 117 E. Mountain Avenue, Suite 205 Fort Collins, CO 80524 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive Loveland, CO 80538 Phone: 970-669-2061 FAX: 970-669-5034 Project #1311